Solicitation
NAWCAD (WOLF) Airborne Systems Integration (ASI ) Division Technical/Project Management Support (TPMS)
Department of Defense · Department of the Navy
Small business set-aside · MD
A newer version of this notice was posted Nov 23, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 10, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 10 of 22 attachments weren't read (Att C1 - ASI TPMS Cost Reimbursable Workbook.xlsx, Att 08 - TDL CDRL attachment COR_TPOC May 2026.xlsx and 8 more). Check the attachments on SAM.gov.
Only small businesses that hold a SeaPort-NxG multiple-award contract (MAC) can bid. The Naval Air Systems Command (for NAWCAD Webster Outlying Field's Airborne Systems Integration Division) wants technical project management, data management and acquisition support in St. Inigoes and Patuxent River, Maryland (solicitation N0042127R1008). It is one cost-plus-fixed-fee task order: a base year plus four option years.
Who can bid (6)
- Limited competition: only SeaPort-NxG MAC holders can bid, not every business that meets the set-aside.
- Total small business set-aside: must hold a current SeaPort-NxG MAC and be small under NAICS 541330 ($47M size standard, Exception 1) when the offer is submitted From Att L1 - ASI TPMS FAR 16.507-2 CPFF.pdf
- Secret Facility Clearance Level, in place in time to meet the personnel clearance requirements in SOW paragraph 3.2.21
Show all 6Show fewer
- CMMC Level 2 (Self) or higher status in SPRS (Supplier Performance Risk System) before award, for each system handling Federal contract information or CUI From Solicitation - N0042127R1008.pdf
- An accounting system that can segregate, accumulate and allocate costs to this task order; a DCAA pre-award survey is done if your system has never been audited From Att M1 - ASI TPMS FAR 16.507-2.pdf
- Key Personnel who meet the minimum qualifications in SOW paragraphs 3.2.2.1 and 3.4 (for example, Senior Project Management Specialist: 10 years' experience, 5 supervisory, and a master's degree) From Att M1 - ASI TPMS FAR 16.507-2.pdf
Things to watch (9)
- Serious: Small business SeaPort-NxG MAC holders only. Only small businesses that already hold a SeaPort-NxG MAC can bid; others can only join as subcontractors. From Solicitation - N0042127R1008.pdf
- Serious: Secret facility clearance required. A business without a Secret facility clearance can't perform, and getting one takes months.
- Serious: Adequate cost accounting system required. If the accounting system can't be verified as adequate before the award date, the offer is found non-responsible and passed over. From Att M1 - ASI TPMS FAR 16.507-2.pdf
Show all 9Show fewer
- Serious: CMMC Level 2 needed before award. Without a current CMMC status in SPRS for the systems used on the work, a business isn't eligible for award. From Solicitation - N0042127R1008.pdf
- Worth checking: Two incumbents; this combines two current contracts. The work consolidates the ASIMS task order (Spalding Consulting, Inc.) and the RAS task order (C3 Innovations, Inc.), so a new bidder faces established local teams. From Att L1 - ASI TPMS FAR 16.507-2 CPFF.pdf
- Worth checking: Minimum labor cost floor. Proposed labor cost below the Government's stated minimum, without adequate justification, makes the offer ineligible for award. From Att M1 - ASI TPMS FAR 16.507-2.pdf
- Worth checking: Local facility needed. The winner must provide its own office within 50 ground transportable miles of St. Inigoes, MD, with Secret-level meeting space. From Att 01- ASI TPMS SOW.docx
- Minor: Contractor-site share differs. The solicitation gives 15% contractor-site work, while the SOW says 18% beside 85% Government site; ask the contracting officer which applies. From Att 01- ASI TPMS SOW.docx
- Minor: Labor tripwire of $420K per employee. Any fully burdened annual labor cost above $420K per employee needs a written justification or may be found unreasonable. From Att M1 - ASI TPMS FAR 16.507-2.pdf
Read from the notice and 12 attachments. 10 of 22 not read. Show which files.
