Sources Sought

ATR Loop Pressurizer Fabrication

Department of Energy

More open DOE contracts

Plan my responseSaveSave adds it to My opportunities (free account). Log in
View on SAM.gov ↗

Email me about this notice. We'll email you if it's amended or awarded, and send two reminders: one a week before responses are due and one two days before.

No account needed. We'll send a link to confirm, and every email has a one-click stop. Want matches for your business too? Create a free account.

AI summaryThis is a sources sought notice, a first step: Battelle Energy Alliance (BEA), which runs the Idaho National Laboratory for the Department of Energy, asks vendors to send an expression of interest (EOI) by November 6, 2026, 11:59 PM Mountain. Only select respondents will be invited to the later request for proposals (RFP). The work is fabricating one nuclear-grade stainless steel pressure vessel for a test reactor loop, delivered to Idaho Falls, ID. More in the summary

Market research, not a bid. Replying is free and tells Department of Energy who could do this work. Send a short reply to the contracting contact; no price is needed. See the contact

Contracting contact

Chase Egbert
chase.egbert@inl.gov

Key facts

Response due
Due in 9 daysNov 6, 2026, 11:59 PM MST · 1:59 AM Nov 7 EasternAdd deadline to calendar
Solicitation number
INL-27-001
Place of performance
ID, 83415

AI summary Beta

Written by AI from the notice text. Check dates on SAM.gov.

This is a sources sought notice, a first step: Battelle Energy Alliance (BEA), which runs the Idaho National Laboratory for the Department of Energy, asks vendors to send an expression of interest (EOI) by November 6, 2026, 11:59 PM Mountain. Only select respondents will be invited to the later request for proposals (RFP). The work is fabricating one nuclear-grade stainless steel pressure vessel for a test reactor loop, delivered to Idaho Falls, ID.

Who can bid

  • Demonstrated experience with nuclear-grade pressure vessel fabrication.
  • A quality program equivalent to ASME NQA-1 (2022 edition), a nuclear quality assurance standard.
  • ASME U stamp certification of the vessel (the ASME mark for code-built pressure vessels).

How to submit: Email to Chase.egbert@inl.gov. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.

Things to watch (4)

From the version posted Oct 26, 2026.

SeriousWorth checkingMinor

  • Serious: Two steps: this EOI, then an invitation-only RFP. Anyone can send an EOI now, but only select respondents chosen by BEA will be invited to the RFP. A business that does not respond may be shut out.
  • Serious: Nuclear-grade experience and quality program expected. The work needs nuclear-grade pressure vessel experience, a quality program equivalent to NQA-1 and the ASME U stamp. Few small shops have all three.
  • Worth checking: Drawings only go to selected vendors. Project drawings, design calculations and procedure references are not public, so you cannot fully price the work before you are selected.
Show all 4Show fewer
  • Minor: Heavy documentation load. You must acknowledge a long list of vendor data submittals, from welding records to a U-1A data report, which takes quality staff time.

Read from the notice text only.

Full summary

What they want

  • Fabricate, inspect and test one (1) ASME Section VIII, Division 2 stainless steel pressure vessel (a code for high-pressure vessels) with its leg stand, spray nozzles and lifting lugs, per INL Drawings 1050604, 1050605 and 1050606.
  • Supply all materials for the vessel and its parts.
  • Hydrostatic test (water pressure test) at room temperature, with a minimum test pressure of 3415 psig, +100/-0 psig tolerance. Load test and document the lifting lugs.
  • Develop and submit shop drawings through INL's vendor data system for BEA review and approval.
  • Clean to Class B cleanliness, with no paint inside or out, and provide the ASME U stamp certification and U-1A data report.
  • Pack the vessel for horizontal shipping on a forklift-ready pallet and container, and deliver to WestOne Logistics, 1765 North Yellowstone Highway, Idaho Falls, ID 83401.
  • Let BEA inspectors witness fabrication and testing and review hold points.
Place of performance
ID, USA (SAM.gov). The vessel is delivered to WestOne Logistics, Idaho Falls, ID.
Estimated value
Not stated
Offers due
November 6, 2026, 11:59 PM Mountain
How to submit
Email to Chase.egbert@inl.gov

What to include when you submit

  • Send an expression of interest with your company name and point of contact.
  • Describe your relevant fabrication experience, particularly nuclear or DOE-grade ASME Section VIII pressure vessel work.
  • List your applicable NAICS codes and business size classification.
  • Describe any existing DOE or federal contracting experience, if you have any.
  • Show you can meet the ASME, AISC and seismic-informed design requirements.
  • Acknowledge you can meet the vendor data submittals: shop drawings and bill of materials, material test reports, welding procedures and welder logs, inspection procedures and reports, lifting lug load test report, cleaning report, surface finish reports, hydrostatic test report, ASME U-1A Data Report, as-built drawings, and Vendor Data Schedule forms 431.13 and 431.14.
  • Mark any business-sensitive or proprietary information in your response.

