Presolicitation
CUP Preventative Maintenance and Repair, NIST, Boulder, CO
Department of Commerce · National Institute of Standards and Technology
Response due Dec 9, 2026 · Small business set-aside · Boulder, CO
Advance notice of a coming solicitation, not a bid yet. If it asks for capability statements, sending one is free and puts you on National Institute of Standards and Technology's list before the solicitation is posted. See the contact
A newer version of this notice was posted Nov 19, 2026. See the latest version.
AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov. This summary may miss requirements: 3 of 7 attachments weren't read (01 CUP PWS 11-05-2026.xlsx, 02 PWS Attachments.zip and 1 more). Check the attachments on SAM.gov.
NIST posted draft solicitation 1333ND27R0001 for industry comment before the final solicitation is released. It covers running and maintaining the Central Utility Plant (CUP) at the NIST Boulder, Colorado campus around the clock, plus scheduled maintenance at field sites in Fort Collins, Colorado and Kekaha, Hawaii. Only small businesses can bid. The base period starts February 25, 2027, with four one-year options and up to six more months. SAM.gov's response date is December 9, 2026, 3:00 PM Mountain, and the final solicitation is expected; the draft does not say offers are due then.
Who can bid (7)
- Small business set-aside: only small businesses can bid (NAICS 811310) From 1333ND27R0001 DRAFT CUP 19NOV2026.pdf
- At least 5 years of verifiable company experience running a high-pressure steam plant and a chilled water plant (evaluated under Factor 3) From 1333ND27R0001 DRAFT CUP 19NOV2026.pdf
- Key personnel, each committing in a signed letter to work as an employee of the prime contractor From 1333ND27R0001 DRAFT CUP 19NOV2026.pdf
Show all 7Show fewer
- Describe how the prime contractor will complete 51% of the contract tasks From 1333ND27R0001 DRAFT CUP 19NOV2026.pdf
- Name your closest field location to Boulder, CO From 1333ND27R0001 DRAFT CUP 19NOV2026.pdf
- Active SAM.gov registration From 1333ND27R0001 DRAFT CUP 19NOV2026.pdf
- General liability insurance of at least $500,000 per occurrence, plus workers' compensation and employer's liability of at least $100,000 and automobile liability From 1333ND27R0001 DRAFT CUP 19NOV2026.pdf
How to submit: Email attachments to shawn.borisow@nist.gov with a courtesy copy to julie.morris@nist.gov (the draft's instructions; the final solicitation sets the final ones). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
From the version posted Nov 19, 2026.
- Serious: Small businesses only. The draft is a total small business set-aside, so a business that is not small for NAICS 811310 cannot bid. From 1333ND27R0001 DRAFT CUP 19NOV2026.pdf
- Serious: Draft only; the final solicitation sets the real terms. Everything here can change, and the final solicitation will set the offer due date, wage determination and instructions.
- Serious: Three sites, one in Hawaii, with 24/7/365 staffing in Boulder. A bidder must staff the Boulder plant around the clock and also cover maintenance in Fort Collins, Colorado and Kekaha, Hawaii.
Show all 11Show fewer
- Serious: Large central plant experience requirement. Factor 3 asks for 5 years running a steam plant of at least 100 thousand pounds per hour at 100 psi and chillers of at least 1200 tons; a smaller firm may score poorly. From 1333ND27R0001 DRAFT CUP 19NOV2026.pdf
- Worth checking: Key personnel resumes and signed commitment letters. Each key person and each main subcontractor must sign a letter of commitment, and leaving them out may lower the Factor 2 rating. From 1333ND27R0001 DRAFT CUP 19NOV2026.pdf
- Worth checking: Prime contractor must do 51% of the tasks. Teaming with subcontractors is allowed, but the offer must describe how the prime does 51% of the work. From 1333ND27R0001 DRAFT CUP 19NOV2026.pdf
- Worth checking: Hourly rates on CLIN 0004 are both ignored and evaluated. Section B says prices entered on the repair line will not be reviewed or evaluated, but Sections L and M ask for hourly rates and say they will be evaluated; ask which governs. From 1333ND27R0001 DRAFT CUP 19NOV2026.pdf
- Worth checking: Union agreement and wage determination not yet posted. The current work is covered by a union agreement and the Service Contract Labor Standards clause is listed, so labor costs depend on a wage determination the final solicitation will add. From 1333ND27R0001 DRAFT CUP 19NOV2026.pdf
- Worth checking: Government badges can take months. A PIV badge (the federal ID that allows building access without an escort) takes about three to six months, and badge applications are due within thirty days of Notice to Proceed. From 05 Boulder General Contractor Requirements Rev D.pdf
- Minor: Site visit security: full names to the contract specialist. Anyone attending the site visit must send first, middle and last names to the contacts in advance for security. From 1333ND27R0001 DRAFT CUP 19NOV2026.pdf
- Minor: Safety plan must be accepted before any site work. The Government must accept the site-specific safety plan first, and permits are needed for hot work, roof access and similar jobs. From 05 Boulder General Contractor Requirements Rev D.pdf
Read from the notice and 4 attachments. 3 of 7 not read. Show which files.
