Solicitation
Request for Proposal (RFP) - Resilient Missile Warning Tracking (RMWT) Low Earth Orbit (LEO) Ground Entry Points (GEPs)
Department of Defense · Department of the Air Force
A newer version of this notice was posted Nov 19, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 13, 2026. The notice was amended Nov 19, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 4 of 15 attachments weren't read (Attachment 7.c. RMWT LEO GEPs Unpriced BOE Template IDIQ Base.xlsx, Attachment 7.c.1 RMWT LEO GEPs Unpriced BOE Template TO 01.xlsx and 2 more). Check the attachments on SAM.gov.
The Space Development Agency (SDA), part of the Air Force, wants one contractor to build, install, test and maintain ground entry point (GEP) sites for Resilient Missile Warning Tracking (RMWT) low earth orbit (LEO) satellites, under solicitation FA240126R0003. This is one indefinite-delivery, indefinite-quantity (IDIQ) contract, a contract that lets the agency place task orders over time, with a ceiling of $369,000,000. Task Order 1 is awarded at the same time. No set-aside is used. The response due date is December 18, 2026, 4:00 PM Eastern. Key technical documents are controlled and go only to vetted, cleared firms on request.
Who can bid (7)
- Active SAM.gov registration and a CAGE code (needed to request access to the Bidders' Library) From RMWT LEO GEPs Cover Letter_RFP_18Sep26_signed.pdf
- Access to the Bidders' Library, which holds controlled technical documents, is limited to U.S. citizens at cleared defense contractors with an active Joint Certification Program (JCP) certification From RMWT LEO GEPs Cover Letter_RFP_18Sep26_signed.pdf
- Security volume: secure facility address, security officer contacts and foreign ownership, control or influence (FOCI) status; foreign-owned firms need an approved mitigation plan or agreement From Attachment 7.e. RMWT LEO GEPs Personnel & Facilities Template.docx
Show all 7Show fewer
- Recent, relevant past performance: work within five calendar years of the proposal due date From Attachment 8 - RMWT LEO GEPs Section M Eval Factors.pdf
- Organizational conflict of interest (OCI) assessment, and a plan if you intend to bid on other Tranche 3 work; a Space Development Agency systems engineering and technical assistance (SETA) contractor cannot also hold this contract From Attachment 7 - RMWT LEO GEPs Section L Proposal Instructions.pdf
- Minimum small business participation: 5 percent of total proposed value for large businesses; 50 percent for services (within the limits on subcontracting) for small businesses From Attachment 7 - RMWT LEO GEPs Section L Proposal Instructions.pdf
- Statement that the proposal stays firm for at least 180 days from the proposal due date From Attachment 7 - RMWT LEO GEPs Section L Proposal Instructions.pdf
How to submit: Upload through the Department of Defense Secure Access File Exchange (DoD SAFE, safe.apps.mil) after requesting a SAFE drop-off from the SDA mailbox; Volume VII (cover letter and Standard Form 33 offer) also goes by email to the SDA mailbox. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
- Serious: Controlled and classified documents limit who can see the requirements. The statements of work and technical requirements are controlled, and library access goes only to vetted, cleared U.S.-citizen firms with a Joint Certification Program certification, so a firm without these may not be able to price the work. From RMWT LEO GEPs Cover Letter_RFP_18Sep26_signed.pdf
- Serious: Secure facility and foreign ownership disclosure. The security volume asks for a secure facility address, security officer contacts and foreign ownership status, and foreign-owned firms must have an approved mitigation plan or agreement. From Attachment 7.e. RMWT LEO GEPs Personnel & Facilities Template.docx
- Worth checking: Response due date is December 18, 2026 in the notice, but the attachments show November 2, 2026. The notice text moved the due date and says the attachments will be updated; the cover letter and Section L still carry the older date, and an amendment is expected to revise Sections L and M and the price templates. From RMWT LEO GEPs Cover Letter_RFP_18Sep26_signed.pdf
Show all 9Show fewer
- Worth checking: Very large, global work with a $369,000,000 ceiling. Sites are on U.S. military and foreign sovereign facilities, and past performance is judged on size, scope and complexity, which is a heavy lift for a small business without a strong team. From Attachment 6. - RMWT LEO GEPs IDIQ Ordering Procedures.pdf
- Worth checking: Bidding on other Tranche 3 work creates a conflict of interest. Winning this contract may bar you from other Tranche 3 contracts, and you must guarantee you will avoid conflicts for the life of the contract. From Attachment 7 - RMWT LEO GEPs Section L Proposal Instructions.pdf
- Worth checking: Small business prime must self-perform at least half. A small business offeror must meet a 50 percent minimum for services, and the Government checks the limits on subcontracting, so heavy teaming can hurt a small prime. From Attachment 7 - RMWT LEO GEPs Section L Proposal Instructions.pdf
- Worth checking: A late part removes the whole proposal. Every volume must arrive through DoD SAFE by the response due date; the SAFE drop-off must be requested ahead of time from the SDA mailbox. From Attachment 7 - RMWT LEO GEPs Section L Proposal Instructions.pdf
- Worth checking: Funds are not presently available. The Government's obligation depends on funds being made available, and it may award no contract at all. From RMWT LEO GEPs Cover Letter_RFP_18Sep26_signed.pdf
- Minor: Fewer subcontract tiers rate much higher. Layered teams score worse on subcontractor management, which matters for a small business planning to team. From Attachment 8 - RMWT LEO GEPs Section M Eval Factors.pdf
Read from the notice and 11 attachments. 4 of 15 not read. Show which files.
