Solicitation
CO OMAD 300(71) Minuteman Missile Access
Department of Transportation · Federal Highway Administration
Small business set-aside · Cheyenne, WY
A newer version of this notice was posted Nov 18, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 13, 2026. The notice was amended Nov 18, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 2 of 6 attachments weren't read (CO OMAD 300(71) Culverts and Routes Schedule Sepererated.zip, CO OMAD 300(71) Plans_v2.pdf). Check the attachments on SAM.gov.
The Federal Highway Administration's Central Federal Lands Highway Division (CFLHD) wants a small business to re-gravel Minuteman Missile Access Roads for F.E. Warren Air Force Base in Colorado, Nebraska and Wyoming (solicitation 6982AF27B000010, project CO OMAD 300(71)). The work is reconditioning existing gravel roads, adding four inches of aggregate surface course and replacing culverts. This is a total small business set-aside sealed bid (invitation for bid, IFB: lowest responsive, responsible bidder wins). The response due date is December 2, 2026, 2:00 PM Mountain, on paper only. The Government's price range is $5,000,000 to $10,000,000.
Who can bid
- Small business under NAICS 237310: average annual gross receipts over the past 5 years below $45 million; this is a total small business set-aside From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
- Active registration in the System for Award Management (SAM) when the bid is submitted and at award, with NAICS 237310 in the SAM profile and annual representations and certifications complete From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
- Bid guarantee (bid bond) with original signatures and corporate seals; the bid bond form shows 20 percent of the bid price From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
How to submit: Sealed paper bid delivered to the Federal Highway Administration, Central Federal Lands Division, 12300 W. Dakota Avenue, Lakewood, CO 80228 (attention Eric Grosskreuz); electronic bids are not accepted. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
- Serious: Paper bids only: no electronic submission. A bid sent by email or portal is not accepted, so a business must deliver a sealed printed bid to the Lakewood, Colorado office by the response due date. From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
- Serious: Original bid bond required: copies make the bid non-responsive. A bidder needs a surety-issued bid bond (the form shows 20 percent of the bid price) with original signatures and seals in hand before bid opening. From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
- Serious: Price all three schedules; only one is awarded. A bid missing any item in Schedule A, B or C is not eligible, and which schedule is awarded depends on funds, so the final work amount is unknown when bidding. From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
Show all 9Show fewer
- Worth checking: Amendments must be acknowledged on the SF 1442. Failing to acknowledge an amendment in Item 19 can get the bid rejected. From OMAD FY27_Pre Bid Conference_11122026 FINAL.pdf
- Worth checking: Questions were due Nov 19, 2026. Check the amendments for the agency's answers. From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
- Worth checking: Completion time not in the text read. The IFB leaves the number of calendar days to complete the work as a star and points to Section 108.01; bidders must read it to price the schedule. From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
- Minor: Schedule A mileage differs between documents. The cover page gives Schedule A as 29.02 miles, while the bid schedule shows 29.250 MILE of aggregate surface reconditioning; ask the contracting officer which governs. From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
- Minor: Registration closed Nov 10, 2026. If registering was required to take part, ask the contracting officer whether late registration is allowed. From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
- Minor: Masterworks reporting and training. The contractor must use the Government's Masterworks system for daily reports and pay notes and train its own staff. From CO OMAD 300(71) 6982AF27B000010 IFB.pdf
Read from the notice and 4 attachments. 2 of 6 not read. Show which files.
- CO OMAD 300(71) 6982AF27B000010 IFB.pdf (read)
- FP-24 Standard Specifications for Construction FHWA Federal Hwy Projects.pdf (read)
- OMAD FY27_Pre Bid Conference_11122026 FINAL.pdf (read)
- Questions and Answers CO OMAD 300(71) Minuteman Missile Access.pdf (read)
- CO OMAD 300(71) Culverts and Routes Schedule Sepererated.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
- CO OMAD 300(71) Plans_v2.pdf: not read (it couldn't be opened): open it on SAM.gov
Full summary
What they want
- Recondition existing gravel roads under FP-24 (the federal highway standard specifications) Section 303 and add 4 inches of aggregate surface course, up to 24 feet wide, with a 4% crown, all on the existing roadway bench
- Replace and clean culverts and install end sections; Schedule A lists 96,200 TON of aggregate surface course and 29.250 MILE of aggregate surface reconditioning
- Do drainage improvements and signage: object markers (14.000 EACH in Schedule A) and delineators (14.000 EACH in Schedule A)
- Price all three cumulative schedules (A, B and C); only one schedule is awarded, depending on funds
- Provide survey and staking, contractor quality control, contractor testing, a construction schedule, soil erosion control, dust control watering and temporary traffic control
- Use the Government's Masterworks system for daily reports and pay notes, and attend its training after award
- Contract type
- Sealed bid (IFB) construction contract with unit-priced pay items; three cumulative schedules, one awarded
- Period of performance
- Work starts within 10 calendar days after the notice to proceed; the completion time is set in Section 108.01 of the special contract requirements, which was not in the text read
- Place of performance
- SAM.gov: Cheyenne, WY, USA. The IFB lists Francis E. Warren Air Force Base, with road segments in Logan and Weld counties (Colorado), Kimball County (Nebraska) and Laramie County (Wyoming).
