Solicitation
Pip-II F-37 Building LWC Pump Room Piping System Installation
Department of Energy
AI summary Beta
This summary may miss requirements: 23 of 35 attachments weren't read (F10151066-D-F37 LCW PUMPROOM PID.pdf, F10170043-B-ALL SHEETS 11-13-26.pdf and 21 more). Check the attachments on SAM.gov.
Solicitation 378854_MR: Fermi Forward Discovery Group (FFDG), which runs Fermilab for the Department of Energy, wants a subcontractor to fabricate and install the Low Conductivity Water (LCW) pump room piping system in the F-37 Building at Batavia, Illinois. Open to all businesses (no set-aside), but each proposal needs a bid guarantee of at least 20 percent of the bid price. The response due date is December 3, 2026, 2:00 PM Central.
Who can bid
- Bid guarantee of at least 20 percent of the bid price (not more than $3 million), as a bond, certified check, cashier's check, money order or irrevocable letter of credit, furnished with the proposal From 378854_MR.pdf
- 10 years of business experience on comparable projects, or key personnel (superintendent and project management) with 10 years of experience From 378854_MR.pdf
How to submit: Email to the Procurement Specialist, Michele Reynolds, at micheler@fnal.gov, due December 3, 2026, 2:00 PM Central (Addendum 3 extended it from November 19, 2026). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (12)
From the version posted Nov 16, 2026.
- Serious: Bid guarantee of 20 percent due with the proposal. A bond or cash-equivalent worth at least 20 percent of your price (capped at $3 million) must come with the proposal, or the offer may be rejected. From 378854_MR.pdf
- Serious: Payment and performance bonds after award. A 100 percent payment bond (over $35,000) is due within 10 calendar days of the subcontract's effective date, and a 100 percent performance bond applies over $150,000. From 378854_MR.pdf
- Serious: 10 years of comparable experience. A younger firm must show key personnel with 10 years of experience; Fermilab alone decides what past work counts as relevant. From 378854_MR.pdf
Show all 12Show fewer
- Serious: Missing documents or exceptions can disqualify a proposal. Incomplete submissions may be treated as non-responsive, and exceptions to the specifications or terms may lead to disqualification. From 378854_MR.pdf
- Worth checking: Addenda must be acknowledged. Four addenda are posted; not acknowledging each may disqualify the proposal. From 378854_MR.pdf
- Worth checking: The site visit was Oct 27, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From 378854_MR.pdf
- Worth checking: Secured DOE site: access request and citizenship. Visitors without a badge file an access request at least 7 days before the meeting; the notice says attendees must be U.S. citizens with a REAL ID, while the RFP says preferably.
- Worth checking: Davis-Bacon wages and weekly certified payroll. Prevailing wage rules apply, and weekly certified payrolls go through Fermilab's LCPTracker system, free to use, with the same duty passed to lower-tier subcontractors. From 378854_MR.pdf
- Worth checking: Buy American rules for construction materials. Domestic construction materials are required unless an exception applies; Addendum 1 says the Sharpe ball valves are commercial off-the-shelf items not subject to the Act. From Addenda_1.pdf
- Worth checking: Pressure testing and welding qualification duties. You provide about 2,000 gallons of clean deionized water for the hydrotest, and welders and procedures need Fermilab approval before welding. From EXHIBIT_4_ED0042585_PIP-II_F37_Bldg_Low_Conductivity_Water_Specification.pdf
- Minor: No contact with Fermilab staff outside the named contact. Calling other FFDG staff about this RFP can get a firm disqualified. From 378854_MR.pdf
- Minor: Sample subcontract names a different project. Exhibit 24 describes PIP-II CPB HX and Pump with a 180-day period and a different wage determination, so it gives no period of performance for this job. From EXHIBIT_24_Sample Subcontract.pdf
Read from the notice and 12 attachments. 23 of 35 not read. Show which files.