- Solicitation - N0042127R1008.pdf (read)
- Att 01- ASI TPMS SOW.docx (read)
- Exhibit A - ASI TPMS CDRL.docx (read)
- Att L1 - ASI TPMS FAR 16.507-2 CPFF.pdf (read)
- Att M1 - ASI TPMS FAR 16.507-2.pdf (read)
- Att 02 - N0042127R1008_DD254_Signed rev2.pdf (read)
- Att P2 - ASI TPMS Contractor Performance Assessment Questionnaire (CPAQ).pdf (read)
- Att 04 - Contract Surveillance Plan.docx (read)
- Att C2 - ASI TPMS Cost Reimbursable Narrative.docx (read)
- Att T1 - ASI TPMS Key Personnel.docx (read)
- Att T2 - ASI TPMS Sample Tasks.docx (read)
- Att 03- List of Authorized Key Personnel.docx (read)
- Att C1 - ASI TPMS Cost Reimbursable Workbook.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Att 08 - TDL CDRL attachment COR_TPOC May 2026.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Att 06 - ASI TPMS OCI List.pdf: not summarized: open it on SAM.gov
- Att 05- COR Designation Letters.docx: not summarized: open it on SAM.gov
- Att 09 - TDL CDRL attachment COR only May 2026.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Att C3 - ASI TPMS Fixed_TandM Price Narrative.docx: not summarized: open it on SAM.gov
- Att C4 - ASI TPMS LCAT Capacity Labor Hours.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Att 07 - ASI TPMS List of Approved Subcontractors.docx: not summarized: open it on SAM.gov
- Att P1 - ASI TPMS Past Performance Information Form.pdf: not summarized: open it on SAM.gov
- Att 10- NAWCAD Contractor Manpower Report.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- Technical project management support through initiating, planning, executing, monitoring and closing projects
- Division-level data management: planning, performance reporting, data analytics, metrics and repeatable best practices
- Acquisition support for programs including VH-92A, E-6B, unmanned carrier aviation, counter-uncrewed systems and V-22
- Staff roles such as program manager, acquisition analyst, project management specialists, technical writers, administrative assistants and a training specialist
- A contractor facility within 50 ground transportable miles of NAWCAD WOLF, able to host Secret-level meetings for at least five people
- Monthly progress and financial status reports (CDRL A001) and organizational conflict of interest (OCI) status reports (CDRL A002)
- Contract type
- Cost-plus-fixed-fee (CPFF) task order: the Government pays allowable labor costs plus a set fee; travel and material are cost-reimbursable with no fee
- Period of performance
- Base year + 4 option years, with a possible 6-month extension under FAR 52.217-8 (Option to Extend Services)
- Place of performance
- 85% at Government sites (81% of that at NAWCAD Webster Outlying Field, St. Inigoes, MD; 19% at Naval Air Station Patuxent River, MD) and 15% at a contractor site within 50 drivable miles of NAWCAD WOLF
- Estimated value
- Not stated
- Contract vehicle
- SeaPort-NxG multiple-award contract (MAC); task order under FAR 16.507-2 fair opportunity procedures
- How they'll choose
- Highest Technically Ranked Offer (HTRO): award to the top-ranked technical offer if its past performance is Neutral Confidence or better and its cost is fair, realistic and balanced; a best-value tradeoff happens only if the top offer's past performance is Limited or No Confidence
- Offers due
- December 15, 2026, 1:00 PM Eastern (from the version posted Nov 10, 2026; amended since)
- Page limits
- Key Personnel: 5 pages each (Attachment T1 only); Sample Tasks: 10 pages total for both (Attachment T2 only); Past Performance Information Form: 3 pages per contract reference (Attachment P1 only); Past Performance Cross Reference Matrix: 3 pages per reference; Contractor Performance Assessment Questionnaire and cost attachments C1, C2, C3: no page limit
What they'll judge offers on
- Technical: (a) Key Personnel, (b) Sample Tasks (offers ranked against one another)
- Past Performance: recency, relevancy and quality (confidence assessment)
- Cost/Price: Total Evaluated Price, checked for fair and reasonable, realistic and balanced (not rated)
What to include when you submit
- Volume 1 Technical: Key Personnel résumés on Attachment T1 and both sample task responses on Attachment T2
- Volume 2 Past Performance: Attachment P1 per reference, Contractor Performance Assessment Questionnaire (CPAQ, Attachment P2), the SOW or PWS of each reference (Annex 1) and a cross reference matrix (Annex 2)
- Volume 3 Cost/Price: Cost Reimbursable Workbook (Attachment C1, Excel with working formulas, unlocked) and Cost Reimbursable Narrative (Attachment C2); subcontractors on other contract types use Attachment C3