- 1333ND27R0001 DRAFT CUP 19NOV2026.pdf (read)
- 05 Boulder General Contractor Requirements Rev D.pdf (read)
- 04 Safety Plan Checklist.pdf (read)
- 06 WAGE DETERMINATION.pdf (read)
- 01 CUP PWS 11-05-2026.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- 02 PWS Attachments.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
- 03 CUP Job Plans.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- Run and maintain the CUP at NIST Boulder 24/7/365 (contract line item number (CLIN) 0001: one priced line of the order, 12 months): operate it, do preventative maintenance (PM: scheduled upkeep), supply the chemicals and answer call-backs
- Preventative and scheduled maintenance at the WWVH field site in Kekaha, HI (CLIN 0002, 12 months)
- Preventative and scheduled maintenance at the WWV/WWVB field site in Fort Collins, CO (CLIN 0003, 12 months)
- Repair and replacement of on-site electrical and mechanical systems at all three sites (CLIN 0004), paid at fixed hourly rates for laborer, HVAC mechanic, electrician and plumber, with written approval from the contracting officer first
- CLIN 0004 is awarded at $300,000.00 for each period at time of award; the draft says prices bidders enter on it will not be awarded or reviewed
- The same four lines repeat in each option year (CLINs 1001 to 4004), and in a 6-month extension (CLINs 5001 to 5004)
- Bidders supply all labor, materials, equipment and chemicals; the Government lends the listed office equipment, lifts, a forklift, cranes and fall-protection gear at the Boulder plant
- A site-specific safety plan must be accepted before site work starts, and workers need NIST badges
- Contract type
- Performance-based service contract: firm-fixed-price (FFP: one set price, whatever the work ends up costing) lines for operation and maintenance, plus one time-and-materials line (paid by hourly rates and materials) for repairs
- Period of performance
- Base period February 25, 2027 to February 24, 2028, four one-year options through February 24, 2032, and up to a 6-month extension to August 24, 2032 (about 5.5 years in all)
- Place of performance
- NIST Boulder, CO campus (Central Utility Plant, Building 42); WWV/WWVB field site, Fort Collins, CO; WWV/WWVH field site, Kekaha, HI
- Remote work
- No. From 1333ND27R0001 DRAFT CUP 19NOV2026.pdf:
…the contract requiring the contractor personnel to be located on a Government site…
- Estimated value
- Not stated
- How they'll choose
- Tradeoff (best value): the Government may pay more for a stronger offer if the price is fair and reasonable; the four non-price factors are about equal to each other, and together about equal to price
- Offers due
- December 9, 2026, 3:00 PM Mountain
- How to submit
- Email attachments to shawn.borisow@nist.gov with a courtesy copy to julie.morris@nist.gov (the draft's instructions; the final solicitation sets the final ones)
What they'll judge offers on
- Factor 1 Technical Approach: running the plant 24/7/365, keeping up with monthly PMs, factory-certified technicians, major repairs (a broken relief valve on an industrial steam boiler), site-specific Safety Plan with wildfire and emergency-shutdown plans
- Factor 2 Staffing Plan with Key Personnel: 24/7/365 staffing, named key personnel with resumes, signed Letters of Commitment, retention plan, management structure, doing 51% of the work as prime
- Factor 3 Experience: 5 years running a high-pressure steam plant and a chilled water plant, facilities PM experience, building management system (controls) experience, employee certifications
- Factor 4 Past Performance: up to five recent and relevant projects, checked through CPARS.gov (the Government's past performance database) and Past Performance Questionnaires
- Factor 5 Price: total firm-fixed price for CLINs X001 to X003 and hourly rates for CLIN X004, with option prices added in
What to include when you submit
- Send Word or PDF files; each email must be under 25 MB, so split large offers into several emails, and keep special characters out of file names
- Factor 1: narratives on running the plant 24/7/365, finishing assigned PMs by month end, factory-certified technician work, repair approach (including a broken relief valve on an industrial steam boiler)
- Factor 1: a draft site-specific Safety Plan following 04 Safety Plan Checklist.pdf, covering wildfire and power-outage response and a timely emergency shutdown of the plant that matches a Boulder site evacuation
