Presolicitation
WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
Department of Transportation · Federal Highway Administration
AI summaryOnly the six firms holding the Yellowstone/Grand Teton multiple award task order contract (MATOC, a contract held by a pre-selected group of firms that compete for individual jobs) can bid on this task order. The Federal Highway Administration's Western Federal Lands Division plans to rebuild 0.7 miles of Grand Loop Road in Yellowstone National Park, Wyoming, plus a parking lot. The estimated price range is $45,000,000 to $55,000,000; this presolicitation gives no response date, and other firms can look for subcontract work. More in the summary
Advance notice of a coming solicitation, not a bid yet. If it asks for capability statements, sending one is free and puts you on Federal Highway Administration's list before the solicitation is posted. See the contact
AI summary Beta
This summary may miss requirements: 1 of 5 attachments weren't read (yell10-24_Preliminary Plans.pdf). Check the attachments on SAM.gov.
Only the six firms holding the Yellowstone/Grand Teton multiple award task order contract (MATOC, a contract held by a pre-selected group of firms that compete for individual jobs) can bid on this task order. The Federal Highway Administration's Western Federal Lands Division plans to rebuild 0.7 miles of Grand Loop Road in Yellowstone National Park, Wyoming, plus a parking lot. The estimated price range is $45,000,000 to $55,000,000; this presolicitation gives no response date, and other firms can look for subcontract work.
Who can bid
- Limited competition: only the six MATOC holders can bid, not every business that meets the set-aside.
- Hold one of the six Yellowstone/Grand Teton MATOC contracts. The request for proposals will go only to these prime contractors; other firms can work as subcontractors.
Things to watch (4)
From the version posted Oct 20, 2026.
- Serious: Only the six MATOC holders can bid. Proposals are accepted only from H-K Contractors, M.A. Deatley Construction, Missouri River Contractors, Oftedal Construction, Riverside Contracting and Sundt Construction; any other business can only seek subcontract work.
- Worth checking: No site visit scheduled; viewing the project in fall is encouraged. Offerors are encouraged to view the project in fall as conditions permit, and the letter says access may not be available after November 1, 2026. No Federal Highway Administration staff will give show-me tours.
- Minor: No offer due date yet; solicitation expected Winter 2026/2027. This is a presolicitation with no response date. The request for proposals, specifications and plans are to be posted later; use the follow button on SAM.gov to be notified.
Show all 4Show fewer
- Minor: Two bid schedules; only one is awarded. Schedule A uses a 22-foot pavement width and Schedule B a 30-foot width, and Option Z adds more work, so bidders need to price each as the solicitation sets out.
Read from the notice and 4 attachments. 1 of 5 not read. Show which files.
- QA_10-20-2026.pdf (read)
- QA_10-05-2026.pdf (read)
- PROJECT DESCRIPTION_WY NP YELL 10(24).pdf (read)
- Prelim Letter_WY NP YELL 10(24).pdf (read)
- yell10-24_Preliminary Plans.pdf: not read (it couldn't be opened): open it on SAM.gov
Full summary
What they want
- 4R roadway reconstruction of 0.7 miles of Grand Loop Road, Norris to Golden Gate, Phase 3, and a parking lot
- Excavation, rock blasting, rock scaling, rock bolts and dowels, and embankment
- Retaining walls, including mechanically stabilized earth walls, and stone masonry
- Drainage improvements, utility relocation, waterline construction, and curb and gutter
- Parking area and roadside improvements, boardwalk construction and obliteration of old roadway
- Base aggregate, asphalt paving, striping and signage
- Option Z: grading, base, pavement, major drainage and a steel boardwalk at Rustic Falls Boardwalk and the Osprey Pit Road Box Culvert
- Contract type
- Firm-fixed-price task order under the Yellowstone/Grand Teton MATOC. Two bid schedules (A and B) and one option (Option Z); one schedule will be awarded.
- Period of performance
- Notice to proceed is being planned for May 2027. Tentative completion date: Fall 2028.
- Place of performance
- Yellowstone National Park, Park County, Wyoming: Grand Loop Road, 0.4 miles SW of Mammoth, WY; the letter also names the Norris Geyser Basin parking lot.
- Estimated value
- $45,000,000 to $55,000,000 (estimated price range in the notice)
- Contract vehicle
- Yellowstone, Grand Teton, and Surrounding Area Multiple Award Task Order Contract (MATOC). Holders: H-K Contractors, Inc.; M.A. Deatley Construction, Inc.; Missouri River Contractors, LLC; Oftedal Construction, Inc.; Riverside Contracting Inc; Sundt Construction, Inc.
Not in the notice text
- The solicitation itself is not posted yet, so the response due date, evaluation factors, submission instructions and exact completion date are not known.
- Attached but not read: yell10-24_Preliminary Plans.pdf (too large to read here).
- Whether a Davis-Bacon wage determination applies is not stated; construction wage rules will come with the solicitation.
- Bonding, insurance and other requirements for task order bidders are not stated.
- Slope scaling is expected to be priced by hours, and quantities for temporary traffic control will be given in the solicitation; the offer schedule is not yet developed.
Eligibility and how to respond
- No set-aside, but the notice names requirements you must meet before you can bid:
- Limited competition: only the six MATOC holders can bid.
- How and where to submit is in the notice text and its attachments on SAM.gov.
- Construction contracts over $2,000 pay at least the local Davis-Bacon wage rates, from the wage determination in the solicitation. Price your labor from it: How to price a government contract, and how Davis-Bacon differs from the Service Contract Act.
Notice details
- Posted
- Oct 20, 2026
- Notice type
- Presolicitation
- Office
- 690567 Western Federal Lands Div, Vancouver, WA
- Product/service code
- Y1LB · Construction of Highways, Roads, Streets, Bridges, and Railways
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237310)
- Versions
3 versions have been posted, newest first.
- Oct 20, 2026 · Amendment 0002 (this version)No date on SAM.gov
- Oct 5, 2026 · Amendment 0001No date on SAM.gov
- Sep 23, 2026 · PresolicitationNo date on SAM.gov
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- FY27 NRM - Correct Mather Loop Road and Install Speed Bumps
- ND NP THRO 204(1) Buck Hill RoadThe Federal Highway Administration's Central Federal Lands Highway Division wants Buck Hill Road (Route 204) rebuilt in Theodore Roosevelt National Park near Medora, ND: about…
- UT NP ARCH 100(2) Bridges on Delicate Arch RoadThe Federal Highway Administration's Central Federal Lands Division wants three new 100-foot concrete bridges and road reconstruction on Delicate Arch Road in Arches National…
- YELL 338223 - Bridge PreservationThe National Park Service (NPS), for Yellowstone National Park, wants a contractor to repair and preserve three bridges in Wyoming: Lava Creek, Thumb Creek and Unnamed Creek.
- Access Road Repair National Elk RefugeThe U.S. Fish & Wildlife Service has posted a presolicitation (an early notice; the full solicitation comes later) to repair the Access Road at the National Elk Refuge in…