Sources Sought
USCG Regional Multiple Award Construction Contract (Rmacc III)
Department of Homeland Security · U.S. Coast Guard
Response due Dec 31, 2026 · Notice says small business set-aside · Juneau, AK
Market research, not a bid. Replying is free and tells U.S. Coast Guard who could do this work. Send a short reply to the contracting contact; no price is needed. See the contact
A newer version of this notice was posted Jan 8, 2026. See the latest version.
AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov. This summary may miss requirements: 5 of 17 attachments weren't read (AMEND0003_70Z08725RRMACCIII_RFIs_Extend.pdf, Consolidated QA for RMACC III.pdf and 3 more). Check the attachments on SAM.gov.
The U.S. Coast Guard (Civil Engineering Unit Juneau and other regional units) is buying a new set of construction contracts for the Department of Homeland Security. Up to about ten firms per region would win a multiple-award IDIQ (an open-ended contract where work is ordered later as task orders) covering repair, maintenance, and construction at USCG and other DHS sites across the U.S. and territories. The term is a 3-year base plus two 2-year options (up to 7 years), and the work is set aside by region for 8(a), SDVOSB, HUBZone or small businesses. The proposal due dates listed in the amendments (January to March 2026) appear to have already passed.
Who can bid (9)
- Hold the socioeconomic status for the region you bid: 8(a) (Regions 1, 7, 7.5, 9, 14), SDVOSB (Regions 5, 11/13), HUBZone (Region 8) or Total Small Business (Region 17), shown in your SAM registration From AMEND0006_70Z08725RRMACCIII.pdf
- For 8(a) regions, active 8(a) certification in SAM; SBA makes the final eligibility decision before award, and graduating from the program can affect option periods From AMEND0002_70Z08725RRMACCIII.pdf
- Be a small business under NAICS 236220 (size standard $45M)
Show all 9Show fewer
- Current SAM registration with the socioeconomic category, a copy submitted with the proposal From AMEND0002_70Z08725RRMACCIII.pdf
- Show minimum bonding capacity, with a letter from your surety (corporate surety listed in Treasury Circular 570); thresholds are in Section H.10, which was not read (it may be an attached file the AI skipped; check SAM.gov) From AMEND0002_70Z08725RRMACCIII.pdf
- Design-Build capability and at least one submitted project using Design-Build delivery From REV2 Solicitation USCG RMACC III 12-19-2025.pdf
- 3 to 5 relevant construction projects of roughly $500,000 to $20,000,000, finished within 6 years of the RFP due date, with experience from the prime contractor (affiliates and subsidiaries allowed if they have meaningful involvement) From AMEND0002_70Z08725RRMACCIII.pdf
- Joint ventures allowed on set-asides, with a notarized letter of intent and each partner registered in SAM at submission From AMEND0010_70Z08725RRMACCIII_12-4-2025.pdf
- VETS-4212 registration (Phase II) and a bid bond for the seed project From REV2 Solicitation USCG RMACC III 12-19-2025.pdf
How to submit: Email to the regional contact (for Juneau, Contracting Officer Cheryl A. Berry, cheryl.a.berry@uscg.mil, 206-815-5287). Two emails per region: email 1 with one PDF (20MB or less) and the Attachment A Excel file, email 2 with project photos only. Competing in several regions needs separate proposals sent to each region's contact., due Varies by region, 5:00 PM Eastern, per Amendment 0012: Region 1 14 Jan 2026; Region 5 07 Jan 2026; Region 7 02 Feb 2026; Region 7.5 02 Mar 2026; Region 8 07 Jan 2026; Region 9 02 Feb 2026; Region 11/13 07 Jan 2026; Region 14 14 Jan 2026; Region 17 (Juneau) 14 Jan 2026. The SAM.gov response date of Dec 31, 2026, 5:00 PM EST is stated to be a placeholder.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
From the version posted Jan 8, 2026.