- RMWT LEO GEPs Cover Letter_RFP_18Sep26_signed.pdf (read)
- Attachment 7 - RMWT LEO GEPs Section L Proposal Instructions.pdf (read)
- Attachment 8 - RMWT LEO GEPs Section M Eval Factors.pdf (read)
- Attachment 5.a - RMWT LEO GEPs Model IDIQ Contract - FA240126R0003.pdf (read)
- Attachment 5.b - RMWT LEO GEPs Model Task Order 01 - FA2401XXF000X.pdf (read)
- Attachment 6. - RMWT LEO GEPs IDIQ Ordering Procedures.pdf (read)
- Attachment 7.b. RMWT LEO GEPs Small Business Participation.docx (read)
- Attachment 7.e. RMWT LEO GEPs Personnel & Facilities Template.docx (read)
- Attachment 4.a - RMWT LEO GEPs IDIQ DD Form 1423, Contract Data Requirements List (CDRLs).pdf (read)
- Attachment 4.b - RMWT LEO GEPs Task Order 01 DD Form 1423, Contract Data Requirements List (CDRLs).pdf (read)
- Attachment 7.a.RMWT LEO GEPs Past Performance Questionnaire (PPQ).docx (read)
- Attachment 7.c. RMWT LEO GEPs Unpriced BOE Template IDIQ Base.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attachment 7.c.1 RMWT LEO GEPs Unpriced BOE Template TO 01.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attachment 7.d RMWT LEO GEPs Price Template.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attachment 9 - RMWT LEO GEPs DD2794 CSDR Plan.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- GEP site civil work: detailed design through completed construction at multiple, globally dispersed sites
- Buy, install, integrate, test and verify communications shelters, antennas and antenna electronics, optical terminals and optical electronics
- GEP site networking equipment and software
- Test hardware, training and onsite test support
- Program management and systems engineering, including site surveys, security measures at each site and trade studies
- Maintenance of GEP sites and terminals
- Task Order 1, issued at the time of IDIQ award, with its own statement of work
- Contract data requirements lists (CDRLs): the reports and data items the contractor must deliver
- Contract type
- Indefinite-delivery, indefinite-quantity (IDIQ) contract with firm-fixed-price (FFP: one set price) lines and cost-reimbursable (CR: the Government pays allowed actual costs) lines for other direct costs and travel; one award planned, with Task Order 1 at award
- Period of performance
- Ordering period March 31, 2027 to September 30, 2031, plus an option ordering period October 1, 2031 to September 30, 2035 (about 8.5 years in all); the Government may adjust the start date if award comes earlier or later
- Place of performance
- Washington, DC, USA in the SAM.gov fields; the work is at multiple, globally dispersed locations, with a nominal plan for 5-8 new and 1-4 updated GEP locations on U.S. military and foreign sovereign facilities
- Estimated value
- IDIQ ceiling of $369,000,000 (the most all task orders together may reach)
- How they'll choose
- Best value tradeoff: the Government weighs the factors together and may pay more for a higher-rated offer. Technical, Management and Past Performance combined are more important than Price.
