Combined Synopsis/Solicitation
CRAC Units Replacement for MCE 1211 at GFAFB, ND
Department of Defense · Department of the Air Force
Small business set-aside · Grand Forks AFB, ND
AI summary Beta
This summary may miss requirements: 1 of 6 attachments weren't read (Atch1 Quote Schedule 29Oct26.xlsx). Check the attachments on SAM.gov.
Only small businesses can bid on combined synopsis/solicitation FA465927QM001, set aside 100% for small business. The Air Force's 319th Contracting Squadron at Grand Forks Air Force Base, North Dakota, wants two 8-ton computer room air conditioner (CRAC) units installed in building 542 for the Mission Control Element 1211, plus preventative and emergency maintenance. The response due date is November 30, 2026, 1:30 PM Central, by email; funds are not yet available.
Who can bid (4)
- Small businesses only: the buy is a 100% small business set-aside under NAICS 236220 with a $45.00 million size standard. From Combo FA465927QM001 CRAC Units.pdf
- Active registration in the System for Award Management (SAM) when the quote is sent. From Combo FA465927QM001 CRAC Units.pdf
- Registration in Wide Area Workflow (WAWF) for invoicing, with DUNS number, CAGE code and WAWF confirmation sent with the quote. From Combo FA465927QM001 CRAC Units.pdf
Show all 4Show fewer
- Employees must hold the licenses and certifications needed to operate equipment used in the work before they perform. From Atch2 PWS CRAC Units for MCE 1211.pdf
How to submit: Email to all the contracting points of contact: ellod.richardson@us.af.mil and jhala.neupane@us.af.mil. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
From the version posted Nov 19, 2026.
- Serious: Small business set-aside: only small businesses can bid. The size standard for NAICS 236220 is $45.00 million, and larger firms cannot receive the award. From Combo FA465927QM001 CRAC Units.pdf
- Serious: Funds are not yet available. No award can be made until funds become available, so the award timing is not set. From Combo FA465927QM001 CRAC Units.pdf
- Serious: Date passed (Oct 29, 2026): Quote schedule spreadsheet was not read. The pricing lines, quantities and units of issue are in Atch1 Quote Schedule 29Oct26.xlsx, attached but not read here. Check it on SAM.gov before pricing. From Combo FA465927QM001 CRAC Units.pdf
Show all 9Show fewer
- Worth checking: Requests were due Nov 3, 2026. Check the amendments for what the agency sent or answered. From Combo FA465927QM001 CRAC Units.pdf
- Worth checking: Both service and construction wage rules apply. The solicitation attaches a Service Contract Act wage determination (2015-4973, Revision 33) and a Davis-Bacon Act wage determination (ND20260014), and says each applies depending on the nature of the job. From Combo FA465927QM001 CRAC Units.pdf
- Worth checking: 24/7 emergency repairs with 2-hour on-site response. The contractor must provide up to three 24/7 emergency repair capabilities and be on site within two hours of an authorized call, for the whole maintenance period. From Atch2 PWS CRAC Units for MCE 1211.pdf
- Worth checking: Work in a restricted area with escorts and no electronics. Contractor staff work in a restricted area under escort, must coordinate arrival 48 hours ahead, and cannot bring phones, smartwatches, tablets or laptops into secure work areas. From Atch2 PWS CRAC Units for MCE 1211.pdf
- Minor: Government buys replacement parts separately. Parts that cannot be repaired are bought through a separate Replacement Parts line after written approval, invoiced at the exact quoted amount. From Atch2 PWS CRAC Units for MCE 1211.pdf
- Minor: Mission-essential services plan after award. The contractor must keep a written plan for continuing emergency repair services during a crisis, and send a roster of essential staff within 30 days of award. From Atch2 PWS CRAC Units for MCE 1211.pdf
Read from the notice and 5 attachments. 1 of 6 not read. Show which files.