- Estimated value
- Government's estimate: between $5,000,000 and $10,000,000
- How they'll choose
- Lowest price: award to the lowest responsive, responsible bidder, subject to funds availability
- Offers due
- December 2, 2026, 2:00 PM Mountain (from the version posted Nov 13, 2026; amended since)
- How to submit
- Sealed paper bid delivered to the Federal Highway Administration, Central Federal Lands Division, 12300 W. Dakota Avenue, Lakewood, CO 80228 (attention Eric Grosskreuz); electronic bids are not accepted
What they'll judge offers on
- Total price: the Government evaluates Schedule C first, then Schedule B if funds are not available for C, then Schedule A if funds are not available for B
What to include when you submit
- Mark the sealed envelope with the bidder's name and address, the solicitation number, and the time and date bids are due
- Include Standard Form 1442 (SF 1442, the form you sign as your offer), pages A-1 and A-2, with receipt of every amendment acknowledged in Item 19
- Include the bid schedule pages A-6 through A-13 with a unit price and amount for every pay item in Schedules A, B and C
- Include the Authority to Bind certificate (pages A-14 through A-18) and the Buy American Act and Hazardous Materials pages (A-19 and A-20)
- Include an original bid bond (RFO Clause 52.228-1, pages B-1 through B-4) with original signatures and corporate seals; photocopies and faxes make the bid non-responsive
- Include the VETS-4212 declaration (page A-iii, an annual veterans' employment report) and the Bidders' Information pages B-5 through B-8
- Keep the bid open for acceptance for at least 60 calendar days after the date offers are due
- Send technical questions in one Word document to CFLContracts@dot.gov
After award, you must have
- Performance and payment bonds, to be furnished within 10 calendar days after award as Item 12 of the SF 1442 shows From CO OMAD 300(71) 6982AF27B000010 IFB.pdf:
Item 12A: PERFORMANCE AND PAYMENT BONDS: See RFO Clause 52.228-15…
Not in the notice text
- Part of this solicitation was not read: the middle of the IFB was left out (it holds Section 108.01 completion time and the wage rate pages), the plans (CO OMAD 300(71) Plans_v2.pdf) and the route and culvert files (a .zip) are attached but not read, and the FP-24 specifications were read in part.
- How many calendar days the contractor has to complete the work is not in the text read.
- The Department of Labor construction wage rates are listed as a contract document (page D-1), but the wage determination itself was not in the text read.
- The bid bond's maximum dollar amount is left blank on the form.
- A companion solicitation, ND OMAD 2025(1) (6982AF27B000011), is opened the same day at 1:00 PM Mountain; it is a separate bid.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 13, 2026
- Notice type
- Solicitation
- Office
- 6982AF Central Federal Lands Divisi, Lakewood, CO
- Product/service code
- Y1LB · Construction of Highways, Roads, Streets, Bridges, and Railways
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237310)
- Versions
5 versions have been posted, newest first.
- Nov 18, 2026 · Amendment 0004Due Dec 2, 2026
- Nov 17, 2026 · Amendment 0003Due Dec 2, 2026
- Nov 13, 2026 · Amendment 0002 (this version)Due Dec 2, 2026
- Oct 30, 2026 · Amendment 0001Due Dec 2, 2026
- Oct 27, 2026 · SolicitationDue Dec 2, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Access Road Repair National Elk RefugeThe U.S. Fish and Wildlife Service (Department of the Interior) wants a small business to resurface the deteriorating asphalt access road to the administration building at the…