Presolicitation
WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
Department of Transportation · Federal Highway Administration · Sol. 69056726R000020
No deadline
AI summary Beta
Some details are in the notice's attachments, which this summary didn't read. Check the attachments on SAM.gov.
The Federal Highway Administration (Western Federal Lands) plans to solicit a road reconstruction on the Grand Loop Road between Norris and Golden Gate, Yellowstone National Park, WY. It is a firm-fixed-price task order and the estimate is $45 million to $55 million. The notice says the work will go only to Yellowstone/Grand Teton MATOC contractors.
Watch out for
- Limited to MATOC holders. Only firms already on the Yellowstone/Grand Teton MATOC are being solicited, so other bidders can only act as subcontractors.
This project will be solicited to the Yellowstone/Grand Teton MATOC contractors.
- Large, complex job. Blasting, rock scaling, retaining walls and stone masonry in a national park add technical difficulty.
Read from the notice text only.
Full brief
What they want
- 4R roadway reconstruction over 0.7 miles plus a parking lot
- Excavation, blasting, rock scaling and embankment
- Drainage, parking area and roadside improvements
- Retaining walls, stone masonry and boardwalk construction
- Utility relocation and waterline construction
- Base aggregate, asphalt paving, concrete curb and gutter, striping and signage
- Contract type
- Firm-Fixed-Price Task Order Contract
- Period of performance
- Tentative completion date Fall 2028; solicitation anticipated Winter 2026/2027
- Place of performance
- 0.4 miles SW of Mammoth, Yellowstone National Park, WY, USA
- Estimated value
- Between $45,000,000 and $55,000,000 (estimated price range)
- Contract vehicle
- Yellowstone/Grand Teton MATOC (multiple award task order contract)
- How to submit
- Solicitation (RFP with specifications and plans) will be posted on SAM.gov; use the follow button on the opportunity page for notification
What to include when you submit
- Preliminary plans and a letter with project information are posted as attachments
You must have
- Must be a Yellowstone/Grand Teton MATOC contractor to receive the solicitation
This project will be solicited to the Yellowstone/Grand Teton MATOC contractors.
Not in the notice text
- Proposal due date (none given)
- Evaluation method and factors
- Project details in the attached Project Description, preliminary plans and Q&A
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Posted
- Oct 5, 2026
- Notice type
- Presolicitation
- Solicitation
- 69056726R000020
- Agency
- Department of Transportation · Federal Highway Administration
- Office
- 690567 Western Federal Lands Div
- NAICS
- 237310
- Product/service code
- Y1LB
- Business type
- Construction & renovation
- Place of performance
- Yellowstone National Park, WY
- Contracting contact
- Contracts G. Officewfl.contracts@dot.gov3606197520
- Versions
- 2 (amended since first posted)
Full notice text from SAM.gov
Update 10/5/2026: QA_10-05-2026.pdf posted to attachments. PROJECT: WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3 LOCATION: 0.4 miles SW of Mammoth, WY WORK: The work consists of 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, draining improvements, parking area improvements, roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, boardwalk construction, obliteration, base aggregate, asphalt paving, concrete curb and gutter, striping, and signage. See “Project Description” posted under Attachments for additional details. LENGTH: 0.7 miles and parking lot TENTATIVE COMPLETION DATE: Fall 2028 CONTRACT TYPE: Firm-Fixed-Price Task Order Contract ESTIMATED PRICE RANGE: Between $ 45,000,000 and $55,000,000 . INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. NOTICE OF SUBCONTRACTING OPPORTUNITY This project will be solicited to the Yellowstone/Grand Teton MATOC contractors. Information on the MATOC contractors may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/yellowstone-grand-teton (linked under Attachments/Links) This project is anticipated to be solicited Winter 2026/2027 PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.
Similar open opportunities
- ND OMAD 2025(1) Minuteman Missile AccessThe Federal Highway Administration's Central Federal Lands Division plans a small business set-aside road project in North Dakota (Minot area) to recondition about 50 miles of…
- CO OMAD 300(71) Minuteman Missile AccessThe Federal Highway Administration (Central Federal Lands) plans to hire a small business to recondition up to 85.75 miles of gravel Minuteman Missile access roads and replace up…
- AIRCRAFT PARKING APRON, RAAF TINDAL, AUSTRALIANAVFAC Pacific is asking construction firms to show they can build an aircraft parking apron at RAAF Base Tindal in Australia.
- Natchez Trace Parkway Project MS NP NATR 3F26The Federal Highway Administration's Eastern Federal Lands Division is taking sealed bids to resurface a section of the Natchez Trace Parkway in Chickasaw County, Mississippi.
- CO NP ROMO 407(1) Holzwarth CulvertThe Federal Highway Administration's Central Federal Lands Division is soliciting a contract to replace the Holzwarth Culvert with a steel girder bridge in Rocky Mountain…