- Serious: Set aside by region and status. Each region is limited to one program (8(a), SDVOSB, HUBZone or total small business), so a firm without the right certification cannot compete in that region even though the SAM field says no set-aside. From AMEND0006_70Z08725RRMACCIII.pdf
- Serious: Bonding capacity gate. A firm that cannot show the minimum bonding capacity may be dropped without further review, and a Phase II bid bond is needed for the seed project. From REV2 Solicitation USCG RMACC III 12-19-2025.pdf
- Worth checking: Notice type does not match content. SAM labels this a Sources Sought notice, but the posting carries the full RFP and 12 amendments plus old sources sought and pre-solicitation text, which makes it easy to follow the wrong rules.
Show all 8Show fewer
- Worth checking: Strict page limits and format. Anything over the page limits will not be read, and the work involves 3 to 5 project forms plus several narratives, so the proposal takes real effort. From AMEND0005_70Z08725RRMACCIII_10-27-2025.pdf
- Worth checking: Late or misrouted emails count against you. Each region has its own contact and the proposal must be received in the USCG inbox by the deadline, with the sent time ignored. From AMEND0002_70Z08725RRMACCIII.pdf
- Worth checking: Must bid on task orders or risk losing options. Awardees are expected to propose on every task order, and declining too often can lead the Government to drop them or skip their option years. From AMEND0004_70Z08725RRMACCIII.pdf
- Worth checking: Only a $5,000 minimum guarantee. Work depends on task orders being issued, and there are about ten awardees per region sharing the work, so revenue is not assured.
- Worth checking: Many amendments and conflicting text. Twelve amendments changed the RFP, Amendment 0005 replaces the whole of Section L.5.1, and older notice text gives different option terms than the RFP, so it is easy to follow outdated rules.
Read from the notice and 12 attachments. 5 of 17 not read. Show which files.
- REV2 Solicitation USCG RMACC III 12-19-2025.pdf (read)
- AMEND0012_70Z08725RRMACCIII.pdf (read)
- AMEND0011_70Z08725RRMACCIII.pdf (read)
- AMEND0010_70Z08725RRMACCIII_12-4-2025.pdf (read)
- AMEND0009_70Z08725RRMACCIII.pdf (read)
- AMEND0008_70Z08725RRMACCIII.pdf (read)
- AMEND0007_70Z08725RRMACCIII.pdf (read)
- AMEND0006_70Z08725RRMACCIII.pdf (read)
- AMEND0005_70Z08725RRMACCIII_10-27-2025.pdf (read)
- AMEND0004_70Z08725RRMACCIII.pdf (read)
- AMEND0001_70Z08725RRMACCIII.pdf (read)
- AMEND0002_70Z08725RRMACCIII.pdf (read)
- AMEND0003_70Z08725RRMACCIII_RFIs_Extend.pdf: not summarized: open it on SAM.gov
- Consolidated QA for RMACC III.pdf: not summarized: open it on SAM.gov
- REV RMACC III ATTACHMENT A.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- REV RMACC III ATTACHMENT B.docx: not summarized: open it on SAM.gov
- RMACC III ATTACHMENT C.docx: not summarized: open it on SAM.gov
Full summary
What they want
- Win a spot as one of about ten awardees per region on a regional multiple-award construction IDIQ (RMACC III)
- General construction, repair, maintenance and renovation of buildings, utilities and site work at USCG/DHS facilities
- Marine and waterfront construction, including dredging
- Demolition, historical restoration and remediation
- Design-Build (including One-Step Turnkey) and Design/Bid/Build delivery, with Design-Build capability expected
- Provide all personnel, equipment and materials for several task orders at once across the whole awarded region, including remote sites
- Submit a proposal on each task order request, or tell the Contracting Officer in writing within 5 working days why not
- Phase II finalists must price and plan a Design-Build seed project, which is the first task order
- Contract type
- Multiple-award IDIQ (RMACC III); all task orders firm fixed price; two-phase design-build selection under FAR Subpart 36.3
- Period of performance
- 3-year base period plus two 2-year option periods, potentially 7 years (the notice's older text says 'a base year and two (3)-year option periods', which differs)
- Place of performance
- Notice field lists Juneau, AK (CEU Juneau handles Region 17, Arctic District). Overall work is nationwide by region; the place is identified on each task order.
