Opportunities › Notice

Sources Sought

RFI USMMA Campus Modernization Program SATOC Seawall Project

Department of Defense · Department of the Army

Response due Dec 4, 2026 · Kings Point, NY

More open Army contracts

Save to My bidsFree account. Log in
View on SAM.gov ↗

Market research, not a bid. Replying is free and tells Department of the Army who could do this work. Send a short reply to the contracting contact; no price is needed. See the contact

Contracting contact

Mohenda Surage
mohenda.r.surage@usace.army.mil917-790-8088

Key facts

Response due
Due in 9 daysDec 4, 2026, 4:00 AM ESTAdd deadline to calendar
Place of performance
Kings Point, NY
Solicitation number
W912DS27S0006
NAICS
237990 · Other Heavy and Civil Engineering Construction

Email me about this notice. We'll email you if it's amended or awarded, and send two reminders: one a week before responses are due and one two days before.

No account needed. We'll send a link to confirm, and every email has a one-click stop. Want matches for your business too? Create a free account.

AI summary Beta

Written by AI from the notice text. Check dates on SAM.gov.

The U.S. Army Corps of Engineers New York District asks for information, not offers, in request for information (RFI) W912DS27S0006. It plans a design-build single award task order contract (SATOC, one contract with task orders issued under it) to replace or restore a 2,800-foot seawall at the U.S. Merchant Marine Academy, Kings Point, NY. The response due date is December 4, 2026, 4:00 AM Eastern. The estimated capacity is $70,000,000, and a request for proposals is planned for Spring of 2027.

How to submit: Email only to Contract Specialist Mohenda Surage (mohenda.r.surage@usace.army.mil) and Project Manager Richard Gussenhoven (Richard.Gussenhoven@usace.army.mil). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.

Things to watch (5)

From the version posted Nov 12, 2026.

SeriousWorth checkingMinor

  • Worth checking: Response file name shows a different RFI number. The notice number is W912DS27S0006, but the required file name uses W912DS-27-S-0008; ask the contracting office which to use.
  • Worth checking: Five pages for 17 detailed questions. The questions cover design, marine borings, permits, modeling and risks, so a tight page limit needs careful planning.
  • Worth checking: Large design-build coastal project. The SATOC is $70,000,000 and the notice asks about teams that can design and build coastal work, so a small firm may need a joint venture or teammates.
Show all 5Show fewer
  • Minor: Work is inside an access-controlled campus. Access controls and occupied buildings nearby limit how and when crews work.
  • Minor: Information request only. This RFI is not a solicitation and does not commit the Government to award; the request for proposals is planned for later.

Read from the notice text only.

Full summary

What they want

  • Replace or restore about 2,800 feet of seawall in nine segments at the U.S. Merchant Marine Academy
  • Take the Government's 35% design to 65% and 100% issued-for-construction design across civil, structural, coastal and geotechnical work
  • Complete all required permitting documents
  • Rebuild the seawall and restore the waterfront, including slope stabilization at the southernmost segment
  • Work inside an access-controlled campus where nearby buildings stay occupied
  • Answer 17 questions on approach, experience, permits, risks and self-performance
Contract type
Planned design-build single award task order contract (SATOC), indefinite-delivery, indefinite-quantity
Period of performance
Anticipated five-year ordering period; the notice says construction is to begin early in 2028
Place of performance
Kings Point, NY (United States Merchant Marine Academy)
Estimated value
SATOC capacity $70,000,000; task orders expected between $10,000,000 and $25,000,000
Offers due
December 4, 2026, 4:00 AM Eastern
How to submit
Email only to Contract Specialist Mohenda Surage (mohenda.r.surage@usace.army.mil) and Project Manager Richard Gussenhoven (Richard.Gussenhoven@usace.army.mil)
Page limits
Response: 5 pages

What to include when you submit

  • Send in Adobe PDF format
  • Name the file [Company Name]_Response_RFI_W912DS-27-S-0008.pdf as the notice gives it (see the file name flag)
  • Answer the 17 numbered questions on your approach, experience, permits, risks and what you would self-perform
  • Give company name, address, point of contact, phone and email
  • List the geographic areas you can serve
  • State your business size and any HUBZone, service-disabled veteran-owned, or 8(a) status
  • Add any comments or recommendations
  • Mark proprietary information clearly

Not in the notice text

  • The USMMA Seawall Site Map attachment was not in the notice text; check it on SAM.gov
  • Whether there is a site visit, and whether it would be required, is not stated
  • Which wage rule applies (such as a Davis-Bacon wage determination) is not stated
  • Bonding requirements are not stated
  • The set-aside for the future request for proposals is not stated; SAM.gov does not state one
  • The notice asks for a response by the date on its first page; SAM.gov gives that date as December 4, 2026

With a free account

  • An AI fit check of this notice against your business
  • Questions about this notice and its files, answered by AI
  • Who won work like this before, and what it paid
Save to My bids

Free account: 1 AI question or fit check a month. Pro: 15.

