Solicitation
A-E Services for Electron Injector Complex
Department of Energy
AI summary Beta
This summary may miss requirements: 9 of 17 attachments weren't read (RFP Amendment 2.zip, RFP Amendment 1.zip and 7 more). Check the attachments on SAM.gov.
Brookhaven National Laboratory (a Department of Energy lab run by a contractor) wants an architect-engineer (A/E) firm for the design of the Electron Injector Complex for the Electron-Ion Collider (EIC) in Upton, New York. This is a request for proposals with no set-aside. Responses are due November 30, 2026 at 5:00 PM Eastern. The proposal instructions are in the RFP letter and its enclosures, which are in zip files that were not read.
Things to watch
From the version posted Nov 20, 2026.
- Serious: Proposal requirements are in unread files. The RFP letter, enclosures, both amendments, the statement of work and the injector design documents are in zip files or were too large to read, so the evaluation, format and scope details are unknown.
- Worth checking: Amended twice, with a changed questions due date. Amendment 1 changed the questions due date and Amendment 2 added Addendum 1 to the statement of work and posted answers to questions. Read both before you write an offer.
- Minor: Buyer is the lab's management contractor. The SAM.gov agency line shows the Brookhaven lab's DOE contractor, so this is likely a contractor-run purchase with its own terms. The notice does not say more.
Read from the notice and 8 attachments. 9 of 17 not read. Show which files.
- NEPA - BHSO Letter June 2025.pdf (read)
- EIC-QAG-PLN-002 Quality Assurance Plan for EIC.pdf (read)
- EIC-ORG-RSI-026 Rev 2 EIC Code of Record 2025.pdf (read)
- EIC Infrastructure HDR Basis of Design.pdf (read)
- NEPA-DOE BHS EA for EIC.pdf (read)
- EIC Fire Hazard Analysis - Prelim FP Assessment.pdf (read)
- Finding of No Significant Impact (FONSI).pdf (read)
- EIC-ESH-PLN-008 EIC Hazard Analysis Report 2025.pdf (read)
- RFP Amendment 2.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
- RFP Amendment 1.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Basis of Design - EIN_Injector.pdf: not read (it couldn't be opened): open it on SAM.gov
- EIN_Concept Design.pdf: not read (it couldn't be opened): open it on SAM.gov
- RFP Letter - Attachments - Enclosures.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
- EIC Drawings Vol. I.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
- EIC Infrastructure Drawings_Volume III.pdf: not read (it couldn't be opened): open it on SAM.gov
- EIC Infrastructure Drawings_Volume II.pdf: not read (it couldn't be opened): open it on SAM.gov
- EIC Infrastructure Drawings_Volume IV.pdf: not read (it couldn't be opened): open it on SAM.gov
Full summary
What they want
- Architect-engineer (A/E) design services for the EIN Injector Complex project at Brookhaven National Laboratory
- The injector is the Electron Injector System: a linear accelerator, a beam accumulator ring and a Rapid Cycling Synchrotron (RCS) ring, per the background Basis of Design
- The exact scope is in the signed statement of work (SOW) and Addendum 1, which were not read
- Place of performance
- Upton, NY, USA
- Estimated value
- Not stated
- Offers due
- November 30, 2026, 5:00 PM Eastern
What to include when you submit
- Follow the proposal submission requirements in the RFP letter and its attachments, which were not read
Not in the notice text
- The RFP letter, enclosures, Amendments 1 and 2, the drawings volumes and the concept design and Basis of Design for the injector are in zip files or PDFs that were attached but not read. Evaluation factors, page limits, how to submit and the question deadline are likely there.
- The signed statement of work and Addendum 1 are posted on SAM.gov but their text was not read here.
- The contract type, period of performance and estimated value are not stated in the text read.
- Whether any small business subcontracting or other teaming requirement applies is not stated.
More to check before you bid
- Architect-engineer services tied to buildings or construction are usually bought under the Brooks Act: the agency ranks firms on qualifications from an SF 330 first, then negotiates a price with the top firm. How A/E contracts work.
- Service contracts usually set minimum pay rates (the Service Contract Act). Price the labor with the SCA price calculator.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 20, 2026
- Notice type
- Solicitation
- Office
- Brookhaven Natl Lab -DOE Contractor, Upton, NY
- Product/service code
- C1HC · Architect and Engineering – Construction: Govt-Owned CTR-Operated (GOCO) Environmental Laboratories
- Business type
- Engineering, architecture & research (FedReady's grouping, from NAICS 541330)
- Versions
4 versions have been posted, newest first.
- Nov 20, 2026 · Amendment 0002 (this version)Due Nov 30, 2026
- Nov 3, 2026 · AmendmentDue Nov 30, 2026
- Oct 29, 2026 · AmendmentDue Nov 30, 2026
- Oct 23, 2026 · SolicitationDue Nov 30, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
This is an official Request for Proposal (RFP) for the EIN Injector Complex A/E Design project at Brookhaven National Labs. Refer to the RFP Letter and attachments for details and proposal submission requirements. Amendment 1 is posted to update the RFP letter amendment 1 for highlighted changes, specifically as it relates to the questions due date. The signed SOW is also included to the list of attachments. Amendment 2 is posted to incorporate Addendum 1 to the Statement of Work and post responses to the questions submitted in response to this RFP. See attachments section for Addendum 1 and the Q&A responses.