Solicitation
Hydrosphere, Biosphere, & Geophysics (HBG) Support Services II - Final Request for Proposal (FRFP)
National Aeronautics and Space Administration
Notice says small business set-aside · Greenbelt, MD
AI summary Beta
This summary may miss requirements: 24 of 36 attachments weren't read (Exhibits GPM 2-10_HBG II_ All IDIQ by CY.xlsx, Exhibits GPM 1A-1C_HGB II_All IDIQ with GPM-Specified ODCs by CY.xlsx and 22 more). Check the attachments on SAM.gov.
NASA Goddard Space Flight Center wants science research support for its Earth Sciences Division laboratories in Greenbelt, Maryland, under a five-year ordering period. The notice says it is a small business set-aside, but SAM.gov does not list a set-aside. The response due date is December 15, 2026, 2:00 PM Eastern, and the stated ordering limits are $5,000,000 minimum and $419.2M maximum.
Who can bid (4)
- Small business set-aside: the notice text says only small businesses compete. The size standard is 1,000 employees for NAICS 541715. SAM.gov does not list a set-aside.
- Accounting system found adequate by the cognizant administrative office before award From Amendment 3 HBG II cont..pdf
- Commercial and Government Entity (CAGE) code that matches the corporate address in the proposal From HBG II Hybrid FRFP Cover Letter_Rev 1.pdf
Show all 4Show fewer
- Recent and relevant past performance: prime reference at or above $8M average annual cost or fee; significant subcontractor references at or above $1M From 80GSFC27R0015_HBG II_AMENDMENT 2_HGB II.pdf
How to submit: NASA's Enterprise File Sharing and Sync Box (EFSS Box), a secure file-sharing site. Email the contracting officer, with a copy to the contracting specialist, about each upload.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (6)
From the version posted Nov 20, 2026.
- Serious: Set-aside differs between SAM.gov and the notice text. SAM.gov shows no set-aside, but the notice and cover letter say small business set-aside. Confirm with the contracting officer before relying on either.
- Serious: Very large past performance bar. Prime references must show about $8M average annual cost or fee. Most small firms need a teaming partner or a large past contract to qualify.
- Serious: Adequate accounting system needed before award. A cost-type contract needs an accounting system already approved by the cognizant office. Firms without one may not be considered. From Amendment 3 HBG II cont..pdf
Show all 6Show fewer
- Worth checking: Heavy cost proposal. Offerors must fill in many Excel cost exhibits with working formulas and show rate support. Subcontractors have their own exhibits. From HBG II Hybrid FRFP Cover Letter_Rev 1.pdf
- Worth checking: Advance notice and test upload expected. Tell the contracting officer 48 hours ahead and send a test file at least 5 days before the response due date. From Amendment 1_HBG II_Solicitation 80GSFC27R0015.pdf
- Minor: Rated order under the Defense Priorities and Allocations System. The contract is a rated order, which can bring priority-performance duties. From HBG II Hybrid FRFP_Solicitation_80GSFC27R0015_Rev 1.pdf
Read from the notice and 12 attachments. 24 of 36 not read. Show which files.
- Amendment 1_HBG II_Solicitation 80GSFC27R0015.pdf (read)
- HBG II Hybrid FRFP_Solicitation_80GSFC27R0015_Rev 1.pdf (read)
- HBG II_Hybrid FRFP Solicitation_80GSFC27R0015_10-20.pdf (read)
- 80GSFC27R0015_HBG II_AMENDMENT 2_HGB II.pdf (read)
- Amendment 3 HBG II cont..pdf (read)
- HBG II Hybrid FRFP Cover Letter_Rev 1.pdf (read)
- HBG II Hybrid FRFP Cover Letter.pdf (read)
- Attachment A - HBG2_SOW_v3.2.pdf (read)
- Enclosure 1 - Contract Historical Data.pdf (read)
- Enclosure 2 - GPM Specified Non-Mgmt DL-PDs.pdf (read)
- Enclosure 3 - QASP Cost-Type Contract.pdf (read)
- Enclosure 4 - Sample SH Plan.pdf (read)
- Exhibits GPM 2-10_HBG II_ All IDIQ by CY.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Exhibits GPM 1A-1C_HGB II_All IDIQ with GPM-Specified ODCs by CY.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Exhibits GPM 1A-1C .xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Exhibits GPM 2-10.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attachment B - Matrix. Rev. 1.doc: not read (the AI doesn't read this file type yet): open it on SAM.gov
- 80GSFC27R0015_HBG II_Attachment B - Matrix. Rev. 1.pdf: not summarized: open it on SAM.gov
- Exhibit 11 - PastPerfQues._Rev. 1.pdf: not summarized: open it on SAM.gov
- Attachment B - Matrix.pdf: not summarized: open it on SAM.gov
- Attachment D - Safety and Health Plan.pdf: not summarized: open it on SAM.gov
- Attachment E - Security IT DRD.pdf: not summarized: open it on SAM.gov
- Attachment E.1-Attachment NASA C-SCRM Plan.pdf: not summarized: open it on SAM.gov
- Attachment F - Requirements Statements List..pdf: not summarized: open it on SAM.gov
- Attachment G - Contract Historical Data.pdf: not summarized: open it on SAM.gov
- Attachment H - Govt Property List.pdf: not summarized: open it on SAM.gov
- Attachment I - IAGP LIST.pdf: not summarized: open it on SAM.gov
- Attachment J.1 - OCI.pdf: not summarized: open it on SAM.gov
- Attachment J.2 - OCI-Plan (DRD)..pdf: not summarized: open it on SAM.gov
- Attachment K - CPIC DRD.pdf: not summarized: open it on SAM.gov
- Attachment K.1 - Attachment CPIC DRD Template.pdf: not summarized: open it on SAM.gov
- Attachment L - CITAR.pdf: not summarized: open it on SAM.gov
- Attachment M - CAIRIA DRD.pdf: not summarized: open it on SAM.gov
- Exhibit 11 - PastPerfQues_.pdf: not summarized: open it on SAM.gov
- Attachment C - Financial MGMT Report.pdf: not summarized: open it on SAM.gov
- Attachment L.1 - CITAR Report Template.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- Science research support across the Cryospheric Sciences, Ocean Ecology, Hydrological Sciences, Biospheric Sciences, and Geodesy and Geophysics Laboratories
- Support for science, research and computing work in the Terrestrial Information Systems Laboratory
- Data product development and validation, instrument development, and numerical modeling
- Education, outreach and media work such as project web sites, visualizations and public events
- Work done on site at NASA Goddard and at the contractor's own facilities, as each task order says
- A 30-day phase-in under a separate firm-fixed-price order, expected to begin about May 2027
- Contract type
- Hybrid indefinite-delivery/indefinite-quantity (IDIQ: orders placed as needed) contract with cost-plus-fixed-fee (CPFF: the Government pays allowed costs plus a set fee) and firm-fixed-price (FFP: one set price) task orders
- Period of performance
- Five-year ordering period from the contract effective date. Anticipated award April 2027; 30-day phase-in to begin May 2027; June 2027 contract effective date.