- Estimated value
- Anticipated aggregate capacity of $4 Billion across all regional contracts; $5,000 guaranteed minimum per contract; task order limits generally $2,000 to $10M (Region 17: up to $20M)
- Contract vehicle
- New multiple-award IDIQ (RMACC III) open to DHS components; not tied to an existing schedule. A re-compete of RMACC II.
- How they'll choose
- Two-phase design-build selection. Phase I picks the most highly qualified firms (no more than about fifteen per region) on non-price factors. Phase II (FAR 15.3) evaluates a regional seed project technical solution and price, and the best value offeror per region also gets the seed project as the first task order.
- Offers due
- Varies by region, 5:00 PM Eastern, per Amendment 0012: Region 1 14 Jan 2026; Region 5 07 Jan 2026; Region 7 02 Feb 2026; Region 7.5 02 Mar 2026; Region 8 07 Jan 2026; Region 9 02 Feb 2026; Region 11/13 07 Jan 2026; Region 14 14 Jan 2026; Region 17 (Juneau) 14 Jan 2026. The SAM.gov response date of Dec 31, 2026, 5:00 PM EST is stated to be a placeholder.
- How to submit
- Email to the regional contact (for Juneau, Contracting Officer Cheryl A. Berry, cheryl.a.berry@uscg.mil, 206-815-5287). Two emails per region: email 1 with one PDF (20MB or less) and the Attachment A Excel file, email 2 with project photos only. Competing in several regions needs separate proposals sent to each region's contact.
- Page limits
- Attachment B project form: up to 4 text pages per project (3 to 5 projects), plus an optional 1 photo page per project. Regional Management Capabilities: 5 pages. Organizational Technical Capabilities: 4 pages. Past performance: a narrative of no more than one page per submission. Other factor limits are in parts of Section L not provided.
What they'll judge offers on
- Phase I Factor 1: Corporate Experience
- Phase I Factor 2: Past Performance of the demonstrated projects (CPARS or Past Performance Questionnaire)
- Phase I Factor 3: Regional Management Capabilities, Organizational Technical Capabilities, and Capacity to Support Multiple Projects (including bonding)
- Phase I Factor 4: Safety (OSHA DART rates for the three previous calendar years)
- Phase II Non-price: Technical Solution Seed Project (Means & Methods, Schedule & Design Approach)
- Phase II Price: price of the regional seed project
What to include when you submit
- Title the proposal 'RMACC III Region [Region #] Phase I Proposal'
- Include the signed SF 1442, completed Section K representations and certifications (K.1 and K.2), and documentation for Factors 1 to 4 in the single PDF
- Attach a copy of current SAM registration showing the socioeconomic category (it does not count against page limits)
- Use Times New Roman 12-point font with 1 inch margins; 10-point Calibri allowed for exhibits and captions
- Submit 3 to 5 relevant projects with Attachment A (Excel) and Attachment B (do not alter the forms)
- For each project send a CPARS evaluation, or a client-completed Past Performance Questionnaire (Attachment C) if no CPARS exists
- Include a bonding surety letter showing the required capacity
- Return signed copies of the amendments, including 0011 and 0012
- For a joint venture, include a notarized letter of intent to form the venture
Current contractor
This is a re-compete of the current Regional Multiple Award Construction Contract (RMACC II). The RMACC II contract holders are not named in the text provided.
Not in the notice text
- Whether the opportunity is still open, since all listed regional due dates were in 2026 before the SAM.gov placeholder date
- Exact minimum bonding amounts (Section H.10) and bonding letter wording; the middle of the RFP was left out of the text provided
- Full text of Section L (page limits for Factors 3.c and 4, and any other submission rules) and Section M Factor 1 details
- Phase II seed project scope, price instructions and wage determination (given only to Phase I finalists)
- Contents of Attachments A, B and C, the Consolidated Q&A and Amendment 0003, which were not read
- Names of current RMACC II contractors
- Which contact address applies to each region other than Juneau (the posting only shows the Juneau contract specialist)
- Whether a bona fide office in the region is required (an answer says no, but regional offices are still evaluated)
- Whether there's a site visit: this summary doesn't say. Check the solicitation and its amendments on SAM.gov.
