Presolicitation
AK NPS DENA 10(64), Re-pave Riley Creek Campground Roads
Department of Transportation · Federal Highway Administration
Response due Dec 22, 2026 · No set-aside · Fairbanks, AK
Advance notice of a coming solicitation, not a bid yet. If it asks for capability statements, sending one is free and puts you on Federal Highway Administration's list before the solicitation is posted. See the contact
A newer version of this notice was posted Nov 19, 2026. See the latest version.
AI summary Beta
Summary of the version posted Sep 28, 2026. The notice was amended Nov 19, 2026. Check what else changed on SAM.gov. The notice looks incomplete: Bid due date and bid opening date (not given; solicitation not yet released). Check the attachments on SAM.gov.
The Federal Highway Administration's Western Federal Lands office plans to re-pave the roads in the Riley Creek Campground inside Denali National Park, Alaska, plus pavement repairs along the park road. This is an early heads-up (presolicitation): the bid package is not out yet and no due date is given. The government's estimated price range is $5,000,000 to $10,000,000, with a tentative completion date of Fall 2027.
Who can bid
- Open to all businesses: full and open competition, no set-aside
- All material sources and materials must be certified free of noxious weeds and invasive plants by a public agency (or an accepted commercial weed-free certification) From Prelim Letter_AK NPS DENA 10(64).pdf
Things to watch (6)
- Serious: Weed inspection of material sources this fall. Bidders must arrange their own weed inspection of gravel and material sources this fall, before the bid package is even released, or their sources may not be accepted. From Prelim Letter_AK NPS DENA 10(64).pdf
- Worth checking: Bid package not out yet, no due date. Nothing can be submitted yet; bonding, bid form, wage rates and other requirements will only be known when the Invitation for Bids is posted. From Prelim Letter_AK NPS DENA 10(64).pdf
- Worth checking: Site viewing hard, no agency tours. Snow may make viewing impossible later, and no agency staff will give show-me tours, so a bidder has to visit on its own early or bid without seeing the site. From Prelim Letter_AK NPS DENA 10(64).pdf
Show all 6Show fewer
- Worth checking: Large, remote job. A $5 to $10 million paving job inside a national park about 125 miles from Fairbanks means big equipment, crews and material hauling, which can be heavy for a small firm.
- Minor: Location listed differently in documents. SAM.gov lists Fairbanks, AK, the notice text says Denali National Park about 125 miles SW of Fairbanks, and the project description header says Municipality of Anchorage County, AK. From Project Description_AK NPS DENA 10(64).pdf
- Minor: Plans are preliminary. The plans posted so far are marked not for construction, so quantities and details may change in the final bid package. From plans-Pre ad_AK NPS DENA 10(64).pdf
Read from the notice and 3 attachments. Show which files.
- Prelim Letter_AK NPS DENA 10(64).pdf (read)
- plans-Pre ad_AK NPS DENA 10(64).pdf (read)
- Project Description_AK NPS DENA 10(64).pdf (read)
Full summary
What they want
- Reconstruct and pave the roadway in the 3 campground loops (12 ft wide, or no wider than existing)
- Build a deep patch along the park road at MP 14.8
- Reconstruct and pave the USPS parking lot, the mercantile parking lot next to the campground and the frontage road
- Earthwork and base: about 8,000 cu yd roadway excavation, 7,000 cu yd roadway aggregate, 1,000 cu yd recycled aggregate base, 31,000 sq yd geotextile
- Asphalt: about 6,000 tons of asphalt pavement, 17,500 sq yd of milling, 20 tons tack coat
- Striping and markings: about 12,000 linear ft of pavement markings plus 1 symbol
- Remove and reset 107 bollards, 4 gates, 41 sign systems and 12 trash receptacles; adjust 10 manholes; 700 ft underdrain
- Traffic control (flaggers, barricades, signs) and erosion control (fiber rolls), with contractor quality control, testing, survey and schedules
- Contract type
- Invitation for Bids (sealed bid) construction contract, one schedule of unit-priced items, using FP-24 specifications
- Period of performance
- Tentative fixed completion date: Fall 2027
- Place of performance
- Riley Creek Campground, Denali National Park, Alaska, just inside the park entrance; about 125 miles SW of Fairbanks, AK (SAM.gov field lists Fairbanks, AK)
- Estimated value
- Between $5,000,000 and $10,000,000
- How they'll choose
- Not yet stated. The notice says the solicitation will be an Invitation for Bids (sealed bid); evaluation details come with the bid package.
What to include when you submit
- Bid package (Invitation for Bids with specifications and plans) is not posted yet; click Follow on the SAM.gov page to be notified
- Technical questions go by email to wfl.plans-spec@dot.gov
- General questions go to wfl.contracts@dot.gov or 360-619-7520
Not in the notice text
- Bid due date and bid opening date (not given; solicitation not yet released)
- How the award will be decided and any evaluation factors (the Invitation for Bids is not posted)
- Bid guarantee/bonding, insurance, wage rate and other requirements (come with the bid package)
- Exact solicitation release date (notice says Fall 2026/Winter 2027; letter says winter of 2026/2027)
- Final plans, specifications and pay quantities (current plans are preliminary)
- Whether any site visit or pre-bid meeting will be held (the letter says no agency personnel will give tours)
- Notice start date and contract duration beyond the tentative Fall 2027 completion
Notice details
Notice type, codes, versions and files
- Posted
- Sep 17, 2026
- Notice type
- Presolicitation
- Office
- 690567 Western Federal Lands Div, Vancouver, WA
- Product/service code
- Y1LB · Construction of Highways, Roads, Streets, Bridges, and Railways
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237310)
- Versions
3 versions have been posted, newest first.
- Nov 19, 2026 · SolicitationDue Dec 22, 2026
- Sep 28, 2026 · Amendment 0001No date on SAM.gov
- Sep 17, 2026 · Presolicitation (this version)No date on SAM.gov
- Attachments
Before you respond
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Cripple Creek Veg Management Roads ReconstructionThe U.S. Forest Service (Chugach National Forest) wants a contractor to rebuild roads at Cripple Creek for vegetation management, in the Anchorage, AK area.
- P1555U Wallace Creek Service RoadOnly the three Civil/Paving multiple-award construction contract (MACC) holders named in the solicitation can bid: Quadrant Construction, Civil Works Contracting and Riza…
- UT NP ARCH 100(2) Bridges on Delicate Arch RoadSolicitation 6982AF27B000005: the Federal Highway Administration (Central Federal Lands Highway Division) wants a contractor to build three 100-foot-span concrete bridges, raise…
- WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8Western Federal Lands Highway Division (Federal Highway Administration) is asking for sealed bids on an invitation for bids (IFB), a sealed-bid construction buy, to repair Upper…
- ID FLAP CLEAR 4783(1), Dent Bridge Road ImprovementsOnly the six named holders of the Idaho, Montana, and Surrounding Areas multiple award task order contract (MATOC) can send proposals on solicitation 69056726R000009.