CO NP ROMO 407(1) Holzwarth Culvert
Department of Transportation · Federal Highway Administration · Sol. 6982AF27B000004
Due in 15 days
AI summary Beta
Some details are in the notice's attachments, which this summary didn't read. Check the attachments on SAM.gov.
The Federal Highway Administration's Central Federal Lands Division is soliciting a contract to replace the Holzwarth Culvert with a steel girder bridge in Rocky Mountain National Park, near Grand Lake, Colorado. Award is expected in December 2026 with completion by November 2027. The estimated cost is $700,000 to $2,000,000.
Watch out for
- Difficult site access. The site is reached on foot past a locked gate along a narrow road, and no construction access is allowed more than 100 feet west of the bridge, which complicates deliveries and equipment.
The Holzwarth Culvert Access Road is approximately 13’ wide with tight turns.
- Sensitive environmental and historic setting. Work is in a national park with sensitive resources and a historic site, so extra care and constraints are likely.
Temporary widening will be necessary to prevent truck off tracking on to sensitive environmental resources.
- High altitude and short season. Work at 8,900 feet elevation with a stream diversion may be affected by weather.
Read from the notice text only.
Full brief
What they want
- Remove the existing six-barrel culvert
- Build a new steel girder bridge with cast-in-place concrete deck, abutments and micropiles
- Temporary stream diversion and riprap
- New aggregate roadway surfacing
- Relocate an existing electrical line
- Relocate historic head gates into a new concrete slab
- Period of performance
- Notice to proceed December 2026; contract completion November 2027
- Place of performance
- Rocky Mountain National Park, near Grand Lake, CO
- Estimated value
- Between $700,000 and $2,000,000
- Offers due
- 2026-10-20T14:00:00-06:00
Not in the notice text
- Contract type
- Evaluation method (the solicitation number suggests a sealed bid, but the text does not say)
- Submission method
- Bonding requirements
- Full plans and specifications (likely in attachments)
Is this a fit for your business?
Create a free accountFedReady checks notices like this against your business profile, tracks deadlines, and alerts you to new matches. Creating an account is free.
Key facts
- Response due
- Oct 20, 2026, 8:00 PM UTC
- Posted
- Sep 16, 2026
- Notice type
- Solicitation
- Solicitation
- 6982AF27B000004
- Agency
- Department of Transportation · Federal Highway Administration
- Office
- 6982AF Central Federal Lands Divisi
- Set-aside
- No Set aside used
- NAICS
- 237310
- Product/service code
- Y1LB
- Business type
- Construction & renovation
- Place of performance
- Grand Lake, CO, 80447
- Contracting contact
- Denise MartinezCFLAcquisitions@dot.gov
Full notice text from SAM.gov
SOLICITATION ID: 6982AF27B000004 PROJECT NUMBER: CO FTNP ROMO 407(1) PROJECT NAME: Holzwarth Culvert PROJECT DESCRIPTION: This project will replace the deficient Holzwarth Culvert (Structure No. 1520-029S), a six-barrel corrugated metal arch pipe culvert on the Holzwarth Access Road with a steel girder bridge. Located in Rocky Mountain National Park, approximately nine miles north of Grand Lake, CO, along US HWY 34 at an elevation of 8,900 feet, the culvert conveys flow from the Colorado River and provides access to the Holzwarth Historic Site. The purpose of this project is to prevent future roadway damage and flooding while maintaining access to employee housing, the historic site, and National Park Service and Forest Service recreation opportunities. SCOPE OF THE WORK: The project will consist of removal of the existing six barrel culvert and construction of a new steel girder bridge with a cast in place concrete deck. New bridge abutments and micropiles. Temporary stream diversion and riprap. New aggregate roadway surfacing. Relocation of an existing electrical line. Relocation of existing historic head gates into a new concrete slab. The site is accessible on foot a quarter mile past the locked gate at the south end of the Holzwarth Historic Site Parking Lot and along the Holzwarth Culvert Access Road. The Holzwarth Culvert Access Road is approximately 13’ wide with tight turns. Temporary widening will be necessary to prevent truck off tracking on to sensitive environmental resources. A temporary truck turnaround will also be necessary as no construction access is allowed more than 100’ west of the bridge. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 EACH 30202-2000 Roadway Aggregate, Method 2: 120 TON 55504-0000 Prefabricated Steel Bridge (10’ wide x 48’ long modular steel vehicular bridge): 1 LPSM 56701-0000 Micropile (8.68” dia.): 180 LNFT 62801-0000 Temporary Stream Diversion: 1 LPSM ANTICIPATED SCHEDULE: Advertisement – September 2026 Award – December 2026 NTP – December 2026 Contract Completion – November 2027 ESTIMATED COST RANGE: Total estimated cost between $700,000 and $2,000,000.
Similar open opportunities
- ND OMAD 2025(1) Minuteman Missile AccessThe Federal Highway Administration's Central Federal Lands Division plans a small business set-aside road project in North Dakota (Minot area) to recondition about 50 miles of…
- CO OMAD 300(71) Minuteman Missile AccessThe Federal Highway Administration (Central Federal Lands) plans to hire a small business to recondition up to 85.75 miles of gravel Minuteman Missile access roads and replace up…
- AIRCRAFT PARKING APRON, RAAF TINDAL, AUSTRALIANAVFAC Pacific is asking construction firms to show they can build an aircraft parking apron at RAAF Base Tindal in Australia.
- Natchez Trace Parkway Project MS NP NATR 3F26The Federal Highway Administration's Eastern Federal Lands Division is taking sealed bids to resurface a section of the Natchez Trace Parkway in Chickasaw County, Mississippi.
- ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls RoadThe Federal Highway Administration's Western Federal Lands Division is requesting task order proposals for a road project, the Western Heritage Byway - Swan Falls Road, near…