Solicitation
Modernize 6N Inpatient Restrooms (Swing for 3N)
Department of Veterans Affairs
SDVOSB set-aside · Shreveport, LA
A newer version of this notice was posted Nov 19, 2026. It moves the due date from Dec 7, 2026 to Dec 14, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Nov 6, 2026. The notice was amended Nov 19, 2026. The due date moved from Dec 7, 2026 to Dec 14, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 2 of 14 attachments weren't read (6 NORTH TOILET ICRA 7-15-26.pdf.pdf, WD LA20260031 05 18 2026.pdf). Check the attachments on SAM.gov.
Only service-disabled veteran-owned small businesses (SDVOSBs) certified with the Small Business Administration (SBA) can bid on solicitation 36C25626R0108. The VA wants ten inpatient restroom patient care units (PCUs: toilet, sink and cabinet fixtures) replaced at the Overton Brooks VA Medical Center in Shreveport, Louisiana. Work is in an occupied hospital and must finish within 180 calendar days of notice to proceed. The response due date is December 7, 2026, 2:00 PM Central, by email with a bid bond.
Who can bid (6)
- Be a service-disabled veteran-owned small business verified and certified in the SBA Veteran Small Business Certification site. Proposals from firms not certified there are not considered. From 36C25626R0108.pdf
- Joint ventures must also be verified SDVOSBs and registered in SAM at the time of response and at award, and must submit the joint venture agreement with the proposal. From 36C25626R0108.pdf
- Return the completed VAAR 852.219-75 certificate (limitations on subcontracting) with the proposal. From 36C25626R0108.pdf
Show all 6Show fewer
- Submit a bid bond with the proposal (amount not found in the text read). From 36C25626R0108.pdf
- File the annual VETS-4212 veterans workforce report; for awards over $150,000 it must be completed and accepted before award. From 36C25626R0108.pdf
- Provide a competent 30-hour OSHA certified superintendent from your own staff, fully dedicated to this project while work is on site. From 36C25626R0108.pdf
How to submit: Email: all volumes and a copy of the bid bond go to the contract specialist and contracting officer; questions go on Exhibit F by email, due December 7, 2026, 2:00 PM CST. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
- Serious: Only certified SDVOSBs can bid. This is a total SDVOSB set-aside. Firms not certified in the SBA Veteran Small Business Certification site, including joint ventures, will not be considered. From 36C25626R0108.pdf
- Serious: Limits-on-subcontracting certificate required with the proposal. A proposal without the completed VAAR 852.219-75 certificate is ineligible for evaluation and award. From 36C25626R0108.pdf
- Serious: Bid bond required with wet signatures. A copy of the bid bond goes with the emailed proposal. Signatures must be wet-signed with clear notary impressions; the bond amount was not found in the text read. From 36C25626R0108.pdf
Show all 9Show fewer
- Worth checking: Past performance limits which projects count. Projects must be in hospital or medical space, 100% complete, as prime, and valued between $500,000 and $1,000,000. A firm without such projects may be rated neutral and still lose. From 36C25626R0108.pdf
- Worth checking: Safety and surety forms affect rating. Offers without Exhibit D (safety record and EMR) and Exhibit E (surety form) are rated lower than offers that include them. From 36C25626R0108.pdf
- Worth checking: Full-time dedicated superintendent. One 30-hour OSHA certified superintendent must be on this project full time and cannot be split across other projects at the facility. From 36C25626R0108.pdf
- Worth checking: Work in an occupied hospital with after-hours work. Infection control rules apply, and noisy or smelly work may have to be done at night or on weekends, which raises labor cost. From 6N Replace Toilets - 2 - SOW - 667-27-130_7-13-26.pdf
- Minor: The site visit was Oct 30, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From 36C25626R0108.pdf
- Minor: Response due date extended by Amendment 0001. The amendment extends the response due date from November 20, 2026 to December 7, 2026, 2:00 PM CST. From 36C25626R0108 0001.pdf
Read from the notice and 12 attachments. 2 of 14 not read. Show which files.
