Solicitation
DRAFT RFP - Landing Gear Collaborative Supply Chain Integration II
Department of Defense · Defense Logistics Agency
Small business set-aside · USA (notice header). Contract administered by DLA Weapons Support at Hill AFB,… and 1 more place (from the AI summary)
A newer version of this notice was posted Nov 23, 2026. See the latest version.
AI summary Beta
Summary of the version posted Aug 19, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 7 of 19 attachments weren't read (Attachment17CERTIFICATION_FOR_THE_USE_OF_BOEING_TECHNICAL_DATA.pdf, Attachment18Team_Roles_and_Responsibilities.xlsx and 5 more). Check the attachments on SAM.gov.
Defense Logistics Agency (DLA) Aviation at Hill AFB, Utah wants one prime contractor to manage the supply chain for about 2,800 landing gear spare parts for U.S. Air Force aircraft, from raw materials and forgings through quality control and delivery. It is a single-award, firm-fixed-price IDIQ (a contract where orders are placed over time) for 10 years (5-year base plus one 5-year option), set aside 100% for small business. Offers are due 1 March 2027 at 5:00 PM Mountain time; the SAM.gov title calls it a DRAFT RFP, but the text calls it a formal solicitation.
Who can bid (9)
- Small business under NAICS 336413 (100% small business set-aside); offerors must be certified small and have current online representations and certifications in SAM.gov
- Current AS9100 quality certification From Attachment3InstructionsToOfferors_SectionL.pdf
- Named key personnel (resumes and workload analysis) meeting the experience requirements in the Technical Requirements Document, plus a full-time program manager with authority to bind the company From Attachment3InstructionsToOfferors_SectionL.pdf
Show all 9Show fewer
- Access to the bid-set technical data requires signed agreements, which are mailed on removable drives; you must destroy the data within 12 months of receipt
- Adequate financial resources shown with the proposal From Attachment4EvaluationCriteria_SectionM.pdf
- Supply chain risk management plan covering cybersecurity (including a NIST SP 800-171 system security plan), continuity of operations and foreign influence (including an SF 328 foreign interest certificate) From Attachment2TRD.pdf
- Systems capability: a company system giving the Government real-time access to program, procurement and part-level quality data, EDI ordering with DLA, and registration in DIBBS to receive award notices From Attachment2TRD.pdf
- Foreign ownership, control or influence must be disclosed From Attachment2TRD.pdf
- Manufacturing sources must be qualified by the Air Force landing gear engineers (qualification by similarity checklist); sources must have access to original forging dies, and the Government gets unlimited use rights to forging dies
How to submit: Electronically through DoD SAFE. Email the Contracting Officer (Nathan Flinders, nathan.flinders@dla.mil) to request a DoD SAFE drop-off link, ideally no sooner than 14 days and no later than 72 hours before the due date. Proposal counts as received at the 'Drop-off Completed' time.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
- Serious: Very large, complex scope for a prime. A single small business must manage about 2,800 landing gear items, including safety-critical forgings with long lead times, and oversee its whole supplier network, which takes major supply chain capacity.
- Serious: Rating of Unacceptable on a technical sub-factor knocks you out. Any Unacceptable color or risk rating in Engineering, Program Management or Order Fulfillment makes the whole proposal un-awardable, and the Technical Volume alone can run 175 pages. From Attachment4EvaluationCriteria_SectionM.pdf
- Serious: Controlled technical data and mailed bid sets. The part drawings are export-controlled and limited to DoD contractors, are mailed on drives after you sign agreements (including one on Boeing data), and must be destroyed within 12 months, which slows proposal prep. From Attachment9LandingGearRequirementsDocument_LGRD.pdf
Show all 8Show fewer
- Worth checking: Strict performance targets with money at stake. On-time delivery is measured against 95% (DLA) and 90% (Air Force) goals, and the DLA consumable side carries an incentive or disincentive payment tied to the on-time rate.
- Worth checking: Binding fully burdened prices with first article testing and critical safety items. Prices for every NSN are binding for the contract, forging and first article costs must be built in, and critical safety item and quality rules raise the cost of mistakes; progress payments only cover forged and long lead items. From SPRHA126R1003.pdf
- Worth checking: Price evaluated over a simulated 10 years. The Government multiplies your proposed prices by notional quantities and escalates them for 10 years, so unit prices must hold up across the full range of items.
- Minor: Long price validity and heavy compliance paperwork. You must hold your offer for 365 days, and incomplete packages can be dropped from competition. From SPRHA126R1003.pdf
- Minor: Notice is labeled DRAFT RFP and documents are inconsistent. The title says draft but the notice type is Solicitation, volume numbers differ across Sections L and M (price is Volume II in one place and Volume III in another; contract documentation is Volume IV or V), and the SF 1447 default acceptance period (60 days) conflicts with the 365 days requested; ask the Contracting Officer to confirm.
