Sources Sought
Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support
Department of Defense · Department of the Air Force
Response due Nov 27, 2026 · Homestead, FL
Market research, not a bid. Replying is free and tells Department of the Air Force who could do this work. Send a short reply to the contracting contact; no price is needed. See the contact
AI summary Beta
Summary of the version posted Nov 18, 2026. The notice was amended Nov 23, 2026. The due date moved from Nov 26, 2026 to Nov 27, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 1 of 4 attachments weren't read (Attachment 2 Outdoor Fitness Facility BOM Template.xlsx). Check the attachments on SAM.gov.
This is a sources sought notice (market research, not a solicitation): the Air Force's 482d Contracting Flight wants capability statements, due November 26, 2026, 5:00 PM EST, for the Outdoor Fitness Facility at Building 389, Homestead Air Reserve Base, FL (notice HARBSS-2027-01). A future buy would have the contractor supply and deliver materials and a pre-engineered building, install a steel picket fence, and install lightning protection only if needed, while Air Force RED HORSE crews do the rest of the building work.
Who can bid (6)
- SAM registration is not required to respond to this sources sought, but a firm that bids on a later solicitation must be registered in the System for Award Management (SAM.gov)
- Pre-engineered building with a current Miami-Dade Notice of Acceptance and a minimum 20-year material warranty
- Shop drawings digitally signed and sealed by a Professional Engineer
Show all 6Show fewer
- English-fluent site superintendent on the contractor's payroll, on site at all times during contractor installation work
- Ability to work on an active military installation, with base access, identification and security rules
- Up to three recent similar projects completed within the past five years
How to submit: Email to nika.salemi.2@us.af.mil, due November 26, 2026, 5:00 PM EST. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
- Worth checking: Sources sought notice, not a solicitation. Nothing can be bid on yet. A capability statement helps the Government decide on contract type and a possible small-business set-aside, and a later solicitation is announced separately.
- Worth checking: Bill of materials is attached but not read. The bill of materials (Attachment 2) lists the quantities, equipment rental periods and materials to price. It was not read here; check it on SAM.gov.
- Worth checking: Engineered building with high-wind and Miami-Dade approval requirements. The building package must be designed for high-velocity wind and carry a current Miami-Dade Notice of Acceptance, which limits which manufacturers qualify.
Show all 8Show fewer
- Worth checking: Lightning protection may fall to the contractor. If the building cannot come with built-in lightning protection, the contractor installs it, runs ground tests and pays for an independent third-party inspector.
- Worth checking: Construction equipment must be supplied and fueled on site. The contractor furnishes equipment such as a telehandler forklift, skid loaders and a dump truck, delivered fueled and ready to run.
- Minor: Excavation permits take three weeks. Contractor installation work that needs excavation requires a permit requested at least three weeks before digging starts.
- Minor: Base access needs personal details for every worker. The contractor sends names, dates of birth, Social Security numbers and citizenship status, and drivers need REAL ID licenses; the base has up to 72 hours to process the request. From Attachment 1 KYJM19-9003 Outdoor Fitness SOW Red Horse Project 12 Nov 2026.pdf
- Minor: Set-aside not stated. SAM.gov shows no set-aside; the notice says responses will help decide whether to set the buy aside for small businesses.
Read from the notice and 3 attachments. 1 of 4 not read. Show which files.