- 378854_MR.pdf (read)
- PIP-II F37 Pump Room Concrete Pad Specification.pdf (read)
- EXHIBIT_4_ED0042585_PIP-II_F37_Bldg_Low_Conductivity_Water_Specification.pdf (read)
- EXHIBIT_3_ED0042584_PIP-II_Low_Conductivity_Water_LCW_System_Instrumentation_Specification.pdf (read)
- Addenda_4.pdf (read)
- Addenda_3.pdf (read)
- Addenda_2.pdf (read)
- PIP-II Pipe Support Analysis and Design Deliverable PO 683434.pdf (read)
- Flowserve pump data proposed.pdf (read)
- Addenda_1.pdf (read)
- EXHIBIT_5_F37_LCW_Electrical_Statement_of_Work_and_prints_rev_A.pdf (read)
- EXHIBIT_24_Sample Subcontract.pdf (read)
- F10151066-D-F37 LCW PUMPROOM PID.pdf: not summarized: open it on SAM.gov
- F10170043-B-ALL SHEETS 11-13-26.pdf: not summarized: open it on SAM.gov
- EXHIBIT_23_Performance Bond.pdf: not summarized: open it on SAM.gov
- EXHIBIT_21_Bid_Bond.pdf: not summarized: open it on SAM.gov
- EXHIBIT_20_SF1413-23a.pdf: not summarized: open it on SAM.gov
- EXHIBIT_19_General_Decision_Number_IL20260008_05_18_2026.pdf: not summarized: open it on SAM.gov
- EXHIBIT_18_Injury_Illness_Questionaire.pdf: not summarized: open it on SAM.gov
- EXHIBIT_17_FL-55.pdf: not summarized: open it on SAM.gov
- EXHIBIT_16__2025_Construction_Insurance_Requirements.pdf: not summarized: open it on SAM.gov
- EXHIBIT_15_SARC.pdf: not summarized: open it on SAM.gov
- EXHIBIT_14_Proposal Certifications.pdf: not summarized: open it on SAM.gov
- EXHIBIT_13_CESHC.pdf: not summarized: open it on SAM.gov
- EXHIBIT_12_014100 Quality Requirements.pdf: not summarized: open it on SAM.gov
- EXHIBIT_10_013100 ESH Requirements.pdf: not summarized: open it on SAM.gov
- EXHIBIT_9_010010 General Requirements.pdf: not summarized: open it on SAM.gov
- EXHIBIT_8_FESHM 5034 Pressure Testing.pdf: not summarized: open it on SAM.gov
- EXHIBIT_7_ADDENDUM TO FESHM.pdf: not summarized: open it on SAM.gov
- EXHIBIT_6_5031_1 Piping Systems March 2025.pdf: not summarized: open it on SAM.gov
- EXHIBIT_2_FFDG_General_Terms_and_Conditions.pdf: not summarized: open it on SAM.gov
- HX drawing for F37.pdf: not summarized: open it on SAM.gov
- EXHIBIT_25_Drawings.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
- EXHIBIT_22_Payment Bond.pdf: not summarized: open it on SAM.gov
- EXHIBIT_11_013300 Submittals.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Fabricate and install the LCW pump room piping in the F-37 Building, built from 2D layout drawings with field fitting
- Install two 50 hp centrifugal pumps, a shell and tube heat exchanger, a 250 gallon expansion tank, and filters, deionization and oxygen-removal skids
- Supply all piping, valves, hardware, instruments and filters, plus structural supports and pump foundation bases
- Weld stainless steel piping to ASME codes, with qualified welders, argon purging and in-process inspection of at least 5 percent of welds
- Do pneumatic and hydrostatic pressure tests, with about 2,000 gallons of clean deionized water supplied by the contractor, then witness pump start-up
- Do the electrical installation (power, conduit, trays, cable pulls) but not controls programming; Fermilab programs the controls and you do wiring only
- Send welder qualification records, welding procedures, material test reports, a project-specific quality control plan and final documentation
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing) construction subcontract under a request for proposal (RFP)
- Place of performance
- Fermi National Accelerator Laboratory (Fermilab), Batavia, IL, in DuPage County; F-37 Building pump room
- Estimated value
- Not stated
- How they'll choose
- Lowest price technically acceptable (LPTA): the lowest evaluated price among proposals that meet the acceptability standards, including past performance
- Offers due
- December 3, 2026, 2:00 PM Central (Addendum 3 extended it from November 19, 2026)
- How to submit
- Email to the Procurement Specialist, Michele Reynolds, at micheler@fnal.gov
What they'll judge offers on
- Experience: at least 10 years as a contractor on comparable projects, or key personnel (superintendent and project management) with 10 years
- Current/Past Projects: similar size, scope and complexity
- Compliance with safety codes and standards, and ability to meet the project requirements in the specifications and drawings
- Ability to meet the schedule timeline, shown by a project timeline
- Price: firm-fixed price on the signed Price Proposal Form (Exhibit 1)
What to include when you submit
- Send two separate parts: Part I Technical Proposal with no reference to cost, and Part II Business Management and Price Proposal; do not bind or combine them
- Part I: show 10 years of business experience on comparable projects, or key personnel with 10 years; give the years operating as a contractor
