Presolicitation
B-52J CERP Production Modification Kits & ICS
Department of Defense · Department of the Air Force
Solicitation expected Jun 30, 2027 · No set-aside · Tinker AFB, OK
Advance notice of a coming solicitation, not a bid yet. If it asks for capability statements, sending one is free and puts you on Department of the Air Force's list before the solicitation is posted. See the contact
A newer version of this notice was posted Jul 1, 2026. It moves the due date from Jun 30, 2026 to Jun 30, 2027, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of another version of this notice: check what changed on SAM.gov. This summary may miss requirements: 24 of 25 attachments weren't read (Att11-Appendix_D-Pricing Matrix_Production_31Mar26-DRAFT.xlsx, CUI-QA CERP Industry Day 12May2026.xlsx and 22 more). Check the attachments on SAM.gov.
The Air Force (AFLCMC at Tinker AFB, Oklahoma) plans a roughly 10-year contract to build and deliver modification kits for the B-52J Commercial Engine Replacement Program (CERP), plus support, spares, support equipment and data. This is a draft/presolicitation with no set-aside. No proposals are being accepted yet and funds are not yet available.
Who can bid (5)
- Approved DD Form 2345 (Joint Certification Program) to get controlled technical data
- CMMC Level 2 (Self) or higher, with current status and affirmation entered in SPRS before award From DRAFT-Solicitation-FA810726RB001.pdf
- Quality system to AS9100 or ISO 9001:2015, flowed down to subcontractors From DRAFT-Solicitation-FA810726RB001.pdf
Show all 5Show fewer
- No set-aside; the draft lists a 1,500-employee size standard under NAICS 336411 From DRAFT-Solicitation-FA810726RB001.pdf
- Active SAM registration, responsibility certifications, and Buy American certifications
How to submit: Not stated in the readable text; the submission instructions are in a controlled attachment. Questions go by email to the Contracting Officer, Ashley Brink, with a copy to Kacie Cram, due SAM.gov lists a response deadline of Jun 30, 2027 5:00 PM (UTC-05:00), but the draft form shows 12:00 PM 01 May 2026 and says no proposals are being accepted yet. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (6)
From the version posted Jul 1, 2026.
- Serious: Aircraft production scale and complexity. This is a multi-year production contract for B-52 engine kits with first article testing and large support requirements, which is realistic only for large primes or as a subcontractor. From DRAFT-Solicitation-FA810726RB001.pdf
- Serious: Controlled documents and export-control access. The statement of work, evaluation factors and drawings are restricted, and you need an approved DD Form 2345 and JCP registration before you can even read them.
- Worth checking: Draft only, funds not available. Nothing can be submitted yet, the requirement may change or be cancelled, and the dates on the form conflict with the SAM.gov deadline. From DRAFT-Solicitation-FA810726RB001.pdf
Show all 6Show fewer
- Worth checking: Heavy cost and pricing paperwork. The draft requires a Proposal Adequacy Checklist, possible certified cost or pricing data and Cost Accounting Standards disclosures, which is a big burden for a small company.
- Worth checking: Many prices are left to be negotiated. Spares, support equipment, tooling and over-and-above work are priced per occurrence after award, so total cost and profit are hard to predict. From DRAFT-Solicitation-FA810726RB001.pdf
- Minor: Long period with a low guaranteed minimum. The government's minimum commitment is only the first year of program management, even though the contract could run 10 years. From DRAFT-Solicitation-FA810726RB001.pdf
Read from the notice and 1 attachment. 24 of 25 not read. Show which files.