- Attachment 1 KYJM19-9003 Outdoor Fitness SOW Red Horse Project 12 Nov 2026.pdf (read)
- Attachment 3 Spec 26 41 01.00 10 Lightning Protection System.pdf (read)
- Attachment 4 Outdoor Fitness Building B-389 Set of Drawings.pdf (read)
- Attachment 2 Outdoor Fitness Facility BOM Template.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- Buy and deliver everything in the Government's bill of materials (BOM, Attachment 2): flooring, masonry, electrical items, fans, lighting, concrete and base course
- Supply the pre-engineered building (PEB) package with shop drawings signed and sealed by a Professional Engineer; RED HORSE crews will build it
- Coordinate concrete-truck deliveries and supply the listed construction equipment, fueled and ready at the site
- Install a new steel picket fence with doors around the structure, and restore disturbed ground with St. Augustine sod
- Install a copper lightning protection system, with grounding tests and independent third-party certification, only if the PEB cannot include one
- Send material submittals (AF Form 3000), a material warranty plan and a fence warranty (material and labor) for written approval before ordering anything
- Place of performance
- Homestead Air Reserve Base, Florida
- Estimated value
- Not stated
- Offers due
- November 26, 2026, 5:00 PM EST (from the version posted Nov 18, 2026; amended since)
- How to submit
- Email to nika.salemi.2@us.af.mil
- Page limits
- Capability statement: no more than 10 pages, excluding product literature and certifications
What to include when you submit
- Use the subject line: Sources Sought Response - Outdoor Fitness Facility B-389 - [Company Name], then Email X of X (the number of this email and the total)
- Company information: legal name, Unique Entity Identifier (UEI), CAGE code if assigned, SAM registration status and expiration date, address, point of contact, and any contract vehicle the Government could use
- Business size under NAICS 236220 and status as small, small disadvantaged, 8(a), HUBZone, service-disabled veteran-owned, veteran-owned, women-owned or economically disadvantaged women-owned
- Technical capability: the full BOM, a PEB meeting the engineering, wind, warranty and Miami-Dade Notice of Acceptance rules, sealed shop drawings, equipment, fence installation, and lightning protection if applicable
- Relevant experience: up to three recent projects of similar size and complexity completed within the past five years, with customer, location, period, scope, contract value and a customer contact
- Schedule and supply chain: lead times for the PEB and major materials, long-lead items, concrete coordination and a suggested phasing approach
- Say whether the supplies are commercial products, and offer any alternatives or specification changes, including any requirement you think limits competition
- Give a nonbinding rough-order-of-magnitude price estimate split into the PEB package, materials, equipment, fence and site restoration, conditional lightning protection, and other big cost drivers
- Do not send classified information; clearly mark any proprietary parts
Not in the notice text
- Attached but not read: the bill of materials (Attachment 2, a spreadsheet). Quantities, equipment rental periods and any value figures are there.
- Contract type, period of performance, delivery schedule and the Government's estimated value are not stated.
- Construction (NAICS 236220): no site visit is mentioned, and the notice does not say whether a Davis-Bacon wage determination (federal construction wage rates) applies.
- Whether the future buy will be set aside for small businesses, and for which program
Notice details
Notice type, codes, versions and files
- Posted
- Nov 23, 2026
- Notice type
- Sources Sought
- Office
- FA6648 482 LSS LGC, Homestead AFB, FL
- Product/service code
- 5670 · Building Components, Prefabricated
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
4 versions have been posted, newest first.
- Nov 23, 2026 · Amendment 0003 (this version)Due Nov 27, 2026 (changed)
- Nov 18, 2026 · Amendment 0002Due Nov 26, 2026
- Nov 12, 2026 · Amendment 0001Due Nov 26, 2026
- Nov 12, 2026 · Sources SoughtDue Nov 26, 2026
- Attachments
Before you respond
Terms on this notice: Sources sought notice
Full notice text from SAM.gov
Similar open opportunities
- Design-Build Renovation of Building 164, Outdoor Recreation Center, Homestead Air Reserve Base, FloridaThe Department of the Air Force (contracting office FA6648 482 LSS LGC) wants a firm-fixed-price design-build contractor to renovate the Outdoor Recreation Center, Building 164,…
- Design-Build-to-Budget – Fort McCoy Indoor Multipurpose Athletic Facility - Army Combat Fitness TestingAdvance notice of a two-phase design-build-to-budget RFP (W912QR27RA005): Phase I proposals are open to all firms, and at most three are invited to Phase II. The Army Corps of…