Solicitation
NAWCAD (WOLF) Airborne Systems Integration (ASI ) Division Technical/Project Management Support (TPMS)
Department of Defense · Department of the Navy
Small business set-aside · MD
A newer version of this notice was posted Nov 23, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 19, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 5 of 17 attachments weren't read (Att C1 - ASI TPMS Cost Reimbursable Workbook.xlsx, Att 08 - TDL CDRL attachment COR_TPOC May 2026.xlsx and 3 more). Check the attachments on SAM.gov.
Only small businesses that already hold a Navy SeaPort Next Generation (NxG) multiple award contract (MAC) can bid, and they need a Secret facility clearance. The Navy's Naval Air Systems Command, for the Naval Air Warfare Center Aircraft Division (NAWCAD) Webster Outlying Field (WOLF) Airborne Systems Integration (ASI) Division, wants project management, data management and acquisition support in Maryland. The task order is cost-plus-fixed-fee (CPFF: the Government pays allowed costs plus a set fee) for a base year plus four option years. The response due date is December 15, 2026, 1:00 PM Eastern. Amendment 0001 changed marking and evaluation wording but kept the due date.
Who can bid (8)
- Small business under NAICS 541330 (size standard $47M), classified as small at the time of offer submission. Only small businesses can bid.
- Must already hold a current SeaPort Next Generation (NxG) multiple award contract (MAC)
- Secret Facility Clearance Level (the company's facility clearance), in place in time to meet personnel clearance needs
Show all 8Show fewer
- Contractor-provided facility within 50 ground miles of NAWCAD WOLF in St. Inigoes, MD, occupied by the base year start date, able to host Secret-level meetings From Att 01_rev01- ASI TPMS SOW.pdf
- Cybersecurity Maturity Model Certification (CMMC) Level 2 (Self) status in SPRS, with a current affirmation of compliance, before award for each system handling federal contract information or CUI From N0042127R1008 AMD_0001 Conformed.pdf
- Accounting system adequate for a cost-reimbursement order; the Government may run a pre-award survey From Att M1_rev01 - ASI TPMS FAR 16.507-2.pdf
- Named key personnel for four labor categories (program manager, acquisition analyst, project management specialist journeyman and senior), meeting the stated experience and education From Att 03- List of Authorized Key Personnel.docx
- Recent past performance (within three years of the RFO release date) similar in scope, complexity and size to this work From Att M1_rev01 - ASI TPMS FAR 16.507-2.pdf
How to submit: Electronically in the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at piee.eb.mil under RFO number N00421-27-R-1008; no mail or other systems. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
- Serious: Small businesses with a SeaPort NxG MAC only. A business without a current SeaPort NxG multiple award contract cannot bid, and it must also be small when it submits its offer.
- Serious: Secret facility clearance required. The company itself must hold a Secret facility clearance; one cannot be obtained quickly, and the security specification (DD Form 254) could not be read here.
- Serious: Contractor facility near St. Inigoes, MD. The winner must provide its own facility within 50 ground miles of NAWCAD WOLF, occupied by the base year start, with Secret-level meeting space. From Att 01_rev01- ASI TPMS SOW.pdf
Show all 10Show fewer
- Serious: CMMC Level 2 (Self) needed before award. Offers are not eligible for award without current CMMC status and an affirmation in SPRS for each system that handles federal contract information or CUI. From N0042127R1008 AMD_0001 Conformed.pdf
- Worth checking: Cost-reimbursement accounting system check. A firm with no audited accounting system faces a Government pre-award survey; failing it means the offer is dropped and the next one is evaluated. From Att M1_rev01 - ASI TPMS FAR 16.507-2.pdf
- Worth checking: Key personnel cannot be prospective hires. Proposed key personnel must be current or contingent hires with commitment letters, and they are locked in for the first 12 months. From Att M1_rev01 - ASI TPMS FAR 16.507-2.pdf
- Worth checking: Contractor-site share differs: 15% and 18%. Section A gives 15% of work at the contractor site, while the statement of work gives 18%; ask the contracting officer which governs. From Att 01_rev01- ASI TPMS SOW.pdf
- Worth checking: Labor cost floor and tripwire. Labor priced below the Government's minimum without a good reason makes the offer ineligible, and any person costing over $420K a year needs a justification. From Att M1_rev01 - ASI TPMS FAR 16.507-2.pdf
- Minor: No pre-award notice or discussions guaranteed. The Government may award without pre-award debriefings or exclusion notices, so the first offer must be the best one. From Att M1_rev01 - ASI TPMS FAR 16.507-2.pdf
- Minor: Organizational conflict of interest plan required. The offer must include a plan to comply with the Navy's conflict of interest terms; the Government lists current ASI contractors that may be conflicted. From N0042127R1008 AMD_0001 Conformed.pdf
Read from the notice and 12 attachments. 5 of 17 not read. Show which files.