- Combo FA465927QM001 CRAC Units.pdf (read)
- Atch2 PWS CRAC Units for MCE 1211.pdf (read)
- Atch3 Provisions and Clauses.pdf (read)
- Atch4 SCA WD.pdf (read)
- Atch5 DBA WD.pdf (read)
- Atch1 Quote Schedule 29Oct26.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- Remove the existing CRAC unit, pumps and dry cooler, and legally dispose of them off base
- Supply and install two 8-ton CRAC units set up as a redundant pair, each able to run on its own with automatic failover
- Install new dry coolers, redundant pumps, piping and movable flexible ductwork
- Keep the room at 65 degrees F plus or minus 5 and 45% humidity plus or minus 5, and send monthly temperature and humidity logs
- Give the Air Force the manufacturer's manuals and train base maintenance staff on site
- Do scheduled preventative maintenance after the Government accepts the installation, and send a report within three business days of each visit
- Provide 24/7 emergency repair, arriving on site within two hours of an authorized call
- Send a quality control plan (QCP: how you check your own work) within 30 days of award
- Contract type
- Firm-fixed-price (FFP): one set price, whatever the work ends up costing. Combined synopsis/solicitation for a commercial service.
- Period of performance
- Base year to be determined (preventative maintenance runs one year, monthly, after the Government accepts the installation), plus four option years, each to be determined, and a six-month extension
- Place of performance
- B542, Grand Forks AFB, ND (building 542, per the performance work statement)
- Estimated value
- Not stated
- How they'll choose
- Lowest price among technically acceptable quotes. The technical proposal is rated Acceptable or Unacceptable; award goes to the lowest total evaluated price rated Acceptable.
- Offers due
- November 30, 2026, 1:30 PM Central (2:30 PM Eastern)
- How to submit
- Email to all the contracting points of contact: ellod.richardson@us.af.mil and jhala.neupane@us.af.mil
- Page limits
- Technical proposal: 7 pages
What they'll judge offers on
- Total Evaluated Price: sum of the estimated total price of all contract line item numbers (CLINs: priced lines of the order), checked for reasonableness
- Technical Proposal: up to 7 pages addressing the performance work statement (PWS) requirements and how the work will be done, rated Acceptable or Unacceptable
What to include when you submit
- Send the quote schedule with a unit price and total price for each CLIN, all inclusive of material, transportation, labor and delivery
- Show the total evaluated price from the quote schedule, and any discount for prompt payment
- Give the estimated material lead time, and say whether you think the installation can be done in winter months
- Send a technical proposal of up to 7 pages addressing the PWS requirements and how you will meet them
- Include company point of contact with name, address, email and telephone number
- Include your DUNS number, CAGE code, and confirmation of Wide Area Workflow (WAWF: the Government's online invoicing system) registration
- Fill in the company information block at the end of the solicitation: company name, SAM UEI, business type, points of contact, and signature
- Make the quote valid for no less than 90 days from the offers due date
- Do not add your own terms and conditions; vendor-specific terms will not be considered
After award, you must have
- Employees need base visitor passes and must pass security screening; people with unfavorable determinations must be replaced. From Atch2 PWS CRAC Units for MCE 1211.pdf:
…all employees obtain required DBIDS Card (visitor pass) from the Commercial Visitor Control Center.
Not in the notice text
- The quote schedule (Atch1 Quote Schedule 29Oct26.xlsx) is attached but not read, so line items, quantities and units of issue beyond the two CRAC units are not known.
- The notice says further changes including Q&As are forthcoming; none are included here.
- The base year start and end dates and each option period's dates are stated as to be determined.
- Whether the site visit was required is not stated.
- The Government's estimate or budget for this work is not stated.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- FA4659 319 CONS PK, Grand Forks AFB, ND
- Product/service code
- N099 · Installation of Equipment – Miscellaneous
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
3 versions have been posted, newest first.
- Nov 19, 2026 · Amendment 0002 (this version)Due Nov 30, 2026 (changed)
- Oct 29, 2026 · Amendment 0001Due Nov 24, 2026
- Oct 29, 2026 · Combined Synopsis/SolicitationDue Nov 24, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- NH100 Engine Control Unit ReplacementOnly the four holders of the Navy's M&R MACC (multiple award construction contract) named on the cover page can bid on this combined synopsis/solicitation from the Naval…