Solicitation
FINAL RFP - Landing Gear Collaborative Supply Chain Integration II
Department of Defense · Defense Logistics Agency
Small business set-aside · Not tied to one site and 1 more place (from the AI summary)
A newer version of this notice was posted Nov 23, 2026. See the latest version.
AI summary Beta
Summary of the version posted Aug 19, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 7 of 19 attachments weren't read (Attachment17CERTIFICATION_FOR_THE_USE_OF_BOEING_TECHNICAL_DATA.pdf, Attachment18Team_Roles_and_Responsibilities.xlsx and 5 more). Check the attachments on SAM.gov.
DLA Aviation at Ogden (Hill AFB, Utah) wants one small business to run the supply chain for about 2,800 competitive landing gear spare parts for U.S. Air Force aircraft. The contractor buys raw material and forgings, oversees subcontract manufacturers and quality, and delivers parts on time. It is a single-award, firm-fixed-price IDIQ contract for up to 10 years (5-year base plus one 5-year option), awarded on best value tradeoff.
Who can bid (7)
- 100% small business set-aside under NAICS 336413; the offeror must be certified small for this code From SPRHA126R1003.pdf
- Current AS9100 quality certification From Attachment3InstructionsToOfferors_SectionL.pdf
- Active SAM.gov registration with annual representations and certifications completed From Attachment3InstructionsToOfferors_SectionL.pdf
Show all 7Show fewer
- Key personnel (resumes and workload analysis) and a full-time program manager who knows landing gear manufacturing, supply chain management and the FAR From Attachment2TRD.pdf
- Proof of adequate financial resources From Attachment4EvaluationCriteria_SectionM.pdf
- Cybersecurity protections for controlled information (NIST SP 800-171 system security plan) and disclosure of any foreign ownership, control or influence From Attachment2TRD.pdf
- Ability to receive orders electronically (EDI) and register in DIBBS to get award notices From Attachment2TRD.pdf
How to submit: Electronically through DoD SAFE. Email the Contracting Officer (Nathan.Flinders@dla.mil) to request a drop-off link, no sooner than 14 days and no later than 72 hours before the due date; 25 file limit per link.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
- Serious: Technically demanding, safety-critical work. The parts include Critical Safety Items and complex forgings with long lead times, and the prime must show it can manage forging sources, quality escapes and hydrogen embrittlement scenarios; this is hard for a small shop without landing gear experience. From SPRHA126R1003.pdf
- Serious: Part data is controlled and mailed. Bid sets for each part are export-controlled and only sent on a removable drive after you sign data agreements, which adds time before you can price.
- Serious: Large, detailed proposal with strict page limits. Four volumes, including a 175 page technical volume, a pricing worksheet for thousands of parts, past performance questionnaires, and a risk plan; an incomplete package can be dropped. From Attachment3InstructionsToOfferors_SectionL.pdf
Show all 8Show fewer
- Serious: Prime carries purchasing and delivery risk. The contractor must buy raw material and forgings directly and oversee every subcontractor, while prices are locked for each year and you must hold your offer for 365 days. From Attachment2TRD.pdf
- Worth checking: On-time delivery targets with money at stake. Targets are 95% for DLA parts and 90% for Air Force parts, and DLA consumable orders carry incentive and disincentive adjustments tied to on-time delivery. From Attachment2TRD.pdf
- Worth checking: Prices must be held for a year. Your prices stay firm for 365 days after the due date, which ties up pricing in a volatile forging and raw material market. From SPRHA126R1003.pdf
- Worth checking: Many documents need access requests. The price worksheet, data requirements list, sample part portfolios and quality matrix are controlled and not open on SAM.gov, so you cannot see all requirements without requesting access.
- Minor: Government may not award. The Government says it may award no contract at all and will not pay proposal costs, so the big proposal effort is at risk.
Read from the notice and 12 attachments. 7 of 19 not read. Show which files.