- N0042127R1008 AMD_0001 Conformed.pdf (read)
- N0042127R1008 AMD_0001 SF 30.pdf (read)
- Att 01_rev01- ASI TPMS SOW.pdf (read)
- Att M1_rev01 - ASI TPMS FAR 16.507-2.pdf (read)
- Att L1_rev01 - ASI TPMS FAR 16.507-2 CPFF.pdf (read)
- Exhibit A - ASI TPMS CDRL.docx (read)
- Att 02 - N0042127R1008_DD254_Signed rev2.pdf (read)
- Att 04 - Contract Surveillance Plan.docx (read)
- Att 03- List of Authorized Key Personnel.docx (read)
- Att 06 - ASI TPMS OCI List.pdf (read)
- Att 05- COR Designation Letters.docx (read)
- Att 07 - ASI TPMS List of Approved Subcontractors.docx (read)
- Att C1 - ASI TPMS Cost Reimbursable Workbook.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Att 08 - TDL CDRL attachment COR_TPOC May 2026.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Att 09 - TDL CDRL attachment COR only May 2026.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Att C4 - ASI TPMS LCAT Capacity Labor Hours.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Att 10- NAWCAD Contractor Manpower Report.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- Technical project management support: help ASI Division projects through initiating, planning, executing, monitoring and closing (SOW paragraph 3.3.1)
- Data management support: division planning, performance reporting, data analytics, metrics and repeatable best practices (SOW paragraph 3.3.2)
- Acquisition support, including purchase request tracking and post-award service contract documentation (SOW paragraph 3.3.3)
- Support for programs such as the VH-92A Presidential Helicopter, E-6B, unmanned carrier aviation, counter-uncrewed systems, V-22 and Naval Sea Systems Command Integrated Warfare Systems
- Provide staff for most work at Government sites at St. Inigoes and Patuxent River, Maryland, plus a contractor facility within 50 ground miles of NAWCAD WOLF
- Host meetings of at least five people up to the Secret level, with phone and video teleconference, at the contractor facility
- Monthly progress and financial status report, and an organizational conflict of interest (OCI) and non-disclosure agreement status certification
- Staff four key personnel categories and keep systems compatible with Government IT up to the Secret level
- Contract type
- Cost-plus-fixed-fee (CPFF) task order under the SeaPort NxG MAC; other direct costs (travel and material) are cost reimbursement with no fee; data and contractor acquired property are not separately priced
- Period of performance
- 1 base year + 4 option years; the TEP also counts a possible six-month extension under FAR 52.217-8. Estimated 447,840 labor hours in all, with 80,160 in the base year
- Place of performance
- Section A says 85% at Government sites (19% at Naval Air Station Patuxent River, MD and 81% at NAWCAD WOLF in St. Inigoes, MD) and 15% at a contractor site within 50 drivable miles of NAWCAD WOLF. The SOW says 18% at the contractor site.
- Estimated value
- Not stated
- Contract vehicle
- Open only to holders of a current SeaPort Next Generation (NxG) multiple award contract (MAC)
- How they'll choose
- Fair opportunity under FAR 16.507-2: the Highest Technically Ranked Offer (HTRO) wins if its past performance rating is Neutral Confidence or higher and its cost is fair, reasonable, realistic and balanced. A best-value tradeoff happens only if that fails.
- Offers due
- December 15, 2026, 1:00 PM Eastern (from the version posted Nov 19, 2026; amended since)
- How to submit
- Electronically in the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) at piee.eb.mil under RFO number N00421-27-R-1008; no mail or other systems
- Page limits
- Key Personnel (Attachment T1): 5 pages for each key person. Sample Tasks (Attachment T2): 10 pages total for both responses. Past Performance Information Form (Attachment P1): 3 pages per contract reference. Cross Reference Matrix: 3 pages per reference. Other volumes: no page limit.