- Offers due
- December 18, 2026, 4:00 PM Eastern (from the version posted Nov 13, 2026; amended since)
- How to submit
- Upload through the Department of Defense Secure Access File Exchange (DoD SAFE, safe.apps.mil) after requesting a SAFE drop-off from the SDA mailbox; Volume VII (cover letter and Standard Form 33 offer) also goes by email to the SDA mailbox
- Page limits
- Volume I Technical: 35 pages; Volume II Program/Project Management: 30 pages; Volume III Past Performance: 12 pages (up to 4 citations, 3 pages each); Volume VI Small Business Participation Commitment Document: 5 pages; Volumes IV Price, V OCI and VII Model Contract: unlimited
What they'll judge offers on
- Technical: (a) understanding of requirements, (b) feasibility and completeness of approach, (c) scalability
- Management: (a) project management, (b) schedule management, (c) subcontractor/teammate and foreign subcontractor management, (d) security and CUI/classified data handling
- Past Performance: recent (within five calendar years of the proposal due date) and relevant work
- Price: total evaluated price, reasonableness, unbalanced pricing and completeness
- Small Business Participation: rated acceptable only if the minimum small business participation is met (least important)
What to include when you submit
- Seven volumes: I Technical Approach, II Program/Project Management, III Past Performance, IV Price, V Organizational Conflict of Interest (OCI) Assessment and Plan, VI Small Business Participation, VII Model Contract/Offer
- Each volume is its own searchable PDF; no .zip files; label each file with the RFP number, prime company name, short title and volume number
- In DoD SAFE check "Encrypt every file" and the pickup-email box, and send the password in a separate email with the required subject line
- Mark Controlled Unclassified Information (CUI: sensitive but unclassified Government information) as required; Volumes I-VII are expected to be unclassified or CUI
- Past performance: no more than 4 citations, 3 pages each, on the Past Performance Questionnaire template; work must be within five calendar years of the proposal due date
- Volume V: written OCI assessment, plus an OCI plan and a guarantee to avoid OCI for the life of the contract if you bid on other Tranche 3 work
- Volume VI: small business participation commitment document (Attachment 7b); large businesses must reach 5 percent of total proposed value, small businesses 50 percent for services
- Volume VII cover letter: proposal firm at least 180 days; statement that the accounting system meets R-DFARS 252.242-7006; exceptions with rationale; assumptions; list of subcontractors; contacts
- Without an approved accounting system, submit Standard Form 1408 and the DCAA pre-award accounting system checklist before proposal submission
- Complete the Personnel & Facilities security template (Attachment 7e) and the price and unpriced basis of estimate templates
- Font no smaller than Times New Roman 12 pt, 1-inch margins, line numbers; one proposal per offeror, no alternates; nonconforming proposals may be rejected
Current contractor
No incumbent is named. The Government plans one IDIQ award, and the contracting officer determined there is a high probability of adequate price competition.
Not in the notice text
- Key documents are attached on SAM.gov but were not read here: the base IDIQ statement of work, Task Order 1 statement of work, technical requirements document and DD254 security form are controlled and sent only on request to the SDA mailbox; the middle of Section L and of the model IDIQ contract was left out.
- The price template, unpriced basis of estimate templates and cost data reporting plan (spreadsheets) are attached but not read.
- The November 13, 2026 update says a new round of questions and answers and a formal amendment will revise the cover letter, Section L, Section M, the Task Order 1 statement of work and the price templates.
- The attachments still show the earlier question deadline of October 2, 2026 and SAFE request date of October 23, 2026; whether these moved is not stated.
- The specific GEP site locations are not named in the documents read; what the contract requires about host-country licenses, local presence, currency and taxes at foreign sites is not stated here.
- The required Cybersecurity Maturity Model Certification (CMMC) level is left blank in the model contract text read.
- Whether the work can be done remotely is not stated.
More to check before you bid
- The AI summary also reads the notice as naming requirements:
- The AI summary's reading of the notice and its attachments says a bidder needs: DD 2345 export approval. The summary's list is under Who can bid; check it in the notice before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 13, 2026
- Notice type
- Solicitation
- Office
- FA2401 Space Development Agency SDA, Chantilly, VA
- Product/service code
- AC13 · National Defense R&D Services; Department of Defense – Military; Experimental Development
- Business type
- Engineering, architecture & research (FedReady's grouping, from NAICS 541715)
- Versions
9 versions have been posted, newest first.
- Nov 19, 2026 · Amendment 0008Due Dec 18, 2026
- Nov 13, 2026 · Amendment 0007 (this version)Due Dec 18, 2026 (changed)
- Nov 6, 2026 · Amendment 0006Due Nov 23, 2026
- Nov 5, 2026 · Amendment 0005Due Nov 23, 2026
- Oct 27, 2026 · Amendment 0004Due Nov 23, 2026
- Oct 13, 2026 · Amendment 0003Due Nov 23, 2026 (changed)
- Sep 29, 2026 · Amendment 0002Due Nov 2, 2026
- Sep 25, 2026 · Amendment 0001Due Nov 2, 2026
- Sep 18, 2026 · SolicitationDue Nov 2, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- SYSTEM DELTA 84 (SYD 84/MT) MEDIUM EARTH ORBIT MISSILE WARNING / MISSILE TRACKING EPOCH 3 and EPOCH 4, REQUEST FOR INFORMATION (RFI)A sources sought request for information (RFI) from Space Systems Command (SSC), Space Force, on building the Medium Earth Orbit Missile Warning/Missile Tracking Epochs 3 and 4…
- Tracking Layer Tranche 4 On-orbit Demonstrations and Operations Request for Information
- Missile Defense Agency - Nimble Options for Buying Layered Effects (NOBLE) AnnouncementMissile Defense Agency (MDA) umbrella announcement HQ0860-25-S-0001, Nimble Options for Buying Layered Effects (NOBLE), is not a bid opportunity itself: no white papers,…
- Mission System R and D Support for Blossom Point Tracking Facility (BPTF)
- Resilient Open & Agile Avionics System & Technology Development (ROAASTD)The Air Force Research Laboratory's Sensors Directorate (Wright-Patterson AFB, Ohio) wants research and development on resilient, open-standards, agile avionics and…