- Attachment3InstructionsToOfferors_SectionL.pdf (read)
- Attachment4EvaluationCriteria_SectionM.pdf (read)
- SPRHA126R1003.pdf (read)
- Attachment2TRD.pdf (read)
- Attachment8_417GUEA_Checklist.pdf (read)
- Attachment9LandingGearRequirementsDocument_LGRD.pdf (read)
- Attachment10LGCSCI2BidsetAgreement.pdf (read)
- Attachment11PastPerformanceClientAuthLtr.docx (read)
- Attachment12PastPerformanceConsentLetter.docx (read)
- Attachment13PastPerformanceInformationSheet.docx (read)
- Attachment14PastPerformanceQuestionnaire.docx (read)
- Attachment16CERTIFICATE_OF_DESTRUCTION_OR_RETURN.pdf (read)
- Attachment17CERTIFICATION_FOR_THE_USE_OF_BOEING_TECHNICAL_DATA.pdf: not summarized: open it on SAM.gov
- Attachment18Team_Roles_and_Responsibilities.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attachment1TEPWorksheet.xlsx: not read (access is restricted): request it on SAM.gov
- Attachment5_AllCDRLs_and_DIDs.pdf: not read (access is restricted): request it on SAM.gov
- Attachment6_C5NLG_OuterCylinder1620004035249Portfolio.pdf: not read (access is restricted): request it on SAM.gov
- Attachment7_F16MLG_OuterPistonAssembly1620014420167Portfolio.pdf: not read (access is restricted): request it on SAM.gov
- Attachment15QualityAndPackagingMatrix.xlsx: not read (access is restricted): request it on SAM.gov
Full summary
What they want
- Supply about 2,800 landing gear spare parts (Air Force depot level repairables and DLA consumables), from simple items to complex forged parts with long lead times
- Manage the supply chain start to finish: buy raw material and forgings, oversee subcontractors, engineering, quality and delivery
- Hit 95% on-time delivery for DLA-managed parts and 90% for Air Force-managed parts
- Cut production lead times across the supply chain by at least 25%
- Handle strategic raw material buying, forging die management and obsolescence (DMSMS) management
- Qualify new manufacturing sources and perform first article testing
- Provide a full-time program manager, an ERP/tracking system the Government can see in real time, and a supply chain risk management plan
- Take orders by EDI (DLA consumables) and DD Form 1155 (Air Force items), with twice-a-year Air Force buy cycles
- Contract type
- Single-award IDIQ, firm-fixed-price with economic price adjustment; delivery orders issued under the base contract
- Period of performance
- 5-year base period plus one 5-year option, 10 years maximum; at least 90 days to ramp up regardless of award date
- Place of performance
- Not tied to one site; contractor and its suppliers do the work and ship to DLA distribution depots named on each order. Contract is administered by DLA at Hill AFB, Utah.
- Estimated value
- No total value stated. Contract minimum guarantee of $10,000,000 over the 5-year base; maximum $10,000,000 per single order; minimum $1,000 per single order.
- How they'll choose
- Best value tradeoff. Technical is most important, then Price, then Past Performance; non-price factors combined are significantly more important than price. An Unacceptable rating on any technical sub-factor makes a proposal unawardable.
- Offers due
- 1 March 2027, 5:00 PM (the form does not write a time zone; the SAM.gov header shows -07:00). Past performance volume is requested 30 days earlier but is not required early. (from the version posted Aug 19, 2026; amended since)
- How to submit
- Electronically through DoD SAFE. Email the Contracting Officer (Nathan.Flinders@dla.mil) to request a drop-off link, no sooner than 14 days and no later than 72 hours before the due date; 25 file limit per link.
- Page limits
- Technical volume 175 pages; Past Performance 40 pages; Price and Contract Documentation unlimited (pricing assumptions limited to 20 pages); supply chain risk plan 10 pages. Digital copies only.
