FCI Three Rivers-Replace Generators, Transformers, and Electrical Infrastructure
Department of Justice · Federal Prison System / Bureau of Prisons
More open Federal Prison System / Bureau of Prisons contracts
AI summaryThe Federal Bureau of Prisons wants a contractor to replace two backup generators, transformers and electrical wiring at the Federal Correctional Institution (FCI) in Three Rivers, Texas, while the prison keeps running. Only businesses in the Small Business Administration's 8(a) program (a program for small, disadvantaged firms) can bid, and the response due date is November 30, 2026, 11:00 AM Eastern. It is a firm-fixed-price (FFP: one set price, whatever the work ends up costing) construction job lasting 450 calendar days from the notice to proceed, and a bid bond is required. More in the summary
A newer version of this notice was posted Oct 27, 2026. See the latest version.
AI summary Beta
Summary of the version posted Oct 20, 2026. The notice was amended Oct 27, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 4 of 14 attachments weren't read (Attachment 7- 24Z5AU6-BASIS_OF_DESIGN_MANUAL.pdf, Attachment 6 24Z5AU6-APP_E_-_LIGHT_CALCS.pdf and 2 more). Check the attachments on SAM.gov.
The Federal Bureau of Prisons wants a contractor to replace two backup generators, transformers and electrical wiring at the Federal Correctional Institution (FCI) in Three Rivers, Texas, while the prison keeps running. Only businesses in the Small Business Administration's 8(a) program (a program for small, disadvantaged firms) can bid, and the response due date is November 30, 2026, 11:00 AM Eastern. It is a firm-fixed-price (FFP: one set price, whatever the work ends up costing) construction job lasting 450 calendar days from the notice to proceed, and a bid bond is required.
Who can bid
- Be an 8(a) small business (a firm in the Small Business Administration's 8(a) program). The set-aside is 100 percent for 8(a) firms, and the cover letter says the solicitation is open to 8(a) small businesses.
- Be registered in SAM.gov. The Government will review the business size information in your registration against the NAICS 236220 size standard of $45.0 million average annual receipts.
- Provide a bid bond (SF 24) of 20% of the bid price, not to exceed $3 million, from a surety listed in Treasury Circular 570, with the liability limit stated as a dollar amount.
How to submit: Email to hbuck@bop.gov; the original wet-signed bid bond is also mailed to FPC Bryan, ATTN: Heather Buck, PO Box 2197, 1100 Ursuline Dr, Bryan, TX 77805. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (14)
- Serious: Only 8(a) firms can bid. This is set aside 100 percent for businesses in the Small Business Administration's 8(a) program; firms outside the program cannot win it.
- Serious: Bid bond with a mailed original. You need a bid bond of 20% of your bid price (up to $3 million) from a Treasury-listed surety, with a scanned copy emailed and the wet-signed original received in Texas by the response due date.
- Serious: Large project with 100% performance and payment bonds. The stated size is $10,000,000 to $20,000,000, and the winner must post performance and payment bonds each equal to the full contract price within 10 days of award.
Show all 14Show fewer
- Serious: Drawings and specifications need an access request. The drawings, project manual, lighting calculations and basis of design manual are controlled files on SAM.gov that you must request access to; the equipment sizes and technical requirements are likely in them.
- Worth checking: Work inside an operating prison. Crews follow escorts, daily tool inventories, badging, and work hours of 7:00 AM to 3:00 PM weekdays, and the Government counts about 1 hour per day for entering and exiting.
- Worth checking: Outage limits and temporary power. You must plan phases to limit electrical outages and supply temporary power for any outage over 24 hours, which adds cost and risk to the price; 7 days' written notice is also needed before disrupting a system.
- Worth checking: Past performance and bank references. Your references and your bank must each email their forms straight to the Contracting Officer, so you need to line them up and follow up with them before the response due date.
- Worth checking: Missing forms can make a quote non-responsive. Leaving out required forms or changing the terms may cause the Government to treat the quote as non-responsive and ineligible for award.
- Worth checking: Evaluation factors described two ways. The notice says quotes are judged on price and past performance, but the attached evaluation document lists five factors, with non-price factors weighted more than price; ask the contracting officer which governs.
- Worth checking: Question deadline times differ. The notice gives November 6, 2026 at 4:00 PM EST for questions, while the Instructions to Offerors give November 6, 2026 at 10:00 AM EST; ask the contracting officer which governs.
- Worth checking: Site visit on October 29, 2026 is optional. The site visit and pre-bid conference are at 8:00 AM CST at the FCI lobby; attendees need an approved criminal history check, with paperwork due October 23, 2026 at 4:00 PM ET per the notice.
- Minor: Davis-Bacon wage rates apply. This construction job is covered by the attached Davis-Bacon wage determination TX20260209 Revision 1 (Live Oak County), so your price must use at least those pay rates.
- Minor: Submittal timing differs between documents. The statement of work wants equipment submittals within 15 days of the notice to proceed, while the solicitation says within 10 calendar days after work begins; the statement of work also gives two different timings for security paperwork.