Not in the notice text

  • The contract type, period of performance, delivery schedule and value are not stated.
  • The set-aside and NAICS code are not stated on SAM.gov.
  • The RFP date and how proposals will be evaluated are not stated.
  • Page limits for the expression of interest are not stated.

Eligibility and how to respond

  • No set-aside. Any business can reply: this is market research, and no bid is being taken yet.
  • To respond, send a short reply to the contracting contact near the top of this page. No price is needed.

Notice details

Posted
Oct 26, 2026
Notice type
Sources Sought
Office
Battelle Energy Alliance–doe CNTR, Idaho Falls, ID
Attachments

Checking SAM.gov for this notice's files…

See attachments on SAM.gov

Should you respond?

Usually yes, if you could do this work. The agency is asking who could do it before it writes the solicitation. A short reply (who you are, similar work you've done, how you'd approach it) costs nothing, and enough small businesses replying can get the work set aside for them.

How to answer a sources sought notice, with a free template

Create a free account

Past awards and competition

Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.

Create a free account to see who won work like this

Before you respond

  • How to answer a sources sought notice

Terms on this notice: Sources sought notice

Full notice text from SAM.gov
INTRODUCTION Battelle Energy Alliance, LLC (BEA), Management & Operating Contractor of the U.S. Department of Energy (DOE) owned Idaho National Laboratory (INL), is seeking an Expression of Interest (EOI) from qualified vendors capable of fabricating an ASME Section VIII, Division 2 pressure vessel for use as the ATR Loop Pressurizer (1A-NE Loop). The fabricated vessel will play a critical role in maintaining system pressure, degassing, and surge compensation for an Advanced Test Reactor (ATR) experiment loop. BACKGROUND INL is a U.S. Department of Energy (DOE) national laboratory dedicated to nuclear energy, national security, and clean energy innovation. The ATR experiment loops rely on a dynamic pressurizer system to maintain primary coolant pump pressure, provide a means of degassing the primary coolant, and compensate for pressure surges. BEA is requesting vendor capability statements for the fabrication of a vertically oriented, leg-mounted pressure vessel with radial side arms, built to strict nuclear, metallurgical, and structural performance standards. Project-specific INL drawings, design calculations, and procedural references will be furnished to selected vendors. The scope of work includes the following: Fabrication, inspection, and physical testing of one (1) ASME Section VIII, Division 2 stainless steel pressure vessel with associated appurtenances (vessel, mounting leg stand, spray nozzles, lifting lugs), per INL Drawings 1050604, 1050605, and 1050606 Supply of all materials associated with the vessel and appurtenances Hydrostatic testing at room temperature in accordance with ASME code (minimum test pressure 3415 psig, +100/-0 psig tolerance) Load testing and documentation of lifting lugs Shop drawing development and submission through INL's vendor data system Shipping/handling pallet and container for horizontal-orientation transport, forklift-compatible Delivery to WestOne Logistics, Idaho Falls, ID The scope of work does not include the following: Installation at the Contractor's facility Procurement and installation of clamp-on heaters Vessel insulation Design, seismic analysis, thermal analysis, stress analysis, or fatigue analysis Overpressure protection (provided by a separate direct spring relief valve) Floor mounting plate APPLICABLE CODES AND REFERENCES The fabrication and associated documentation must comply with the following (as applicable to component type): ASME Section VIII, Division 2 (2025) AISC 370 (2021) ANSI/AISC N690-18 (Nuclear Facility Steel Structures) ASCE 4-16 and ASCE 43-19 (Seismic Design) ASME NQA-1 (2022 edition) DESIGN REQUIREMENTS Vendors should have demonstrated experience with nuclear-grade pressure vessel fabrication and must meet or exceed the following design conditions: Materials & Components: Vessel and lifting lugs: Type 347 stainless steel Mounting legs: Type 316 stainless steel Vertically oriented, leg-mounted vessel with elliptical heads and four (4) radially arranged side arms Pressure & Temperature Ratings: Vessel Internal Design Pressure: 2500 psig Vessel Design Temperature: 668°F Normal Operating Pressure: 300–2208 psig; Normal Operating Temperature: 422–650°F Heater Leg Design Pressure: 2500 psig; Heater Leg Design Temperature: 800°F Vessel designed to Section VIII with seismic input per ASCE 4 and ASCE 43 (stand per AISC 370/N690) Fluid Service: High-purity, radioactive, demineralized water; pH range 5.0–11.0 Dissolved solids ?10 ppm, suspended matter ?3 ppm, chlorides ?0.5 ppm, dissolved gas ?150 cc/kg Cyclic Service: Pressurizer cycled between ambient and normal operating pressure 18 times/year over a 60-year design life (1,080 total cycles) Inspections & Engineering Approval: All pressure boundary welds (butt welds, with limited exceptions) inspected per ASME VIII/NDE requirements, including full volumetric