- Place of performance
- Greenbelt, MD, USA (SAM.gov). On site at NASA GSFC, offsite at the contractor's facilities, and locations named on individual task orders.
- Estimated value
- Ordering limits: minimum $5,000,000 and maximum $419.2M over the life of the contract (not a Government estimate of expected spending).
- Offers due
- December 15, 2026, 2:00 PM Eastern
- How to submit
- NASA's Enterprise File Sharing and Sync Box (EFSS Box), a secure file-sharing site. Email the contracting officer, with a copy to the contracting specialist, about each upload.
- Page limits
- Past Performance Volume: 20 pages (reduced from 30 by Amendment 3). Other volume page limits are in Section L pages that were not in the text read.
What they'll judge offers on
- Mission Suitability (the Program Manager criterion was removed by Amendment 3)
- Past Performance: recent and relevant contracts, rated by level of confidence
- Cost: price analysis and cost realism (probable cost), including the fixed-price phase-in price and the status of the accounting system
What to include when you submit
- Tell the contracting officer, Cassandra K. Moore, at least 48 hours before the intended submission date that you plan to submit, and copy Michelle R. Padfield.
- Offerors new to EFSS Box should send a test file to the contracting officer at least 5 days before the response due date.
- Send separate files for each volume, such as the Mission Suitability, Past Performance and Cost-Price volumes. Number each file and put the offeror name and solicitation number in the file name.
- Files must not be password protected or locked and must not contain hidden formulas or links to data not included.
- The Cost Volume must include the completed cost exhibits in Excel format with working formulas.
- Significant subcontractors may send their own cost data separately, no later than the response due date and time.
- Offer a firm-fixed price for the 30-day phase-in using Exhibits 8 and 8A.
- Past Performance: references must be recent (ongoing or completed less than 5 years before the RFP) and show average annual cost or fee of at least $8M for the prime and $1M for each significant subcontractor.
- Ask your past performance references to send their questionnaires (Exhibit 11) directly to the contracting officer before the response due date.
- Send questions in writing to the contracting officer within 14 calendar days after the Final RFP release.
- Acknowledge each amendment (0001, 0002 and 0003) with your offer.
After award, you must have
- Organizational conflict of interest (OCI) avoidance plan due 30 days after the contract effective date From Amendment 3 HBG II cont..pdf:
TO: 30 Days after Contract Effective Date.
Current contractor
No incumbent is named. The documents refer to "the incumbent workforce" and incumbent labor rates, with historical data in Enclosure 1 and Attachment G.
Not in the notice text
- Much of Sections L and M (full instructions, page limits for the other volumes, factor weights and the best-value method) was cut from the text read here. Check the full solicitation on SAM.gov.
- Attached but not read: Attachment B (rates matrix), the cost exhibit spreadsheets, Exhibit 11 (past performance questionnaire), Attachments C through M, and Enclosure 1 historical data (only its cover page was readable).
- The Statement of Work, the Government Pricing Model enclosure and the quality plan were only partly read.
- The notice does not say whether work can be done remotely.
- The question deadline is given only as 14 calendar days after the Final RFP release; no calendar date is stated.
- No security clearance requirement was seen in the text read, but an IT security attachment (Attachment E) was not read.
More to check before you bid
- The notice names requirements:
- The notice text says this is set aside for small businesses, but SAM.gov lists no set-aside. Check the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 20, 2026
- Notice type
- Solicitation
- Office
- NASA Goddard Space Flight Center, Greenbelt, MD
- Product/service code
- AJ11 · General Science and Technology R&D Services; General Science and Technology; Basic Research
- Business type
- Engineering, architecture & research (FedReady's grouping, from NAICS 541715)
- Versions
5 versions have been posted, newest first.
- Nov 20, 2026 · Amendment 0003 (this version)Due Dec 15, 2026
- Nov 20, 2026 · AmendmentDue Dec 15, 2026 (changed)
- Oct 26, 2026 · AmendmentDue Dec 4, 2026
- Oct 22, 2026 · AmendmentDue Dec 4, 2026
- Oct 21, 2026 · SolicitationDue Dec 4, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Space Power and Reactor Capabilities (SPARC) - Final Request for Proposals (RFP)NASA Glenn Research Center plans several multiple-award indefinite delivery, indefinite quantity (IDIQ: a contract that sets a ceiling and orders work later through task orders)…