- Minor: Cover letter shows a different solicitation number. The cover letter's subject line lists a different request for quotations number and calls the award a task order, while the notice and solicitation use 15BNAS27Q00000002 and a single contract.
Read from the notice and 10 attachments. 4 of 14 not read. Show which files.
- Instructions to Offerors Three Rivers Generators.pdf (read)
- Cover Letter Request for Quote Solicitation 15BNAS27Q00000002.pdf (read)
- Attachment 3 SOW TRV 24Z5AU6.pdf (read)
- Cost Summary Spreadsheets.pdf (read)
- Attachment 2 EVALUATION FACTORS AND BASIS FOR AWARD.pdf (read)
- Attachment 1 - Solicitation No. 15BNAS27Q00000002.pdf (read)
- Attachment 11 Whistleblower Information- Employee Rights.pdf (read)
- Attachment 9 SF24-Bid Bond.pdf (read)
- Attachment 8 DBA TX20260209 Revision 1 Live Oak County.pdf (read)
- Attachment 10 NCIC Criminal History Check Form.pdf (read)
- Attachment 7- 24Z5AU6-BASIS_OF_DESIGN_MANUAL.pdf: not read (access is restricted): request it on SAM.gov
- Attachment 6 24Z5AU6-APP_E_-_LIGHT_CALCS.pdf: not read (access is restricted): request it on SAM.gov
- Attachment 5 24Z5AU6-APP_B_-_PROJECT_MANUAL.pdf: not read (access is restricted): request it on SAM.gov
- Attachment 4 24Z5AU6-APP_A-DRAWINGS.pdf: not read (access is restricted): request it on SAM.gov
Full summary
What they want
- Replace Generators 1 and 2 (the facility's two backup generators), the transformer and the electrical wiring and equipment that go with them, as shown in the drawings and specifications. Schedule: contract line item number (CLIN: one priced line of the order) 0001, quantity 1 JB (job), priced as one lump sum.
- Keep FCI Three Rivers running during the work: submit a phasing plan for approval that limits electrical outages, and supply temporary power for any outage longer than 24 hours.
- Do demolition, construction, installation, testing and commissioning (startup checks); give the Contracting Officer's Representative (COR) 5 days' notice before final system tests, and have the manufacturer's field representative inspect and report before start-up.
- Send equipment submittals (written descriptions of the equipment you propose) and safety data sheets; keep a submittal register.
- Work inside prison rules: 7:00 AM to 3:00 PM weekdays, staff escorts, tool inventory in and out each day, contractor badges and approved criminal history checks for every worker.
- After testing: deliver an installation certification, operation and maintenance manuals, as-built drawings and warranties, and train at least 2 Bureau of Prisons employees.
- Pay at least the wage rates in the attached Davis-Bacon wage determination (the Department of Labor's required construction pay rates) TX20260209 Revision 1.
- Clean up daily and haul away debris; repair any government property your crews damage.
- Contract type
- Firm-fixed-price construction contract, issued as a request for quote (RFQ) under a combined synopsis/solicitation
- Period of performance
- 450 calendar days from the notice to proceed
- Place of performance
- FCI Three Rivers, 1700 HWY 72 WEST, Three Rivers, TX 78071 (an operating federal prison)
- Estimated value
- Project magnitude between $10,000,000 to $20,000,000 (a size range stated in the solicitation, not a Government estimate)
- How they'll choose
- Best-value tradeoff (the Government may pay more for a better-rated offer); the attached evaluation document says non-price factors combined are significantly more important than price. The notice text itself says quotes are evaluated on price and past performance.
- Offers due
- November 30, 2026, 11:00 AM Eastern (from the version posted Oct 20, 2026; amended since)
- How to submit
- Email to hbuck@bop.gov; the original wet-signed bid bond is also mailed to FPC Bryan, ATTN: Heather Buck, PO Box 2197, 1100 Ursuline Dr, Bryan, TX 77805
What they'll judge offers on
- Technical Approach and Project Execution: understanding of the work, installation method, testing and commissioning, construction phasing, limiting outages, temporary power when outages exceed 24 hours
- Relevant Experience and Technical Capability: similar projects, generator replacement, transformer installation, electrical distribution, work inside operating facilities, qualified staff and equipment
- Project Management, Safety, and Security: scheduling, coordination, quality control, personnel access and security clearances, tool accountability, material storage, electrical safety
- Past Performance: recent, relevant contracts; no record means a Neutral rating
- Price: total firm-fixed price, checked for reasonableness and completeness
What to include when you submit
- Email everything as PDF files to hbuck@bop.gov. Quotes sent by mail or hand carried will not be evaluated. Name the file OFFER_ 15BNAS27Q00000002 _COMPANY NAME_ FCI Three Rivers Generator Install.
- Send all pages of the written solicitation with your quote, plus a technical proposal, a price proposal, a signed Standard Form 1442 (SF 1442: the form you sign and return as your offer) and completed representations and certifications.
- Technical proposal: technical and management approach, anticipated construction schedule with milestones, key personnel, quality control and safety approach, and assumptions that affect performance.
- Price proposal: total price, a breakdown of labor, material and equipment, and basis of estimate. Use the attached Cost Summary Spreadsheets (prime, each subcontractor, and a final summary) or a similar format.