- Factor 2: staffing narrative with names, positions and shifts for 24/7/365, and a resume for each key personnel individual
- Factor 2: a Letter of Commitment from each primary subcontractor and from each key person (confirming work as an employee of the prime), signed and dated by an authorized company representative and by the person
- Factor 2: a retention plan, management structure, how employees are managed to show an on-site presence, how you will do 51% of the tasks as prime, and your closest field location to Boulder, CO 80305
- Factor 3: at most 5 central plant examples, each giving boiler capacity in pounds of steam per hour, chiller tonnage, other services, equipment maintained and hours of operation
- Factor 3: also show experience with oilless air compressors (1500 CFM combined) and air dryers, facilities PM, and building management systems (control points, manufacturer, alarm handling)
- Factor 3: verifiable documents for the company's experience, work experience documents for all employees, and copies of each employee's certifications
- Factor 4: a maximum of five past performance submittals for recent projects (work performed within seven years of the RFP issue date) of similar scope, size and complexity
- Factor 4: use the Past Performance Questionnaire or give a reference with the same information; incomplete ones will not be considered
- Factor 5: a firm-fixed-price for each CLIN X001 to X003 and an hourly rate for CLIN X004
- Hold prices firm for at least 120 calendar days from the solicitation due date
After award, you must have
- Submit badge applications for primary staff as soon as possible after award, no later than thirty days after Notice to Proceed From 05 Boulder General Contractor Requirements Rev D.pdf:
…soon as possible after award but no later than thirty days following Notice to Proceed (NTP).
Current contractor
No incumbent is named. The wage determination placeholder says the current and active contract has a Collective Bargaining Agreement with International Union of Operating Engineers, Local One, and the Safety Plan Checklist carries contract number 1333ND21CNB190017 for the Boulder Central Utility Plant operations, maintenance and repair work.
Not in the notice text
- The Performance Work Statement (PWS) specific requirements (attachment 01, a spreadsheet), the PWS attachments (a zip file) and the CUP job plans (a zip file) are attached on SAM.gov but not read; the detailed tasks and deliverables are likely there.
- The middle of 05 Boulder General Contractor Requirements Rev D.pdf was attached but not read in full.
- What the December 9, 2026 response date is for, and when offers will be due once the final solicitation is released.
- The applicable wage determination; the file posted is a placeholder, and the final solicitation will address it.
- Whether attending the December 21, 2026 site visit and pre-proposal conference is required; the clause says missing it is not grounds for a protest.
- The Past Performance Questionnaire is called an attachment but is not in the attachment list.
- The Government's estimate for the whole contract and the question deadline are not given.
- Which licenses and certifications the key personnel must hold are not listed in the text read.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Presolicitation
- Office
- Dept of Commerce NIST, Gaithersburg, MD
- Product/service code
- Z1JZ · Maintenance of Miscellaneous Buildings
- Business type
- Equipment repair & maintenance (FedReady's grouping, from NAICS 811310)
- Versions
2 versions have been posted, newest first.
- Nov 19, 2026 · Amendment 0001Due Dec 9, 2026
- Nov 19, 2026 · Presolicitation (this version)Due Dec 9, 2026
- Attachments
Before you respond
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
- Limitations on subcontracting
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- US Army Hawaii Dining Facilities’ Large Equipment Preventative Maintenance & Repair ServicesThe Army's Regional Contracting Office Hawaii (Department of the Army, 0413 AQ HQ RCO-HI) wants a small business to keep large kitchen equipment running at Army dining facilities…
- Preventative Maintenance and Repairs
- JECC Generator Preventative Maintenance
- Chancery and CMR Generator Preventative Maintenance ServicesMandatory pre-quotation conference: November 13, 2026, 10:00 AM EST in Ottawa; only firms that attend may send quotes for solicitation 19CA5227Q0003.