Combined Synopsis/Solicitation
Morgantown Pavement Restoration
Department of Agriculture · Forest Service
Small business set-aside · Morgantown, WV
AI summary Beta
Only small businesses can bid on solicitation 12445127B0005, an invitation for bid (IFB: award goes to the lowest-priced bid that follows the rules) from the Forest Service (for the Northern Research Station). The job is to crack seal, seal coat and re-stripe parking lots at 180 Canfield Street, Morgantown, WV. A bid bond is required with the bid, and the response due date is January 6, 2027, 10:00 AM Eastern.
Who can bid (4)
- Total small business set-aside: only small businesses can bid (size standard for NAICS 237310 is listed as $45 million)
- Bid guarantee: a bid bond on Standard Form 24 with power of attorney, sent with the bid; the percentage or amount is not stated in the text From C04_Solicitation_12445127B0005.pdf
- Registered in the System for Award Management (SAM) before award From A04_SOW_12445127B0005.pdf
Show all 4Show fewer
- Attend the pre-bid meeting, which the statement of work calls mandatory From A04_SOW_12445127B0005.pdf
How to submit: Email to cynthia.granderson@usda.gov with subject line 12445127B0005_Company Name_BID; call 601-965-1619 to confirm receipt. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
From the version posted Nov 19, 2026.
- Serious: Small business set-aside. Only small businesses can bid; larger firms are shut out.
- Serious: Bid bond required with the bid. A bid with no executed SF 24 bid bond and power of attorney can be rejected, and getting a surety bond takes time and credit. From C04_Solicitation_12445127B0005.pdf
- Serious: Pre-bid meeting called mandatory; site visit on December 9, 2026. The statement of work calls a pre-bid meeting mandatory, while the solicitation lists an organized site visit with RSVP; it does not say they are the same, so ask the contracting officer. From C04_Solicitation_12445127B0005.pdf
Show all 11Show fewer
- Worth checking: Performance and payment bonds after award. The clause for performance and payment bonds on construction is checked, so a surety must also cover the work after award. From C04_Solicitation_12445127B0005.pdf
- Worth checking: Completion time is 65 days in one place and 90 days in another. The SF 1442 gives 65 calendar days to complete, while the statement of work gives 90 calendar days from notice to proceed; ask the contracting officer which governs. From A04_SOW_12445127B0005.pdf
- Worth checking: Seal coat quantity differs between documents. The schedule gives 46,000 square feet of seal coat and the statement of work gives 45,950 SF, and quantities are only estimates to be field verified. From A04_SOW_12445127B0005.pdf
- Worth checking: Striping quantities are unclear. The schedule lists 5,440 LF of line striping and 6 LF of ADA striping, while the statement of work lists 80 stalls, 6 ADA stalls and hatched areas. From A04_SOW_12445127B0005.pdf
- Worth checking: Evening and weekend work only. All work is in the evenings, and seal coating and line painting only on Friday, Saturday or Sunday, which limits crew scheduling. From A04_SOW_12445127B0005.pdf
- Worth checking: Davis-Bacon wage rates apply. Wage determination WV20260112 sets minimum pay for workers on this construction job, so price labor at those rates. From C04_Solicitation_12445127B0005.pdf
- Minor: Solicitation number typed two ways in the notice. The notice text says 1244512B0005 while SAM.gov and the documents say 12445127B0005; use 12445127B0005 in the email subject line.
- Minor: Service Contract wage clause also checked. The clause list checks both the Service Contract Labor Standards and the construction wage rules, so ask the contracting officer which wage rules govern. From C04_Solicitation_12445127B0005.pdf
Read from the notice and 3 attachments. Show which files.
- C04_Solicitation_12445127B0005.pdf (read)
- A04_SOW_12445127B0005.pdf (read)
- SF24.pdf (read)
Full summary
What they want
- Crack seal about 2,000 LF (linear feet) of cracks after inspecting the lots for repairs needed before sealing
- Seal coat the parking lots: 46,000 SQ FT in the schedule, 45,950 SF in the statement of work
- Line stripe the lots: 80 stalls, 6 ADA (accessible) stalls and hatched areas in the statement of work; 5,440 LF line striping and 6 LF ADA striping in the schedule
- Provide all labor, materials, tools, equipment, permits, testing and reports, with mobilization priced as one lump sum
- Work only in the evenings, with seal coating and line painting only on Friday, Saturday or Sunday unless the COR (contracting officer's representative) allows otherwise in writing
- Remove waste daily, protect parked vehicles, grass and structures, and seed and mulch areas disturbed by the work
- After award: give the contracting officer (CO) and COR a work schedule within 10 business days, and notify the COR two weeks before starting
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing), awarded from an invitation for bid
- Period of performance
- Period of performance 02/01/2027 to 04/06/2027 on the SF 1442 continuation sheet; complete within 65 calendar days (SF 1442 and solicitation) or within 90 calendar days of notice to proceed (statement of work)
- Place of performance
- USDA Northern Research Station Lab and Annex, 180 Canfield Street, Morgantown, WV 26505
- Estimated value
- Magnitude between $25,000 and $100,000, as stated on the solicitation's continuation sheet
- How they'll choose
- Lowest price from a bid that is responsive (follows the solicitation) and responsible (the business can do the work); one award planned; bidders must price all items
- Offers due
- January 6, 2027, 10:00 AM Eastern
- How to submit
- Email to cynthia.granderson@usda.gov with subject line 12445127B0005_Company Name_BID; call 601-965-1619 to confirm receipt
What they'll judge offers on
- Price: lowest price among responsive and responsible bids
- Responsiveness: bid includes pricing for all items, bid guarantee, signed SF 1442 and completed Schedule B
What to include when you submit
- Include the signed Standard Form 1442 (SF 1442: the form you sign and return as your bid)
- Include a scanned, fully executed bid guarantee: Standard Form 24 (SF 24) bid bond and power of attorney
- Include Schedule B (the schedule of items with your prices) completed, as an Adobe PDF, and price all lines
- Acknowledge any amendments, which can be done by submitting the signed SF-30 forms
- Hold your prices firm for 90 calendar days from the date offers are due
- Send questions by email to cynthia.granderson@usda.gov with the solicitation name and number as the subject line
After award, you must have
- Performance and payment bonds (clause 52.228-15 is checked); the SF 1442 box saying whether they are required could not be read From C04_Solicitation_12445127B0005.pdf:
52.228-15 Performance and Payment Bonds-Construction (Jun 2020)
Not in the notice text
- The bid bond amount or percentage of the bid price is not stated in the text read
- Whether the December 9, 2026 site visit is the mandatory pre-bid meeting is not stated
- The SF 1442 box on whether performance and payment bonds are required, and their amounts, could not be read; check the form on SAM.gov
- The site map and drawings are pictures, so the exact lot boundaries and hatched areas could not be read; check them on SAM.gov
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- National Forests in Mississippi, Jackson, MS
- Product/service code
- Z2LB · Repair or Alteration of Highways/Roads/Streets/Bridges/Railways
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237310)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1)Sealed bid 693C73-27-B-000003 (invitation for bids, IFB) from the Federal Highway Administration's Eastern Federal Lands Division, open only to small businesses.
- Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY25(2)Sealed bid 693C73-27-B-000004 (invitation for bids, IFB) from the Federal Highway Administration's Eastern Federal Lands Division, open only to small businesses.