What they'll judge offers on
- Technical (ranks all offers against each other): Key Personnel, and Sample Tasks (no weights between the two)
- Past Performance: recency, relevancy, quality (confidence rating)
- Cost/Price: Total Evaluated Price (not rated; checked for fair, reasonable, realistic and balanced)
What to include when you submit
- Send separate volumes: Volume 1 Technical (Attachments T1 and T2, Word .docx), Volume 2 Past Performance (Attachments P1 and P2, PDF), Volume 3 Cost/Price (Attachments C1 Excel workbook, C2 narrative, C3 for subcontractors proposing other than cost reimbursable)
- Include Annex 1 (the statement of work for each past performance reference) and Annex 2 (past performance cross reference matrix)
- Mark every volume, attachment, annex and enclosure as Controlled Unclassified Information (CUI) and Source Selection Information (SSI); all offers must be unclassified
- Keep dollar values and hourly rates only in the Cost/Price volume; do not repeat information across volumes
- Name files with no more than three letters for the contractor, such as ABC_V1_AttT1.docx; no hyperlinks, ZIP files, or headshots of key personnel
- Use 12-point Times New Roman, letter-size pages, one-inch margins; pages over the limit are not evaluated
- Cover letter must certify that all electronic files were virus scanned and name the anti-virus software, version and definition file
- Propose key personnel that are not prospective hires; send a letter of commitment for each contingent hire (conditional on hiring)
- Give the CMMC unique identifier from the Supplier Performance Risk System (SPRS) for each system that handles federal contract information or CUI
- Complete the OCI representation and include an OCI plan; no page limit on the plan
- Send past performance references performed within three years of the RFO release date; older work is not considered
- Cost volume: use the Government's 447,840-hour labor estimate with a 1,920-hour work-year, apply the Government's not-to-exceed ODC amounts ($895,022.10 total) with no fee on ODCs, and keep Excel formulas unlocked
- Submit questions through the PIEE Q&A function with the document, page and paragraph referenced, and no proprietary information
Current contractor
This is a consolidation of two current ASI Division orders. Airborne Systems Integration Division Management Support (ASIMS), contract N0042122F3011, is held by Spalding Consulting, Inc. Rapid Acquisition Services (RAS), contract N0042122F3008, is held by C3 Innovations, Inc. Their subcontractors are listed in the instructions.
Not in the notice text
- Parts of the solicitation were cut off in the text read here: the middle of the statement of work, of Attachment L1 (offer instructions, Part B) and of the main solicitation file. The security specification (DD Form 254) could not be read, and five spreadsheets (cost workbook C1, LCAT hours C4, and others) are attached but not read.
- The date of the question deadline is not stated: questions are due 12:30 PM Eastern on the 14th calendar day after the RFO issue date, and the RFO issue date was not found in the text read.
- How many past performance references to send is in the instructions' Part B, which was not fully read.
- The key personnel qualifications for each of the four categories are in the statement of work and Attachment T1, only partly read.
- The base year start date is set in Section F, which was not read.
- No dollar value for the whole task order is given; only the not-to-exceed amounts for other direct costs are stated.
- Which contractor-site share applies: 15% in Section A or 18% in the statement of work.
More to check before you bid
- The notice names requirements:
- The notice mentions a security clearance. Check who needs one, and whether you must hold it by the time offers are due.
- The AI summary's reading of the notice and its attachments says a bidder needs: Secret facility clearance; CMMC certification. The summary's list is under Who can bid; check it in the notice before you bid.
- Architect-engineer services tied to buildings or construction are usually bought under the Brooks Act: the agency ranks firms on qualifications from an SF 330 first, then negotiates a price with the top firm. How A/E contracts work.
- Service contracts usually set minimum pay rates (the Service Contract Act). Price the labor with the SCA price calculator.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Solicitation
- Office
- Naval Air Systems Command, Patuxent River, MD
- Product/service code
- R799 · Support – Management: Other
- Business type
- Engineering, architecture & research (FedReady's grouping, from NAICS 541330)
- Versions
4 versions have been posted, newest first.
- Nov 23, 2026 · AmendmentDue Dec 15, 2026
- Nov 20, 2026 · AmendmentDue Dec 15, 2026
- Nov 19, 2026 · Amendment 0002 (this version)Due Dec 15, 2026
- Nov 10, 2026 · SolicitationDue Dec 15, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Architectural-Engineering Services for Hazardous, Toxic, and Radioactive Waste Services for Various Locations within the U.S. Army Corps of Engineers New England District Mission Boundaries and Other North Atlantic Division Mission BoundariesQualifications step only (solicitation W912WJ27RA001): firms send a Standard Form 330 (SF 330: the government's form for architect-engineer qualifications), due January 29, 2027;…