- 36C25626R0108 0001.pdf (read)
- 36C25626R0108.pdf (read)
- 6N Replace Toilets - 2 - SOW - 667-27-130_7-13-26.pdf (read)
- Current 6N Swivet Toilet locations.pdf (read)
- 6N Replace Toilets - 9 - Example PCU Cutsheet.pdf (read)
- 667-27-130 Modernize 6N Inpatient Restrooms - Combined Specs.pdf (read)
- EXHIBIT A Past Performance Relevancy.pdf (read)
- EXHIBIT B Past and Present Performance Qestionnaire.pdf (read)
- EXHIBIT C Subcontractor Information.pdf (read)
- EXHIBIT F Request for Information.pdf (read)
- EXHIBIT D Safety Form.pdf (read)
- EXHIBIT E Surety Form.pdf (read)
- 6 NORTH TOILET ICRA 7-15-26.pdf.pdf: not summarized: open it on SAM.gov
- WD LA20260031 05 18 2026.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Remove ten existing inpatient restroom PCUs with swivette toilets, cabinets, countertops, sinks, faucets and hardware
- Install ten new VA-approved fixed-type PCUs (stainless steel cabinet with bedpan washer, toilet, countertop with 3-inch backsplash, sink) and connect them to the existing water and sewer lines
- Prep, patch and paint the wall areas where the old units were removed, matching existing paint
- Install new privacy curtain tracks and curtains near the new fixtures
- Follow infection control (ICRA) rules: containment, negative air machines, dust control and final cleaning
- Work around hospital operations, including after-hours or weekend work for noisy or smelly tasks; 14 days' notice for any utility outage
- Provide a full-time, dedicated 30-hour OSHA certified superintendent from your own staff
- Contract type
- Negotiated request for proposals (RFP) for construction, priced as one lump-sum job (line 0001, 1.00 JB)
- Period of performance
- 180 calendar days from notice to proceed; start within 10 calendar days after receiving it
- Place of performance
- Overton Brooks VA Medical Center, 510 E. Stoner Ave., Shreveport, LA 71101
- Estimated value
- Estimated magnitude of construction between $500,000.00 and $1,000,000.00 (per FAR 36.204)
- How they'll choose
- Best value tradeoff. Factors 1, 2 and 3 are equal in importance and together are about equal to Factor 4 (price). Discussions are expected, but the VA may award without them.
- Offers due
- December 7, 2026, 2:00 PM CST (from the version posted Nov 6, 2026; amended since)
- How to submit
- Email: all volumes and a copy of the bid bond go to the contract specialist and contracting officer; questions go on Exhibit F by email
What they'll judge offers on
- Factor 1, Schedule and Quality Management: (a) draft project schedule, (b) quality management (subfactor a is more important)
- Factor 2, Professional Qualifications and Specialized Experience: (a) key prime contractor staff, (b) subcontractors (subfactor a is more important)
- Factor 3, Past Performance: one to five recent, relevant projects, judged on recency, relevance and performance
- Factor 4, Price
What to include when you submit
- Send all volumes and a copy of the bid bond by email. Bid bond signatures must be wet-signed, with no white-out and clearly visible notary impressions.
- Price volume (Factor 4): signed SF 1442 and amendments, completed Schedule of Offer Items, completed Continuation of SF 1442 (divisional price distribution sheet), Exhibit D (safety and experience modification rate), Exhibit E (surety form) and a legible bid bond.
- Price volume also holds the completed VAAR 852.219-75 certificate (limits on how much work can go to firms that are not SDVOSBs) plus FAR 52.219-1, 52.209-7 (if applicable), 52.209-13 (if applicable), 52.219-28 and 52.225-9.
- Include the SBA SDVOSB certification verification showing the seal in the pricing volume. Joint ventures must submit their joint venture agreement.
- Safety (Exhibit D): show no more than three serious, one repeat or one willful OSHA violation in the past three years, or explain. Give your current experience modification rate (EMR) on the insurance carrier's letterhead, with a carrier explanation if it is above 1.0.
- Factor 1: a draft project schedule using a fictitious notice to proceed start date of February 3, 2027, covering the pre-construction conference, mobilization, milestones, punch list, demobilization and closeout within the performance period.
