Solicitation
Reserve Basin Maintenance Dredging Contract for Sites at the Phildelphia Navy Yard in the Public Works Department Pennsylvania Area of Responsibiliy
Department of Defense · Department of the Navy
A newer version of this notice was posted Oct 9, 2026. It moves the due date from Oct 15, 2026 to Jan 15, 2027, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov. This summary may miss requirements: 11 of 23 attachments weren't read (AMEND0003 - Biles_pre acceptance letter NY 2026.pdf, Attachment F - PIEE Vendor Access Instructions.pdf and 9 more). Check the attachments on SAM.gov.
The Navy (NAVFAC Mid-Atlantic) wants a contractor to dredge about 96,611 cubic yards of sediment from the Reserve Basin and Schuylkill River Access Channel at the Philadelphia Navy Yard, then haul it by barge to an approved disposal site in New Jersey or Pennsylvania. It is an unrestricted (no set-aside) sealed bid, firm-fixed-price, with a stated construction magnitude of $5 million to $10 million and 270 calendar days to finish. Bonds, a bid guarantee and a heavy marine dredging operation (24/7 work, 5,000 cubic yards a day minimum) make it a hard fit for a small business without dredging experience.
Who can bid (9)
- No set-aside: open to all businesses (full and open competition). Small and large firms compete on the same footing. From N4008526B0002.pdf
- Bid guarantee with the bid (at least 20 percent of the price, capped at $3 million) From N4008526B0002.pdf
- Payment and performance bonds, due within 10 days after award From N4008526B0002.pdf
Show all 9Show fewer
- Active SAM registration with representations and certifications From N4008526B0002.pdf
- VETS-4212 (veterans' employment report) filing confirmation From N4008526B0002.pdf
- Cybersecurity (CMMC) Level 1 self-assessment status entered in SPRS before award for any system that handles federal contract information From N4008526B0002.pdf
- QC Manager with at least 5 years combined experience in listed construction roles and at least 2 years as a QC Manager, familiar with EM 385-1-1; the licensed professional engineer requirement was waived by amendment From AMEND0003 Rev Spec Section 01 45 00.pdf
- Pass a responsibility determination (financial capacity, bank reference, experience on similar work) if low bidder
- Minimum insurance: workers' compensation and employer's liability, general liability, automobile liability and vessel liability as determined by the agency From N4008526B0002.pdf
How to submit: Electronic bid in PDF through the PIEE Solicitation Module only. Emailed submissions will not be accepted; the bid must be linked to the correct solicitation number in PIEE.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
From the version posted Oct 9, 2026.
- Serious: Bid guarantee and full bonding. You need a bid bond of at least 20 percent of your price (up to $3 million) with the bid, then performance and payment bonds within 10 days of award on a project the Government sizes at $5-10 million. From N4008526B0002.pdf
- Serious: You carry the disposal cost and contamination risk. The contractor pays all disposal fees and deals directly with the disposal site owners; RFI answers mention high PFOS and TCLP levels and say NAVFAC stays the generator and will pursue other sites only through a contract modification if material is rejected. From Amendment 0003 RFI Responses.pdf
- Serious: Work cannot start until permits are in place. Notice to proceed waits on the Army Corps dredging permit, and the Corps letter bars disposal at Biles Island until it receives the Pennsylvania DEP final approval, so start dates and cost of waiting are uncertain. From Amendment 0001 RFI Responses.pdf
Show all 11Show fewer
- Serious: Heavy 24/7 marine operation on a short schedule. Minimum 5,000 cubic yards per day around the clock, a 270-day finish, a Level 1 safety officer on each shift, and a DO-C2 defense priority rating make this a job for an experienced dredging contractor with barges, tugs and a clamshell dredge. From N4008526B0002.pdf
- Serious: Live 15 kV submarine power cable in the dredge area. No details on the cable (size, depth, whether it is de-energized) are available, and the contractor must arrange locating and work with the utility owner. From Amendment 0003 RFI Responses.pdf
- Worth checking: In-water work window is stated two ways. The solicitation bars in-water work from March 15 to 'June 31' (a date that does not exist), while the Army Corps permit letter says to avoid in-water work March 1 to June 30; ask the contracting officer which applies before pricing the schedule. From N4008526B0002.pdf
- Worth checking: Large responsibility package and financial proof. Bids must include a signed bank reference, three years of certified or signed financial statements (for each company in a joint venture) and project history, which a young or thinly capitalized firm may struggle to supply. From N4008526B0002.pdf
- Worth checking: Limited site information; no site visit planned. No site visit is anticipated, the date of the last dredging and past debris records are not available, no survey exists for Whites Basin or Biles Island, and the survey XYZ file must be requested through DoD SAFE, so debris and quantity risk is on the bidder. From N4008526B0002.pdf
- Worth checking: Disposal capacity letter covers less than the full volume. The Weeks Marine acceptance letter refers to about 72,100 cubic yards (the job is up to 96,611) and is conditional on sediment review, approvals and commercial terms. From AMEND0003 - Material Acceptance 080425.pdf
- Minor: Davis-Bacon wages apply; no diver rate listed. Wage determinations PA20260002 and PA20260028 apply, and a missing diver classification is handled through a Department of Labor conformance request after award, so labor cost for divers is unsettled.