Notice details

Notice type, codes, versions and files
Posted
Nov 12, 2026
Notice type
Sources Sought
Office
W2SD ENDIST New York, NY
Product/service code
Y1PZ · Construction of Other Non-Building Facilities
Business type
Construction & renovation (FedReady's grouping, from NAICS 237990)
Versions

2 versions have been posted, newest first.

  • Nov 12, 2026 · Amendment 0001 (this version)Due Dec 4, 2026
  • Nov 12, 2026 · Sources SoughtDue Dec 4, 2026
Attachments

Checking SAM.gov for this notice's files…

See attachments on SAM.gov

Before you respond

  • How to answer a sources sought notice

Terms on this notice: Sources sought notice

21 more open construction & renovation contracts in New York

See them in the search

Get matched free or get new ones by email each week.

Full notice text from SAM.gov
THIS IS A REQUEST FOR INFORMATION ANNOUNCEMENT ONLY This announcement is issued solely for market research purposes in accordance with Revolutionary FAR Overhaul (RFO) Part 10, Market Research. The U.S. Army Corps of Engineers (USACE), New York District, is seeking information regarding the interest, capability, and qualifications of firms that may be capable of performing the requirement described below. This RFI is for planning and informational purposes only. It does not constitute a solicitation, Request for Proposals (RFP), Invitation for Bids (IFB), or commitment by the Government to issue a solicitation or award a contract. Responses to this RFI are not offers and cannot be accepted by the Government to form a binding contract. The Government will not pay for, reimburse, or otherwise compensate respondents for costs associated with preparing or submitting information in response to this RFI. The Government does not intend to rank submissions or provide individual responses to interested firms. Information submitted and clearly marked as “Proprietary” will be handled accordingly. The U.S. Army Corps of Engineers, New York District is issuing this Request for Information (RFI) for an Indefinite Delivery/Indefinite Quantity, Single Award Task Order Contract (SATOC) to determine interest, capabilities, and qualifications to for Design-Build contractors. The NAICS codes for this procurement is 237990, Size Standard is $45 Million. The Request for Proposals is planned to be issued in the Spring of 2027 with construction to begin early in 2028. The estimated SATOC capacity is $70,000,000 with the anticipated Task Order magnitude between $10,000,000 and $25,000,000. Work under this contract is expected to begin in winter of 2028. The SATOC will be for contractor to replace/restore 2,800-foot seawall at the United States Merchant Marine Academy, Kings Point, NY. The project will be constructed within the access-controlled installation along the waterfront of the United States Merchant Marine Academy. Adjacent facilities will remain occupied during construction with minimal disruption to operations requiring precise construction planning. Work for this project is described below: 1. Project Purpose and Program Context USACE and USMMA have undertaken an agreement to modernize the campus in its entirety providing upgraded Barracks, Academic Buildings, Training Buildings, Athletic Facilities and Waterfront Spaces. The Seawall will serve to protect critical land side facilities essential to the education and training of Midshipmen from storm, wave action, and tidal erosion. ________________________________________ 2. Existing Conditions The existing seawall along the United States Merchant Marine Academy (USMMA) campus shoreline extends approximately 2,800 linear feet and is aligned generally north–south along the western waterfront. The seawall exhibits significant variability in height, construction type and functional purpose along with its length. At the northern end (north of Hague Basin), the shoreline protection system transitions through several construction types in sequence: beginning with a timber (wooden) bulkhead, followed by a stone and mortar wall, then reverting to a timber bulkhead and transitioning to a steel sheet pile bulkhead with a concrete cap. (See Attachment - USMMA Seawall Site Map) Within the Hague Basin, the shoreline structures consist primarily of steel sheet pile bulkheads and stone façade walls. Presume the stone façade walls incorporate a concrete core based on visual assessment. South of Hague Basin, the shoreline is predominantly stabilized by a concrete seawall with riprap protection, which further transitions to cast-in-place (poured) concrete only toward the southern extent. The southernmost seawall segment, segment 9, includes stabilizing the adjacent slope to address its instability, mitigate further erosion, and support a future 12 ft. wide roadway/walkway to connect existing roads on campus. ________________________________________ 3. Design and Construction Scope This project will rehabilitate/restore 2,800-feet of seawall at the United States Merchant Marine Academy. The scope includes progressing the government provided 35% design consisting of nine segments to 100% Design, completing all required permitting documents, reconstructing the seawall, and restoring the waterfront. The contractor will review, validate, and advance the government-furnished 35% Design RFP package to 65% and 100% Issued for Construction (IFC) submittals across civil, structural, coastal, and geotechnical disciplines. Following design finalization for a segment construction will commence to remove and/or restore the degraded segment of seawall. The contractor will be required to complete the work in accordance with all required permits, certifications and licenses required by Federal, State, and local law for the execution of this work. ________________________________________ 4. Design Standards and Performance Requirements All work will meet the USMMA Campus Design Guide and Engineering Design Standards which contain DOT standards including the International Building Code (IBC), GSA standards, and DoD Unified Facilities Criteria (UFC). ________________________________________ 5. Acquisition Strategy and Contracting Approach The Government intends to establish a Design-Build (D-B) Single Award Task Order Contract (SATOC) Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract with a total contract capacity of $70,000,000 over an anticipated five-year ordering period. INFORMATION REQUESTED FROM RESPONDENTS Areas of particular interest to the government are responses to the following questions: 1) Is your firm interested in competing for this project? If so, do you anticipate proposing as an integrated prime contractor/Designer of Record (DOR) team, a joint venture (JV), or a prime construction contractor with a subcontracted design firm? 2) Based on the anticipated scope (steel sheet pile, bulkhead replacement, concrete seawall replacement, splash pads, and drainage system replacement), what percentage of the construction work do you anticipate self-performing with your own labor and equipment versus subcontracting? 