- SF 1442 pages 1 and 2: complete blocks 10 and 14 through 20c, include the signer's title in block 20a, and make the block 14 address match your SAM.gov registration. Include your Unique Entity Identifier (UEI), tax ID, CAGE code and email in block 10.
- Section 2 schedule: enter the Unit Price (JB = job) and Amount for CLIN 0001. The amount must match block 17 of the SF 1442.
- Complete the Offeror Representations and Certifications, check (1) or (2) in provision 52.209-13, and complete items (d)(1) and (d)(2) of provision 52.229-11.
- Acknowledge every amendment with your quote.
- Bid bond: send a scanned Standard Form 24 (SF 24) bid bond with the emailed quote. The original, with wet signature and raised seal if applicable, must reach the FPC Bryan address by the response due date.
- Past performance: send the past performance questionnaire to at least 3 companies or government agencies for which you have current work or finished work within the last 24 months. References should be in the same range as your bid price and for similar work. If you have no similar references, include a separate letter saying so.
- Your references must email their completed questionnaires directly to hbuck@bop.gov, not through your firm. Also send the bank reference questionnaire to your bank, and the bank must email it back directly.
- Narrative parts must be searchable PDF files that open in Adobe Acrobat Reader 11 and Microsoft Office Suite 2016, with no embedded sound or video. Label each volume, section and item, and run a virus scan before sending.
After award, you must have
- Within 10 days after award, give the Contracting Officer a performance bond and a payment bond, each for 100 percent of the original contract price. From Attachment 1 - Solicitation No. 15BNAS27Q00000002.pdf:
…contract award shall be 100 percent of the original contract price.
- Carry insurance during the work: workers compensation and employer's liability of at least $100,000, general liability of $500,000 per accident or occurrence for bodily injury, and auto liability of $200,000 per person, $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. From Attachment 1 - Solicitation No. 15BNAS27Q00000002.pdf:
(1) WORKERS COMPENSATION & EMPLOYER'S LIABILITY $100,000…
- Give the COR security clearance paperwork for every worker, including subcontractor workers, within 14 days of the notice to proceed. Only the prime contractor may submit it, and a worker who does not pass must be replaced. From Attachment 3 SOW TRV 24Z5AU6.pdf:
The contractor shall provide the COR with all the necessary security clearance documents for all contractors and…
Not in the notice text
- The drawings (Attachment 4), project manual (Attachment 5), lighting calculations (Attachment 6) and basis of design manual (Attachment 7) are attached but not read; SAM.gov marks them controlled, so request access there. Generator and transformer sizes and technical requirements are likely in them.
- Part of the solicitation document (Attachment 1) was left out of what was read, including some clause text.
- Whether a state electrical contractor license or other trade license is required isn't stated in the text read; check the project manual.
- How many transformers are being replaced isn't stated in the text read; the notice says transformers, and the schedule says transformer.
Eligibility and how to respond
- Only firms in SBA's 8(a) program can bid as the prime contractor. Not in the 8(a) program? How the 8(a) program works. More open 8(a) set-asides under NAICS 236220
- How to submit, from the AI summary: Email to hbuck@bop.gov; the original wet-signed bid bond is also mailed to FPC Bryan, ATTN: Heather Buck, PO Box 2197, 1100 Ursuline Dr, Bryan, TX 77805. Check it in the notice before you send anything.
- Construction contracts over $2,000 pay at least the local Davis-Bacon wage rates, from the wage determination in the solicitation. Price your labor from it: How to price a government contract, and how Davis-Bacon differs from the Service Contract Act.
Notice details
- Posted
- Oct 20, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- National Acquisitions - Co, Washington, DC
- Product/service code
- Z2NZ · Repair or Alteration of Other Utilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
6 versions have been posted, newest first.
- Oct 27, 2026 · Amendment 0005Due Nov 30, 2026
- Oct 20, 2026 · Amendment 0004Due Nov 30, 2026
- Oct 20, 2026 · Amendment 0003 (this version)Due Nov 30, 2026
- Oct 19, 2026 · Amendment 0002Due Nov 30, 2026
- Oct 15, 2026 · Amendment 0001Due Nov 30, 2026
- Oct 15, 2026 · Combined Synopsis/SolicitationDue Nov 30, 2026
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Open 8(a) set-aside contracts
Terms on this notice: Solicitation, 8(a) program, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- ID-KOOSKIA NFH-Repair Electrical Service to MechanThe U.S. Fish and Wildlife Service (FWS), under the Department of the Interior, wants the main electrical service line to the mechanical building repaired at Kooskia National…
- 652-24-101 Improve Electrical Distribution
- Black Warrior, Tombigbee, Alabama, Coosa Rivers Project Management Office
- 613-22-700 | EHRM Infrastructure Upgrades Construction | Martinsburg, WVSources sought 36C77627Q0036 is market research, not a solicitation: the Department of Veterans Affairs (VA), Program Contracting Activity Central, wants to hear from general…
- RAPID (Robins Agile Practices for Infrastructure Development) at Robins AFB