- DRAFT-Solicitation-FA810726RB001.pdf (read)
- Att11-Appendix_D-Pricing Matrix_Production_31Mar26-DRAFT.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- CUI-QA CERP Industry Day 12May2026.xlsx: not read (access is restricted): request it on SAM.gov
- CUI -B52 CERP Production Kit ICS Industry Day Brief 12May26.pdf: not read (access is restricted): request it on SAM.gov
- CUI -B52J CERP Production Mod Kit ICS RFI Responses 8 May 26.pdf: not read (access is restricted): request it on SAM.gov
- CUI-B52 CERP PRODUCTION MOD KIT_ICS Questions to Industry.pdf: not read (access is restricted): request it on SAM.gov
- Att1 Appendix_A SOW_CERP_Production_Kit_Contract 11Feb26 DRAFT.pdf: not read (access is restricted): request it on SAM.gov
- Att2-SOW_Att1_Production_Schedule-11Feb26-DRAFT.pdf: not read (access is restricted): request it on SAM.gov
- Att3-SOW_Att2-Requirement_Update_Process-11Feb26-DRAFT.pdf: not read (access is restricted): request it on SAM.gov
- Att4-SOW_Att3-Component_Sourcing_and_Kitting_Matrix-DRAFT.pdf: not read (access is restricted): request it on SAM.gov
- Att5-SOW_Att4-GFP_Sample-11Feb26-DRAFT.pdf: not read (access is restricted): request it on SAM.gov
- Att6-SOW_Att5-B52_Configuration_Management_Plan-11Feb26.pdf: not read (access is restricted): request it on SAM.gov
- Att7-SOW_Att6-Program_Risk_Mangement_Plan-11Feb26.pdf: not read (access is restricted): request it on SAM.gov
- Att8-SOW_Att7-BMU_Drawings.pdf: not read (access is restricted): request it on SAM.gov
- Att9 Appendix_B CDRL 11Feb26 DRAFT.pdf: not read (access is restricted): request it on SAM.gov
- Att10-Appendix_C-DD_Form_254-DRAFT.pdf: not read (access is restricted): request it on SAM.gov
- Att12-Appendix_E-B52_CERP_Production_Section_L_Instructions_to_Offer-DRAFT.pdf: not read (access is restricted): request it on SAM.gov
- Att13-Appendix_F-B52_CERP_Production_Section_M_Evaluation_Factors-DRAFT.pdf: not read (access is restricted): request it on SAM.gov
- Att14-Appendix_G-AFMC_Form_158-17Mar26-DRAFT.pdf: not read (access is restricted): request it on SAM.gov
- Att15-Appendix_H-DD_Form_1653-11Mar26-DRAFT.pdf: not read (access is restricted): request it on SAM.gov
- Att16-Appendix_J-AFMC_260_First_Article_Requirements-25Feb26-DRAFT.pdf: not read (access is restricted): request it on SAM.gov
- Att17-Appendix_K-AFMC_807_Quality-11Mar26-DRAFT.pdf: not read (access is restricted): request it on SAM.gov
- Att18-Appendix_L-Government_Rights_In_Data.pdf: not read (access is restricted): request it on SAM.gov
- Att19-Appendix_M1-Bidders_Library1-Parts_Description_List-DRAFT.xlsx: not read (access is restricted): request it on SAM.gov
- Att20-Appendix_M2-B52_CAST.pdf: not read (access is restricted): request it on SAM.gov
Full summary
What they want
- Build and deliver production modification kits in Kit Groups A, B and E (Lot 1 first-article kits, then Lots 2-6), with long-lead and non-long-lead parts
- First article testing of the Lot 1 kits
- Program and manufacturing management, engineering, security and program protection, configuration and data management
- Integrated logistics support and maintenance planning
- Field service representative support at the Tinker AFB depot, and kit proofing
- Spare parts, peculiar and common support equipment, production tooling and data as needed
- Over-and-above labor, materials, storage, shipping and travel priced per occurrence
- Quality system certified to AS9100 or ISO 9001:2015
- Contract type
- Indefinite-delivery/indefinite-quantity (IDIQ) contract with firm-fixed-price delivery orders
- Period of performance
- Ordering period of up to 10 years: a 4-year base (about 30 Nov 2028 to 29 Nov 2032) plus six 1-year options (illustrative dates that shift with award date)
- Place of performance
- Tinker AFB, OK (delivery and field service support at the depot)
- Estimated value
- Not stated
- Contract vehicle
- New IDIQ, solicitation FA810726RB001, with DPAS rating DO-A1 shown on the draft
- Offers due
- SAM.gov lists a response deadline of Jun 30, 2027 5:00 PM (UTC-05:00), but the draft form shows 12:00 PM 01 May 2026 and says no proposals are being accepted yet