inspection of all four side-arm weld joints Fabrication drawings and calculations submitted for formal BEA review/approval through the vendor data system PROCESS This EOI is the first step in identifying interested and qualified vendors. Responses may be used to inform the development of a formal solicitation list. Selected vendors may be invited to participate in a Request for Proposal (RFP) process for award consideration. SUBMITTAL REQUIREMENTS Interested vendors should submit an Expression of Interest that includes the following: Company name and point of contact Relevant fabrication experience, particularly nuclear or DOE-grade ASME Section VIII pressure vessel work Applicable NAICS codes and business size classification Any existing DOE or federal contracting experience (if applicable) Demonstrated capability to meet ASME, AISC, and seismic-informed design requirements Acknowledgment of the ability to meet the following vendor data submittals: Shop drawings and bill of materials Certified Material Test Reports (CMTRs) for weld filler material, spray nozzles, steel shapes/plates/piping Welding procedure specifications (WPS) and welder qualification/continuity logs NDE procedures, personnel qualifications, and inspection reports Lifting lug load test report Cleaning procedure and cleanliness report Internal/external surface finish reports Hydrostatic test procedure and report ASME U-1A Data Report As-built drawings Completed Vendor Data Schedule and transmittal forms (Form 431.13/431.14) QUALITY ASSURANCE REQUIREMENTS The subcontractor's quality program must be equivalent to ASME NQA-1 (2022 edition). Requirements include: Qualification records for welders, inspectors, and NDE technicians (including eye exams) Third-party inspection where required M&TE calibration records Certificates of Conformance (CoC) and ASME Pressure Vessel certification Submittal of all quality-related inspection and test documents FABRICATION & TESTING Materials must meet applicable ASME and ASTM specifications; Commercial Use (QL3) quality level per NQA-1 All pressure boundary joints are butt welds (limited fillet/stake weld exceptions for heater supports, trunnion plate, and spray nozzle attachment) Welds ground and polished flush prior to NDE Internal surfaces: 250 microinch Ra or better (except nozzles); heater leg exterior: 125 microinch Ra or better Cleaning to Class B cleanliness per ASME Code, both prior to final assembly and via final flush No paint on internal or external surfaces Hydrostatic testing per ASME Section VIII, Division 2 requirements BEA inspectors may witness fabrication and testing activities, withhold points specified at least 2 weeks in advance ASME "U" stamp certification of the vessel DELIVERY & PROTECTION Final vessel must be delivered to WestOne Logistics, 1765 North Yellowstone Highway, Idaho Falls, ID 83401, with: Vessel fully flushed, drained, and dried with no residual moisture prior to packaging Packed and shipped in horizontal orientation with suitable protective fixtures/fittings Clear labeling of purchase order number, gross weight, and lifting points Unit prepared for forklift handling; lifting diagram provided prior to shipment All shipping documents included in a waterproof envelope INL personnel retain rights for inspections, audits, and hold-point reviews throughout fabrication. Final acceptance occurs at the Subcontractor's facility prior to shipment and again upon arrival at WestOne Logistics. Deadline for submission: November 6, 2026 Submit to: Chase.egbert@inl.gov Only select respondents, as determined by BEA, will receive an invitation to participate in the anticipated RFP solicitation. PROPRIETARY INFORMATION Because information received in response to this EOI may be business sensitive or proprietary to the responding party, respondents must mark information in their responses accordingly.

Get new contracts like this one by email. Our free weekly contracts email, no account needed: we check SAM.gov every Monday morning (Eastern) and email you only when something new is posted, up to 10 still-open notices with due dates and set-asides.

We'll send a link to confirm first, and every email has a one-click stop.

FedReady

Opportunity data comes from SAM.gov's public Contract Opportunities extract. FedReady is an independent company and is not affiliated with SAM.gov or any government agency. Always confirm details on SAM.gov before responding.

The weekly contracts email sends new federal contracts in your line of work, free, no account needed. Get the weekly contracts email

FedReady

SearchGuidesHow it worksPricingAboutHow we check our dataCompare with other toolsHelp & contactAccessibilityTermsPrivacySecurityhello@fedready.us

Free tools

NAICS code lookupCAGE code and UEI lookupSBA size standard checkerHUBZone map checkerSAM registration status checkSCA bid price calculatorAll free tools

Research

Contracts by industryContracts by agencyRecent contract awardsExpiring contractsProcurement forecastsSubcontracting plansSBIR and STTRHUBZones by stateContractorsNAICS codesMonthly set-aside reportsSBA certificationsGlossaryVideos

© 2026 ZohaDigital LLC, the company behind FedReady, in Charlotte, North Carolina. All rights reserved.