3) Describe your teams experience over the past 5–10 years designing and constructing coastal infrastructure or shoreline stabilization projects of similar scale (exceeding 2,000 linear feet) or projects involving multiple, distinct structural wall types within a single contract. 4) What is the largest existing bulkhead or seawall replacement contract (by total dollar value and approximate linear footage) that your firm has completed as the prime contractor and/or Designer of Record? (Please specify whether each project was executed as Design-Build or Design-Bid-Build). 5) In a Design-Build delivery model, how would your team approach executing in-water geotechnical borings in tidal Long Island Sound conditions? Do you possess the in-house marine equipment and personnel to perform this subsurface investigation, or would you subcontract it to a specialized marine geotechnical firm? 6) Given that the 2,800-foot seawall is divided into 9 distinct segments with varying construction types (e.g., sheet pile, gravity wall, revetment), what specific technical challenges or efficiencies do you foresee in transitioning between these different wall typologies? 7) Describe your experience obtaining and/or working in compliance with Clean Water Act Section 401 Water Quality Certifications through the New York State Department of Environmental Conservation (NYSDEC) and Section 404 permits through USACE Regulatory, including managing design and construction schedules around Long Island Sound tidal and seasonal in-water work windows. What other permits would you anticipate on this project? 8) To minimize shoreline exposure, tidal vulnerability, and site disruption, would you recommend designing and constructing the 9 segments sequentially, concurrently in clusters, or prioritized by existing structural degradation? Based on your recommended approach, what is your estimated overall duration (broken down by design/permitting vs. construction)? 9) Considering the varying geometry and coastal exposure of the 9 segments along Long Island Sound, do you anticipate utilizing land-based equipment, marine-based barges/vessels, or a hybrid approach for demolition, material delivery, and staging? What specific site access, staging, or upland constraints should the Government clarify or address in the Design-Build Request for Proposal (RFP)? 10) Describe your team’s in-house or sub-consultant capabilities to perform advanced coastal engineering and numerical modeling, including nearshore wave transformation, wave overtopping, toe scour, and sea-level change lifecycle analysis. Which specific modeling tools or field measurements (e.g., spectral wave models such as SWAN/STWAVE, Boussinesq models, or Acoustic Doppler Current Profiler [ADCP] current measurements) do you anticipate needing to support final design? 11) Describe your team’s experience managing complex marine geotechnical risks along Long Island Sound or similar coastal environments, specifically regarding Soil-Structure Interaction (SSI) modeling, lateral earth/hydrostatic loading, and global slope stability analysis in soft, saturated marine sediments or variable glacial till strata. 12) Based on your experience with coastal Design-Build solicitations, what specific baseline coastal, hydrographic, and geotechnical data (e.g., historical storm surge/water-level statistics, offshore wave hindcast data, recent bathymetric/topographic surveys, or preliminary boring logs) do you expect the Government to provide in the 35% RFP package so that your team can accurately price and propose on the project? 13) Assuming the Government provides regional water-level statistics and baseline offshore wave data in the 35% RFP, what site-specific numerical modeling (e.g., nearshore wave transformation, EurOtop wave overtopping, localized toe-scour analysis, or USACE Sea Level Change projections) would your team anticipate executing post-award to finalize the design across the 2,800-foot alignment? 14) Given the variable subsurface stratigraphy of Long Island Sound, what supplemental field investigations (e.g., Standard Penetration Test [SPT] borings, Cone Penetration Testing [CPT], laboratory testing) and geotechnical modeling (e.g., PLAXIS 2D/3D, SEEP/W seepage and piping analysis, or global slope stability) do you anticipate performing post-award to advance the 35% concept into a sealed, Issued-for-Construction (IFC) foundation and wall design? 15) How will regional regulatory moratoriums and site usage restrictions along Long Island Sound (e.g., Essential Fish Habitat [EFH] and winter flounder/anadromous fish spawning windows, protected avian nesting seasons, and peak summer recreational beach/waterway usage) impact your proposed mobilization, staging, and construction sequencing across the 9 segments? 16) Are there specific materials anticipated for this seawall replacement (e.g., marine-grade steel sheet piling compliant with federal domestic sourcing requirements, specialized corrosion coatings, custom precast concrete units, or specific armor stone gradations) that are currently experiencing extended fabrication lead times or significant price volatility? 17) What do you view as the top three technical, schedule, or commercial risks for this 9-segment Design-Build project (e.g., unforeseen subsurface boulders/obstructions in glacial till, coastal storm events during open excavation, or permitting/utility delays), and how can the Government best structure the RFP or allocate risk to mitigate them? INFORMATION REQUESTED FROM RESPONDENTS All interested, capable, qualified, and responsive firms are encouraged to reply to this announcement. The Government is requesting that interested firms furnish the following information in addition to responses to the questions above: Corporate Information 1. Company name, address, point of contact, telephone number, and e-mail address. 2. Geographical areas in which you are capable of servicing. 3. Business-size and socioeconomic status, as applicable: a. Small or large business firm as defined by SBA, or b. Certified HUBZone firm, or c. Service-Disabled Veteran Owned Small Business (SDVOSB) firm, or d. SBA certified 8(a) firms. 4. Contractor’s comments or recommendations. Please provide, if any. SUBMISSION INSTRUCTIONS Due Date: All responses must be submitted no later than the date and time specified on the first page of this RFI. Limit response to 5 pages. Format: Submissions should be in Adobe PDF format. The file name should be: [Company Name]_Response_RFI_W912DS-27-S-0008.pdf. Submission: Responses shall be submitted via email only to the following points of contact: Contract Specialist: Mohenda Surage at mohenda.r.surage@usace.army.mil Project Manager: Richard Gussenhoven at Richard.Gussenhoven@usace.army.mil