- Minor: Many amendments to acknowledge. There are four amendments (the due date moved from May 2026 to January 2027); the SF 1442 must acknowledge all of them, and the bid is checked against the latest Section 01 45 00 and plans.
Read from the notice and 12 attachments. 11 of 23 not read. Show which files.
- Amendment 0003 RFI Responses.pdf (read)
- Amendment 0001 RFI Responses.pdf (read)
- N4008526B0002.pdf (read)
- AMENDMENT 0004.pdf (read)
- AMENDMENT 0003.pdf (read)
- AMENDMENT 0002.pdf (read)
- Amendment 0001 - Updated Spec.pdf (read)
- AMENDMENT 0001.pdf (read)
- AMEND0003 Rev Spec Section 01 45 00.pdf (read)
- AMEND0003 - Final Approved Plans E1-E5.pdf (read)
- AMEND0003 - NWP Letter (2026).pdf (read)
- AMEND0003 - Material Acceptance 080425.pdf (read)
- AMEND0003 - Biles_pre acceptance letter NY 2026.pdf: not summarized: open it on SAM.gov
- Attachment F - PIEE Vendor Access Instructions.pdf: not summarized: open it on SAM.gov
- Attachment A - 1783178 PNY RESERVE BASIN FY26 MAINTENANCE DREDGING SPECS.pdf: not summarized: open it on SAM.gov
- Attachment B - 1783178 PNY RESERVE BASIN FY26 MAINTENANCE DREDGING PLANS.pdf: not summarized: open it on SAM.gov
- Attachment C - Bid Schedule.docx: not summarized: open it on SAM.gov
- Attachment E - Small Business Subcontracting Plan (SBSP) Template.docx: not summarized: open it on SAM.gov
- Attachment D - Request for Information (RFI) Form.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- AMENDMENT 0003 Wage Determination PA20260028 05 18 26.docx: not summarized: open it on SAM.gov
- AMENDMENT 0003 Wage Determination PA20260002 07 30 26.docx: not summarized: open it on SAM.gov
- Attachment 1 - Wage Determination PA20260028 01-30-26.pdf: not summarized: open it on SAM.gov
- Attachment 1 - Wage Determination PA20260028 01-30-26.docx: not summarized: open it on SAM.gov
Full summary
What they want
- Maintenance-dredge about 96,611 cubic yards in the North Side (Wharf N) of the Reserve Basin and the Schuylkill River Access Channel with a sealed environmental clamshell bucket, to a minimum depth of -30 ft MLLW and a maximum over-dredge of -32 ft MLLW
- Haul the dredged material by scow or barge to an approved disposal site: Weeks Marine Whites Rehandling Basin (Logan Township, NJ) or Waste Management Biles Island (Morrisville, PA); all Area RB-A 7/8 material must go to Biles Island
- Work 24 hours a day, 7 days a week at a minimum production rate of 5,000 cubic yards per day
- Remove and dispose of any artificial obstructions or debris found inside the dredge limits
- Hire an independent third-party surveyor for the pre- and post-dredge surveys (the Government calculates the pay volumes)
- Deploy and keep working a turbidity curtain during basin dredging, built to the detail on plan sheet V-002
- Run a contractor quality control program with a qualified QC Manager, and a Level 1 Site Safety and Health Officer on each shift
- Furnish all labor, equipment, utilities and coordination (15 kV submarine cable, 26th Street drawbridge openings, vessel moves, barge mooring)
- Contract type
- Firm-fixed-price construction contract awarded by sealed bid (IFB), one lump-sum CLIN 0001; DPAS priority rating DO-C2
- Period of performance
- Start within 15 calendar days after notice to proceed and finish within 270 calendar days. Notice to proceed is tied to getting the new dredging permit from the Army Corps of Engineers.
- Place of performance
- Philadelphia, PA (SAM.gov field). Documents describe the Reserve Basin and Schuylkill River Access Channel at the Philadelphia Navy Yard; disposal is at Whites Basin (NJ) or Biles Island (Bucks County, PA).
- Estimated value
- Magnitude of construction between $5,000,000 and $10,000,000 (per FAR 36.204, as stated in the solicitation)
- How they'll choose
- Sealed bidding: award to the responsible bidder with the bid most advantageous to the Government considering only price and price-related factors. Bidders give one lump-sum price for CLIN 0001.
- Offers due
- 15 Jan 2027, 2:00 PM Eastern Standard Time per Amendment 0004 (SAM.gov field: Jan 15, 2027, 2:00 PM EST). The date has been moved several times by amendments.
- How to submit
- Electronic bid in PDF through the PIEE Solicitation Module only. Emailed submissions will not be accepted; the bid must be linked to the correct solicitation number in PIEE.