- How to submit
- Not stated in the readable text; the submission instructions are in a controlled attachment. Questions go by email to the Contracting Officer, Ashley Brink, with a copy to Kacie Cram
What to include when you submit
- Section L (instructions) and Section M (evaluation factors) are in separate controlled attachments you must request access to
- To see technical data, email the Contracting Officer the solicitation number, the specific data needed and a copy of your approved DD Form 2345
- Register in the Joint Certification Program (JCP), then have the DATA CUSTODIAN named in DD Form 2345 Block 3 request access on SAM.gov; allow 5 business days
- Complete the Proposal Adequacy Checklist (DFARS 252.215-7009) with the proposal
- Provide CMMC unique identifiers from SPRS for each system that handles federal contract information or controlled unclassified information
- Pricing goes in the CLIN Pricing Matrix (Appendix D), not in Section B
Not in the notice text
- Evaluation factors and how offers will be compared (Section M is in a controlled attachment)
- Proposal submission method and format (Section L is in a controlled attachment)
- The full statement of work, delivery schedule and kit contents (controlled attachments)
- Estimated contract value (shown as blank in the draft) and the pricing matrix, which was not read
- Final response deadline: the draft form says 01 May 2026 while SAM.gov shows Jun 30, 2027
- Contents of the middle of the draft solicitation (sections F through I, including delivery schedule and special requirements), which were left out of the text provided
- Answers from the Industry Day Q&A and RFI responses (controlled)
More to check before you bid
- The notice names requirements:
- The notice mentions export-controlled data. You may need a Joint Certification Program (DD Form 2345) approval to see the drawings.
- The AI summary's reading of the notice and its attachments says a bidder needs: CMMC certification. The summary's list is under Who can bid; check it in the notice before you bid.
- Service contracts usually set minimum pay rates (the Service Contract Act). Price the labor with the SCA price calculator.
Notice details
Notice type, codes, versions and files
- Posted
- Apr 2, 2026
- Notice type
- Presolicitation
- Office
- FA8107 AFLCMC WBK-1, Tinker AFB, OK
- Product/service code
- L015 · Technical Representative – Aircraft and Airframe Structural Components
- Business type
- Aircraft, ship & vehicle parts (FedReady's grouping, from NAICS 336411)
- Versions
7 versions have been posted, newest first.
- Jul 1, 2026 · Amendment 0006Expected Jun 30, 2027
- May 12, 2026 · Amendment 0005Expected Jun 30, 2027
- May 11, 2026 · Amendment 0004Expected Jun 30, 2027 (changed)
- Apr 20, 2026 · Amendment 0003Date Jun 30, 2026
- Apr 16, 2026 · Amendment 0002Date Jun 30, 2026
- Apr 10, 2026 · Amendment 0001Date Jun 30, 2026
- Apr 2, 2026 · Presolicitation (this version)Date Jun 30, 2026
- Attachments
Before you respond
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Supplemental F/A-18E/F and EA-18G Service Life Modification (SLM) Capacity Request for Information (RFI)NAVAIR (the Naval Air Systems Command), for the F/A-18E/F and EA-18G Program Office (PMA-265), is running a sources sought request for information, N00019-26-RFPREQ-TPM265-0459.
- Small Unmanned Aircraft System (sUAS) Field Fabrication Molds, Component Build Kits, and MCA Integration Training
- Seal, Nonmetallic SpeciDefense Logistics Agency (DLA) Weapons Support wants quotes on solicitation SPE7LX27U0620 for SEAL,NONMETALLIC SPECI (NSN 5330005314960), QTY 33 EA. SAM.gov states no set-aside.
- E-6B Maintenance, Repair and Overhaul (MRO)Presolicitation: Naval Air Systems Command (NAVAIR) plans a single-award indefinite delivery, indefinite quantity (IDIQ: orders placed as needed over the contract term) contract…
- Fire Control Radar (FCR)The Army Contracting Command at Redstone Arsenal, Alabama wants a new follow-on contractor to keep the Apache AH-64 Fire Control Radar supplied, tracked and supported for a…