- Factor 1: explain your quality control techniques, how quality issues are managed and resolved, and who is responsible for quality management and what authority that person has.
- Factor 2: an organizational chart with proposed names (including subcontractors) and resumes for the site superintendent, project manager and quality control manager, each showing current and projected workload.
- Factor 2: the project manager and superintendent need at least five years managing or supervising multiple projects of similar size, scope and complexity. A commitment letter is needed for anyone not yet employed by you.
- Factor 2: complete Exhibit C for key subcontractors with a narrative on their locality, medical center experience, workload, socioeconomic status and key staff resumes. If you plan to self-perform, say so clearly.
- Factor 3: send one to five completed projects from the last five years, similar in size, complexity and scope, with one Exhibit A per project. Projects must be 100% complete, show you as prime contractor managing multiple subcontractors, and have a construction value between $500,000 and $1,000,000.
- Factor 3: relevant work means construction in a clinical, hospital or other medical use space. Send Exhibit B (past performance questionnaire) to your references to return to the VA separately; no penalty if one is not received.
- Send questions on Exhibit F by email to Andrea Payton and Kaitlyn West no later than 2:00 PM CST, 14 calendar days before the response due date.
Not in the notice text
- Several files were attached but not read in full: the wage determination (WD LA20260031), the infection control risk assessment (6 NORTH TOILET ICRA 7-15-26), and most of the combined specifications (35,256 of 712,963 characters read). Check them on SAM.gov.
- The bid bond amount and the full text of the limitations on subcontracting clause were not found in the text read.
- The price factor's evaluation details and any page limits are not stated in the text read.
- The Davis-Bacon wage determination is attached but was not read, so the wage rates are unknown.
More to check before you bid
- Not certified through VetCert yet? Apply on VetCert (SBA), or start with the SDVOSB guide. More open service-disabled veteran-owned set-asides under NAICS 236220
Notice details
Notice type, codes, versions and files
- Posted
- Nov 6, 2026
- Notice type
- Solicitation
- Office
- 256-Network Contract Office 16 (36C256), Ridgeland, MS
- Product/service code
- Y1DA · Construction of Hospitals and Infirmaries
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
6 versions have been posted, newest first.
- Nov 19, 2026 · Amendment 0004Due Dec 14, 2026 (changed)
- Nov 6, 2026 · Amendment 0003 (this version)Due Dec 7, 2026 (changed)
- Oct 19, 2026 · Amendment 0002Due Nov 20, 2026
- Oct 19, 2026 · Amendment 0001Due Nov 20, 2026 (changed)
- Oct 19, 2026 · SolicitationDue Nov 18, 2026 (changed)
- Aug 18, 2026 · PresolicitationDate Sep 2, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Open SDVOSB set-aside contracts
Terms on this notice: Solicitation, SDVOSB (service-disabled veteran-owned small business), Set-aside
Full notice text from SAM.gov
Similar open opportunities
- FY27 NRM - VISN Base Modernize Nurse Call - 539-23-101Only certified service-disabled veteran-owned small businesses (SDVOSBs) can respond to presolicitation 36C25027B0009, which is for renovating the nurse call system in the main…
- Dino Replace Swing Arm GatesOnly small businesses can send quotes on solicitation 140P1426Q0113: the National Park Service, Intermountain Region Northern Rockies office, wants 11 metal pipe swing gates…
- Rehab Kiosk Restrooms, NPS-ORCAThe National Park Service is asking small businesses to quote on rehabilitating kiosk restrooms at Oregon Caves National Monument & Preserve in Josephine County, Oregon.
- 11842 Perl Renovate 7 Public RestroomsThe National Park Service is asking firms to show interest in renovating seven public restrooms in Buildings A and F at the Pearl Harbor National Memorial visitor center on Oahu.
- Thomas P. Stafford Building (TPS) Restroom Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OKThe Federal Aviation Administration (FAA) is running a market survey (not a request for proposals) for restroom upgrades at the Thomas P. Stafford Building at the Mike Monroney…