What they'll judge offers on
- Factor One, Technical: sub-factors in descending order are Engineering, Program Management, and Order Fulfillment (rated by approach and by risk)
- Factor Two, Price: completeness, reasonableness, balance, and Total Evaluated Price from the TEP worksheet
- Factor Three, Past Performance: recent (under 5 years) and relevant work, rated Acceptable or Unacceptable (Unknown confidence if none)
What to include when you submit
- Four volumes: I Technical, II Price, III Past Performance, IV Contract Documentation (the instructions number them inconsistently)
- Times New Roman, at least 12-point, 8.5 x 11, single spaced, 1 inch top and bottom margins and 3/4 inch side margins; each page carries the source selection legend
- Price Volume: complete the Excel TEP worksheet (Attachment 1) with annual firm fixed prices for every part (up to four quantity ranges), production lead times, first article prices and minimum buy quantities, all fully burdened
- Signed SF 1447 with 365 days for acceptance; no prices in Section B
- Exceptions to any term must be listed in a table with rationale
- Include evidence of adequate financial resources, monthly delivery capacity per part (Attachment 23), and a 10 page supply chain risk management plan (cybersecurity, continuity of operations, foreign influence)
- Past performance: up to 10 information sheets (Attachment 13), consent letters from subs and teaming partners (Attachment 12), client authorization letters for commercial work (Attachment 11), a citation matrix and the Team Roles and Responsibilities worksheet (Attachment 18); references send questionnaires (Attachment 14) straight to the Contracting Officer
- To get the part data (bid sets), email the Contracting Officer a mailing address with signed Attachment 17 (Boeing technical data certificate) and Attachment 10 (bid-set agreement)
- Only the Contracting Officer may be contacted; sign and return the front page of any amendment
Not in the notice text
- Total contract value; only a $10,000,000 minimum guarantee and a $10,000,000 per-order maximum are stated
- The full list of parts, quantities and notional demand (in the controlled TEP worksheet, Attachment 1)
- Contract data requirements and quality and packaging requirements (Attachments 5 and 15 are controlled)
- Details of the two sample parts (C-5 outer cylinder and F-16 outer piston assembly) that the technical volume must address
- The middle of the main RFP (contract clauses and special terms) and the middle of the technical requirements document were not read (it may be an attached file the AI skipped; check SAM.gov) in the text provided
- Team roles worksheet (Attachment 18), monthly delivery capacity sheet (Attachment 23) and the Boeing technical data certificate (Attachment 17) were not readable
- Deadline for questions and any amendment dates
- What access approval is needed to receive the bid sets
Notice details
Notice type, codes, versions and files
- Posted
- Aug 19, 2026
- Notice type
- Solicitation
- Office
- DLA Aviation at Ogden, UT, Hill Air Force Base, UT
- Product/service code
- 1620 · Aircraft Landing Gear Components
- Business type
- Aircraft, ship & vehicle parts (FedReady's grouping, from NAICS 336413)
- Versions
4 versions have been posted, newest first.
- Nov 23, 2026 · Amendment 0003Due Mar 1, 2027
- Oct 29, 2026 · Amendment 0002Due Mar 1, 2027
- Aug 19, 2026 · Amendment 0001 (this version)Due Mar 1, 2027
- Aug 19, 2026 · SolicitationDue Mar 1, 2027
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Landing Gear Wear Pad / 40A, UH-60A, UH-60L, HH/UH-60M, UH-60V Black Hawk HelicopterOnly small businesses can bid on solicitation SPE4A727R0065-Synopsis from the Defense Logistics Agency (DLA) Aviation: a five-year indefinite quantity contract (IQC) for Black…
- Aircraft, Hercules, C-130; Guide Shoe Assembly, Landing GearThe Defense Logistics Agency (DLA) Aviation plans a request for proposal for the C-130 Hercules landing gear guide shoe assembly (NSN 1620-010982748), set aside for small…
- W58RGZ-26-B-0004 Amendment 0005 OVERHAUL/UPGRADE LANDING GEAR FIXED
- 417 SCMS Landing Gear Depot Support (LGDS)The Defense Logistics Agency (DLA) Aviation office at Ogden, Utah and the 417th Landing Gear Supply Chain Management Squadron are asking industry for feedback in a sources sought…
- Flap, Wing LandingDLA Aviation at Philadelphia is asking for quotes on a wing landing flap (a critical safety item).