Get new contracts like this one by email. Our free weekly contracts email, no account needed: we check SAM.gov every Monday morning (Eastern) and email you only when something new is posted, up to 10 still-open notices with due dates and set-asides.

We'll send a link to confirm first, and every email has a one-click stop.

FedReady

Opportunity data comes from SAM.gov's public Contract Opportunities extract. FedReady is an independent company and is not affiliated with SAM.gov or any government agency. Always confirm details on SAM.gov before responding.

The weekly contracts email sends new federal contracts in your line of work, free, no account needed. Get the weekly contracts email

Follow FedReady: TikTok (opens in a new tab) · YouTube (opens in a new tab) · LinkedIn (opens in a new tab) · X (opens in a new tab) · Instagram (opens in a new tab) · Facebook (opens in a new tab)

FedReady

SearchGuidesHow it worksPricingAboutHow we check our dataCompare with other toolsHelp & contactAccessibilityTermsPrivacySecurityhello@fedready.us

Free tools

NAICS code lookupCAGE code and UEI lookupSBA size standard checkerHUBZone map checkerSAM registration status checkSCA bid price calculatorAll free tools

Browse contracts

Contracts by industry and stateContracts by agencyRecent contract awardsExpiring contractsProcurement forecastsSubcontracting plansSBIR and STTRHUBZones by stateContractorsNAICS codesMonthly set-aside reportsSBA certificationsGlossaryVideos

© 2026 ZohaDigital LLC, the company behind FedReady, in Charlotte, North Carolina. All rights reserved.