More to check before you reply
- The notice names requirements:
- The notice text says this is set aside for HUBZone small businesses, but SAM.gov lists no set-aside. Ask the contracting officer which one applies before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Dec 30, 2025
- Notice type
- Sources Sought
- Office
- Ceu Juneau(00087), AK
- Product/service code
- Z2AZ · Repair or Alteration of Other Administrative Facilities and Service Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
30 versions have been posted, newest first.
- Jan 8, 2026 · AmendmentDue Dec 31, 2026
- Dec 30, 2025 · Amendment 0011 (this version)Due Dec 31, 2026
- Dec 19, 2025 · AmendmentDue Dec 31, 2026 (changed)
- Dec 4, 2025 · AmendmentDue Jul 31, 2026 (changed)
- Nov 26, 2025 · AmendmentDue Mar 31, 2026
- Nov 19, 2025 · AmendmentDue Mar 31, 2026
- Nov 11, 2025 · AmendmentDue Mar 31, 2026
- Nov 11, 2025 · AmendmentDue Mar 31, 2026 (changed)
- Nov 3, 2025 · AmendmentDue Dec 31, 2025
- Nov 3, 2025 · AmendmentDue Dec 31, 2025 (changed)
- Oct 27, 2025 · AmendmentDue Dec 17, 2025
- Oct 24, 2025 · AmendmentDue Dec 17, 2025
- Oct 21, 2025 · AmendmentDue Dec 17, 2025
- Oct 17, 2025 · AmendmentDue Dec 17, 2025 (changed)
- Oct 7, 2025 · AmendmentDue Dec 4, 2025
- Oct 1, 2025 · AmendmentDue Dec 4, 2025
- Oct 1, 2025 · AmendmentDue Dec 4, 2025
- Sep 30, 2025 · AmendmentDue Dec 4, 2025
- Sep 30, 2025 · AmendmentDue Dec 4, 2025
- Sep 30, 2025 · AmendmentDue Dec 4, 2025 (changed)
- Sep 25, 2025 · AmendmentDue May 1, 2026
- Sep 8, 2025 · AmendmentDue May 1, 2026
- Aug 25, 2025 · AmendmentDue May 1, 2026
- Jul 23, 2025 · AmendmentDue May 1, 2026
- Jun 26, 2025 · AmendmentDue May 1, 2026
- Mar 5, 2025 · AmendmentDue May 1, 2026 (changed)
- Nov 13, 2024 · AmendmentDue Nov 26, 2024 (changed)
- Nov 6, 2024 · AmendmentDue Nov 19, 2024 (changed)
- Oct 10, 2024 · AmendmentDue Nov 12, 2024
- Oct 10, 2024 · Sources SoughtDue Nov 12, 2024
- Related notices
Other notices that name this solicitation, or that this one names.
- Request for Information Region 7.5: Puerto Rico & U.S. Virgin Islands for the USCG Regional Multiple Award Construction Contract (Rmacc III) · 70Z08725RRMACC003_PR_USVI_Targeted_MRPosted earlier Sep 18, 2025 · Due Oct 2, 2020
- Virtual Industry Day - USCG Regional Multiple Award Construction Contract (Rmacc III) · 70Z08725RRMACC003_INDUSTRY_DAYPosted earlier Aug 22, 2025 · Due Jul 29, 2025
- USCG REGIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT (RMACC III) Vendor Outreach Matchmaking Event (VOME) · 70Z08725RRMACC003_RMACCIII_VOMEPosted earlier Aug 22, 2025
- Attachments
Before you respond
Terms on this notice: Sources sought notice
Full notice text from SAM.gov
Similar open opportunities
- Port Everglades USCG Reconfiguration ProjectThe Army Corps of Engineers Jacksonville District is asking in a sources sought notice (market research, not a bid request) which design-build firms could take on the U.S. Coast…