- Part I: give key personnel names with resumes and dates of experience in similar roles, with examples of prior work, references and a project timeline
- Part I: show evidence of corporate quality assurance
- Part II: signed Price Proposal Form (Exhibit 1) with a firm-fixed price, and the bid guarantee of at least 20 percent of the bid price (not to exceed $3 million)
- Part II: Subcontractor Annual Representations and Certifications (SARC) and signed Proposal Certifications, Form PUR-466; keep these as separate documents
- Include a draft small business subcontracting plan (Exhibit C, FL-55) if you are not a small business and the subcontract exceeds $750,000
- Acknowledge each addendum immediately by email, by signing it, or in your proposal
- Put any exceptions to FFDG's terms and conditions on a separate sheet on company letterhead; exceptions written on the quote form are rejected
- Mark proprietary data with the legend the RFP gives on the title page and each restricted sheet
- Proposal prices stay open for 90 calendar days after the opening date
After award, you must have
- Payment bond for 100 percent of the subcontract price within 10 calendar days after the subcontract takes effect, if the subcontract exceeds $35,000 From 378854_MR.pdf:
Payment Bond in the amount of 100 percent of the original subcontract price…
- Performance bond for 100 percent of the subcontract price, if the subcontract exceeds $150,000 From 378854_MR.pdf:
Performance Bond in the amount of 100 percent of the original subcontract price…
- Certificates of insurance before physical work starts, naming FFDG, the University of Chicago, Universities Research Association and the U.S. Government as additional insureds From 378854_MR.pdf:
Certificates of insurance of the types and in the amounts in accordance the Clause 15 of the FFDG…
- Welders qualified to the welding procedure, each also passing one joint under an FFDG weld inspector's observation From EXHIBIT_4_ED0042585_PIP-II_F37_Bldg_Low_Conductivity_Water_Specification.pdf:
All welders must be qualified using an appropriate Welding Procedure…
Current contractor
No incumbent is named. This is a new installation for the Proton Improvement Plan II (PIP-II) project; no previous contract is given.
Not in the notice text
- Many exhibits are attached on SAM.gov but were not read here: the FFDG General Terms and Conditions, bond forms, insurance requirements, the Davis-Bacon General Decision IL20260008 (Exhibit 19), general requirements, ESH requirements, submittals, quality requirements, and the proposal certification forms.
- The drawing set (Exhibit 25, a zip file) and two scanned drawings (F10170043-B all sheets and F10151066-D piping diagram) were attached but not read.
- The period of performance and project schedule for this job are not stated in the text that was read.
- No estimated value is given; the $3 million figure is only a cap on the bid guarantee.
- The Davis-Bacon wage rates in the General Decision were not read.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 16, 2026
- Notice type
- Solicitation
- Office
- Fermilab - DOE Contractor, Batavia, IL
- Product/service code
- K056 · Modification of Equipment – Construction and Building Materials
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 23822)
- Versions
5 versions have been posted, newest first.
- Nov 16, 2026 · Amendment 0004 (this version)Due Dec 3, 2026
- Nov 12, 2026 · Amendment 0003Due Dec 3, 2026 (changed)
- Nov 3, 2026 · Amendment 0002Due Nov 19, 2026
- Nov 2, 2026 · Amendment 0001Due Nov 19, 2026
- Oct 8, 2026 · SolicitationDue Nov 19, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- NTX VAMC Utility Tunnel Pump RoomOnly verified service-disabled veteran-owned small businesses (SDVOSBs) may bid on solicitation 36C25727Q0097.
- BPAs for Conference Rooms and Audio Visual SystemsOnly small businesses can bid on solicitation W15QKN27QA011 from the Department of the Army's Picatinny contracting office (ACC-RI-PICATINNY), for the DEVCOM Armaments Center.
- Repair Sanitary Waste Piping at the Mann-Grandstaff VA Medical CenterOnly service-disabled veteran-owned small businesses (SDVOSBs) can bid on solicitation 36C26027R0021, from the Department of Veterans Affairs Network Contracting Office 20, for…
- Fiber Dial Room RefurbishmentBattelle Energy Alliance, the DOE contractor that runs Idaho National Laboratory, is asking vendors to express interest in refurbishing Fiber Dial Rooms and installing…
- Chiller Compressor Replacement at the Edward Hines Jr. VA Hospital (Hines) Building 228Only certified service-disabled veteran-owned small businesses (SDVOSBs) can quote on solicitation 36C25227Q0059 from the Department of Veterans Affairs' Great Lakes Acquisition…