Read from the notice and 12 attachments. 7 of 19 not read. Show which files.
- Attachment3InstructionsToOfferors_SectionL.pdf (read)
- Attachment4EvaluationCriteria_SectionM.pdf (read)
- SPRHA126R1003.pdf (read)
- Attachment2TRD.pdf (read)
- Attachment8_417GUEA_Checklist.pdf (read)
- Attachment9LandingGearRequirementsDocument_LGRD.pdf (read)
- Attachment10LGCSCI2BidsetAgreement.pdf (read)
- Attachment11PastPerformanceClientAuthLtr.docx (read)
- Attachment12PastPerformanceConsentLetter.docx (read)
- Attachment13PastPerformanceInformationSheet.docx (read)
- Attachment14PastPerformanceQuestionnaire.docx (read)
- Attachment16CERTIFICATE_OF_DESTRUCTION_OR_RETURN.pdf (read)
- Attachment17CERTIFICATION_FOR_THE_USE_OF_BOEING_TECHNICAL_DATA.pdf: not summarized: open it on SAM.gov
- Attachment18Team_Roles_and_Responsibilities.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attachment1TEPWorksheet.xlsx: not read (access is restricted): request it on SAM.gov
- Attachment5_AllCDRLs_and_DIDs.pdf: not read (access is restricted): request it on SAM.gov
- Attachment6_C5NLG_OuterCylinder1620004035249Portfolio.pdf: not read (access is restricted): request it on SAM.gov
- Attachment7_F16MLG_OuterPistonAssembly1620014420167Portfolio.pdf: not read (access is restricted): request it on SAM.gov
- Attachment15QualityAndPackagingMatrix.xlsx: not read (access is restricted): request it on SAM.gov
Full summary
What they want
- Run end-to-end supply chain management for about 2,800 landing gear NIINs (Air Force depot-level repairables and DLA consumables): purchasing raw material and forgings, overseeing subcontractors, quality assurance, and delivery
- Hit on-time delivery goals of 95% for DLA-managed parts and 90% for Air Force-managed parts
- Cut production lead times across the supply chain by at least 25%
- Provide engineering oversight and a quality escape (defective part) management plan, with key personnel and AS9100 certification
- Manage strategic raw material buys, forging dies and obsolescence (DMSMS) issues, and qualify new manufacturing sources
- Supply a full-time program manager, an ERP/supply chain system giving the Government real-time access to program and quality data, and supply chain risk management (cyber, continuity, foreign influence) plans
- Process orders by EDI (electronic data exchange) for DLA consumables and by DD Form 1155 for Air Force parts, with first article testing where required
- Contract type
- Single-award IDIQ, firm-fixed-price with economic price adjustment (EPA); out-year prices adjusted using a Producer Price Index for aerospace product and parts manufacturing. Order size: $1,000 minimum, $10,000,000 maximum per order. Delivery orders issued by the Air Force (twice a year) and DLA.
- Period of performance
- 10 years: 5-year base period plus one 5-year option. Contractor gets at least 90 days to ramp up to full support after award.
- Place of performance
- USA (notice header). Contract administered by DLA Weapons Support at Hill AFB, UT; parts are shipped to DLA distribution depots or Air Force locations named on each order.
- Estimated value
- No total contract value stated. Contract minimum guarantee is $10,000,000 over the base period, and the maximum for a single order is $10,000,000.
- Contract vehicle
- New standalone IDIQ contract, SPRHA1-26-R-1003, competed as a 100% small business set-aside under NAICS 336413 / PSC 1620. Rated order under the Defense Priorities and Allocations System (DPAS).
- How they'll choose
- Best-value tradeoff. Technical is most important, then Price, then Past Performance; all non-price factors combined are significantly more important than price. The Government can pay more for a higher-rated offer and intends to award without discussions, though it may hold them. One award, or no award.
- Offers due
- Mar 1, 2027, 5:00 PM MST · 7:00 PM Eastern (1 March 2027, 5:00 PM Mountain) (from the version posted Aug 19, 2026; amended since)
- How to submit
- Electronically through DoD SAFE. Email the Contracting Officer (Nathan Flinders, nathan.flinders@dla.mil) to request a DoD SAFE drop-off link, ideally no sooner than 14 days and no later than 72 hours before the due date. Proposal counts as received at the 'Drop-off Completed' time.
- Page limits
- Volume I Technical: 175 pages. Volume II Price: unlimited (pricing assumptions up to 20 pages). Volume III Past Performance: 40 pages. Contract documentation: unlimited. Supply Chain Risk Management plan: 10 pages. Excess pages are not read.