- Put cost information (dollar values, hourly rates) only in the Cost/Price volume (Volume 3 in Table 1; one paragraph calls it Volume 2); don't repeat information across volumes
- Name each file with no more than three letters for your company, e.g. ABC_V1_AttT1.docx
- Letter-size pages, single-spaced, one-inch margins, 12-point Times New Roman; no hyperlinks, video, ZIP files or photos of Key Personnel
- Each volume needs a cover page with your CAGE code, point of contact, SeaPort-NxG MAC contract number, the RFO number and a table of contents
- Propose labor categories and hours by location as in Attachment C4, using the Government estimate of 447,840 hours and a 1,920-hour work-year
- Use the Government's not-to-exceed amounts for travel and material ($447,511.05 each over all years), with no fee on them
- Provide CMMC unique identifiers from SPRS for each system that will handle Federal contract information or controlled unclassified information
- Include an OCI plan per NAVAIR HTXT.209-9510 and an OCI disclosure and mitigation plan if you report a conflict
- Key Personnel can't be prospective hires; contingent hires need a Letter of Commitment
- Certify in the cover letter that the electronic files were virus scanned
- Offers must be unclassified; alternate offers aren't accepted
After award, you must have
- Occupancy of a contractor facility within 50 ground transportable miles of NAWCAD WOLF by the base year start date From Att 01- ASI TPMS SOW.docx:
The contractor shall have occupancy of this facility by the base year Period of Performance (PoP) start date specified in Section F.
Current contractor
This combines two current task orders: ASIMS (N0042122F3011, Spalding Consulting, Inc., with subcontractors JEMMCo Consulting, The MIL Corporation, Shadowens Services, Trusted QA and SAIC) and RAS (N0042122F3008, C3 Innovations, Inc., with subcontractor KAIROS, Inc.).
Not in the notice text
- How and where to submit offers, and the question deadline, are in the middle of Attachment L1 and the solicitation, which were too long to be read in full; check them on SAM.gov
- The cost workbook (Att C1), labor capacity hours (Att C4), CDRL templates (Att 08, Att 09), manpower report (Att 10), OCI list (Att 06), COR letters (Att 05), approved subcontractor list (Att 07), price narrative (Att C3) and past performance form (Att P1) are attached but not read
- The DD254 (Att 02) didn't open as text; check the clearance and safeguarding levels on SAM.gov
- The number of past performance references, the recency window and the minimum labor cost are in parts of Attachments L1 and M1 that weren't read
- The total contract value isn't given; the Government estimates 447,840 labor hours over all periods
- Section F start dates for the base year aren't in the readable text
More to check before you bid
- The notice names requirements:
- Limited competition: only SeaPort-NxG MAC holders can bid, not every business that meets the set-aside.
- The notice mentions a security clearance. Check who needs one, and whether you must hold it by the time offers are due.
- The AI summary's reading of the notice and its attachments says a bidder needs: Secret facility clearance; CMMC certification. The summary's list is under Who can bid; check it in the notice before you bid.
- Architect-engineer services tied to buildings or construction are usually bought under the Brooks Act: the agency ranks firms on qualifications from an SF 330 first, then negotiates a price with the top firm. How A/E contracts work.
- Service contracts usually set minimum pay rates (the Service Contract Act). Price the labor with the SCA price calculator.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 10, 2026
- Notice type
- Solicitation
- Office
- Naval Air Systems Command, Patuxent River, MD
- Product/service code
- R799 · Support – Management: Other
- Business type
- Engineering, architecture & research (FedReady's grouping, from NAICS 541330)
- Versions
4 versions have been posted, newest first.
- Nov 23, 2026 · Amendment 0003Due Dec 15, 2026
- Nov 20, 2026 · Amendment 0002Due Dec 15, 2026
- Nov 19, 2026 · Amendment 0001Due Dec 15, 2026
- Nov 10, 2026 · Solicitation (this version)Due Dec 15, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Architectural-Engineering Services for Hazardous, Toxic, and Radioactive Waste Services for Various Locations within the U.S. Army Corps of Engineers New England District Mission Boundaries and Other North Atlantic Division Mission BoundariesQualifications step only (solicitation W912WJ27RA001): firms send a Standard Form 330 (SF 330: the government's form for architect-engineer qualifications), due January 29, 2027;…