What they'll judge offers on
- Price: lump-sum Base Bid for CLIN 0001 (only price and price-related factors; bids are rounded down to the nearest whole dollar)
What to include when you submit
- Cover page with solicitation number and title, bidder name, address, phone, fax, UEI, EIN, CAGE code and point of contact
- Completed SF 1442, signed, with all amendments acknowledged
- Section 00 10 00 of the SF 1442 (CLIN 0001) and Attachment C Bid Schedule Form
- Copy of representations and certifications and proof of SAM registration
- Confirmation of VETS-4212 filing for the 2024/2025 cycle
- Bid guarantee under FAR 52.228-1, at least 20 percent of the bid price and not more than $3 million
- Responsibility information (kept private, not scored): personnel and management, technical and management plans with schedule, facilities and equipment, similar experience, signed bank reference, three years of financial statements, current work and past contracts with references
- Small Business Subcontracting Plan is listed among the bid items (the template is Attachment E, which was not read)
- Questions go in writing on the Attachment D RFI form to the Contract Specialist (Brittany Cristelli) at least 14 calendar days before the bid closing date
- Bids must stay open for 120 calendar days after the due date
Not in the notice text
- The full specifications (Attachment A), plans (Attachment B), Bid Schedule (Attachment C), RFI form, subcontracting plan template (Attachment E) and PIEE instructions were not read (over the file limit); the technical dredging, environmental and safety requirements are in them
- The middle of the main solicitation document (clauses such as liquidated damages and other conditions) was not read
- The Davis-Bacon wage determinations (PA20260002 and PA20260028) were not read, so wage rates are unknown
- The Biles Island pre-acceptance letter and the Pennsylvania DEP approval status were not read
- Whether a Small Business Subcontracting Plan is required of small businesses, or only others, is not stated in what was read
- Whether the June 12, 2026 Army Corps NWP 35 verification letter attached to Amendment 0003 is the 'new permit' that the Amendment 0001 RFI answer says must be issued before dredging can start is not stated
- Liquidated damages amount, if any, and the timing of notice to proceed are not stated
- Bathymetric data for Whites Basin and the Biles Island approach, the date of the last dredging and past debris disposal records are not available
- Survey XYZ file (Nov 2023) must be requested by email from the Contract Specialist for a DoD SAFE link
- Sediment report Appendix B and C (field logbooks and core logs) are available on request
More to check before you bid
- The AI summary also reads the notice as naming requirements:
- The AI summary's reading of the notice and its attachments says a bidder needs: CMMC certification. The summary's list is under Who can bid; check it in the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Aug 13, 2026
- Notice type
- Solicitation
- Office
- Navfacsyscom Mid-Atlantic, Norfolk, VA
- Product/service code
- Z1KF · Maintenance of Dredging Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237990)
- Versions
12 versions have been posted, newest first.
- Oct 9, 2026 · Amendment 0010Due Jan 15, 2027
- Oct 9, 2026 · Amendment 0009Due Jan 15, 2027 (changed)
- Aug 13, 2026 · Amendment 0008 (this version)Due Oct 15, 2026
- Aug 13, 2026 · Amendment 0007Due Oct 15, 2026 (changed)
- Jun 2, 2026 · Amendment 0006Due Aug 19, 2026
- Jun 2, 2026 · Amendment 0005Due Aug 19, 2026 (changed)
- May 18, 2026 · Amendment 0004Due Jun 5, 2026
- May 18, 2026 · Amendment 0003Due Jun 5, 2026 (changed)
- Apr 23, 2026 · Amendment 0002Due May 27, 2026
- Apr 23, 2026 · Amendment 0001Due May 27, 2026
- Apr 23, 2026 · SolicitationDue May 27, 2026 (changed)
- Apr 8, 2026 · PresolicitationDate Apr 23, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Jacksonville Harbor Maintenance DredgingThe U.S. Army Corps of Engineers, Enterprise Dredge Delivery Center posted solicitation W912PM27BA003 for maintenance dredging of Jacksonville Harbor, FL, a firm-fixed-price…
- Norfolk Harbor Inner Channel and Channel to Newport News Maintenance DredgingThe U.S. Army Corps of Engineers, Norfolk District (W2SD ENDIST NORFOLK) is asking for sealed bids (an invitation for bids) on maintenance dredging of the Norfolk Harbor Inner…
- Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance DredgingThe Department of the Army (W074 ENDIST WILMINGTON), for the U.S. Army Corps of Engineers Enterprise Dredge Delivery Center (EDDC), wants maintenance dredging at three harbors:…
- Annual Maintenance Dredging of Morehead City Inner HarborThe U.S. Army Corps of Engineers, Wilmington District plans to award a contract for annual maintenance dredging of the Morehead City Inner Harbor in North Carolina.
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 2-2025 (OM25276)The Army Corps of Engineers New Orleans District plans to solicit a fully crewed cutterhead dredge to do maintenance dredging in the Mississippi River Southwest Pass.