What they'll judge offers on
- Factor 1 Technical (most important), sub-factors in order: Engineering, Program Management, Order Fulfillment
- Factor 2 Price: completeness, reasonableness, balance, and Total Evaluated Price over a simulated 10 years
- Factor 3 Past Performance (least important): rated Acceptable or Unacceptable, recent (under 5 years) and relevant contracts
What to include when you submit
- Four separate volumes: Technical, Price, Past Performance, Contract Documentation (the Section L text numbers these inconsistently)
- Format: 8.5 x 11 inch pages, single spaced, Times New Roman at least 12-point, 1-inch top and bottom margins, 3/4-inch side margins; put 'SOURCE SELECTION INFORMATION--SEE FAR 2.101 AND 3.104 FOR OFFICIAL USE ONLY' at the bottom of every page
- Each volume needs a title page (solicitation number, company, CAGE code, contact), table of contents, list of tables and figures, and acronym glossary; Technical volume must include a cross-reference matrix to Sections L, M and the Technical Requirements Document
- Price: complete the Excel Total Evaluated Price (TEP) worksheet (Attachment 1) with annual fixed prices for up to four quantity ranges per NSN, production lead times, first article prices and minimum buy quantities; prices must be fully burdened and are binding; DoD SAFE drop-off allows 25 files per link
- Past performance: up to 10 contracts for the whole team, with Past Performance Information Sheets, signed client authorization letters (commercial work), consent letters from subcontractors and teaming partners, and a Team Roles and Responsibilities worksheet; third parties send questionnaires directly to the Contracting Officer
- Contract documentation: signed SF 1447 (enter 365 days for offer acceptance), representations and certifications, any exceptions to terms in a table, point of contact for negotiations, proof of adequate financial resources, monthly delivery capacity by NSN, and the Supply Chain Risk Management plan
- To get the bid-set (technical data) drives, email the Contracting Officer with your mailing address and include signed copies of the Boeing technical data certificate (Attachment 17) and the Bid-Set Agreement (Attachment 10)
- Source selection emails must be encrypted (S/MIME) and marked 'Source Selection Information - See FAR 2.101 and 3.104' in the subject line
- Contracting Officer is the only point of contact; no oral presentations
Current contractor
No incumbent is named.
Not in the notice text
- The full price schedule: the Total Evaluated Price worksheet (Attachment 1) is controlled and was not available, so item list, quantities and lead times are unknown
- Contract data deliverables (CDRLs and DIDs), the two example parts' portfolios (C-5 nose gear outer cylinder and F-16 main gear outer piston) and the quality and packaging matrix, which are controlled files that must be requested on SAM.gov
- Boeing technical data certification (Attachment 17) and the Team Roles and Responsibilities worksheet, which were not read
- The middle of the main solicitation (most contract clauses and special terms), of the Technical Requirements Document (source qualification, quality, first article, packaging and other requirements), and of the Landing Gear Requirements Document, which were cut from the text
- Total dollar value or the number of orders expected
- Small business size standard for NAICS 336413 is not stated in the text
Notice details
Notice type, codes, versions and files
- Posted
- Aug 19, 2026
- Notice type
- Solicitation
- Office
- DLA Aviation at Ogden, UT, Hill Air Force Base, UT
- Product/service code
- 1620 · Aircraft Landing Gear Components
- Business type
- Aircraft, ship & vehicle parts (FedReady's grouping, from NAICS 336413)
- Versions
4 versions have been posted, newest first.
- Nov 23, 2026 · Amendment 0003Due Mar 1, 2027
- Oct 29, 2026 · Amendment 0002Due Mar 1, 2027
- Aug 19, 2026 · Amendment 0001Due Mar 1, 2027
- Aug 19, 2026 · Solicitation (this version)Due Mar 1, 2027
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Landing Gear Wear Pad / 40A, UH-60A, UH-60L, HH/UH-60M, UH-60V Black Hawk HelicopterOnly small businesses can bid on solicitation SPE4A727R0065-Synopsis from the Defense Logistics Agency (DLA) Aviation: a five-year indefinite quantity contract (IQC) for Black…
- Aircraft, Hercules, C-130; Guide Shoe Assembly, Landing GearThe Defense Logistics Agency (DLA) Aviation plans a request for proposal for the C-130 Hercules landing gear guide shoe assembly (NSN 1620-010982748), set aside for small…
- W58RGZ-26-B-0004 Amendment 0005 OVERHAUL/UPGRADE LANDING GEAR FIXED
- 417 SCMS Landing Gear Depot Support (LGDS)The Defense Logistics Agency (DLA) Aviation office at Ogden, Utah and the 417th Landing Gear Supply Chain Management Squadron are asking industry for feedback in a sources sought…
- Draft Fair Opportunity Proposal Request (FOPR)The Air Force Nuclear Weapons Center is asking for draft proposals to build B-52 Nuclear Stores Interface Units (NSIUs), nuclear-hardened electronic units, from a…