Combined Synopsis/Solicitation
X209 Meltio M600 Laser Metal Wire 3D Printer FY27…
Department of Energy
A newer version of this notice was posted Nov 23, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 16, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov. The notice looks incomplete: Part of Attachment B, the Terms and Conditions, was left out of what was read (61,311 of 89,540 characters), so some standard clauses were not seen. Check the attachments on SAM.gov.
UT-Battelle, which runs Oak Ridge National Laboratory for the Department of Energy, wants one Meltio M600 laser metal wire 3D printer, or a domestic equivalent, with accessories, installation and training, for its Defense Manufacturing Program Office (RFP518395). There is no set-aside. The response due date is November 30, 2026, 12:00 PM Eastern. The one award goes to the lowest-priced offer that meets every requirement.
Who can bid
- Offer must be a domestic end product: the Meltio M600 or a domestic alternative, with any foreign end products listed From Attachment A - Meltio M600 Laser Metal Wire 3D Printer - Bill of Material and Pricing Worksheet.pdf
- SAM.gov registration is strongly encouraged to verify small business status and eligibility; Ariba registration is used to set up electronic payment From RFP518395.pdf
How to submit: Not stated in the RFP; send questions and contact the Procurement Officer, Rian Lewis, at lewisgr@ornl.gov. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (6)
- Serious: Shipping destination differs from SAM.gov place of performance. The RFP says to ship to San Diego, CA, while SAM.gov lists Oak Ridge, TN and final acceptance happens after installation at the Company's site; ask where the printer goes. From RFP518395.pdf
- Serious: Domestic equivalent required. The worksheet asks for the Meltio M600 or a domestic alternative, and the certifications ask you to list any foreign end products and countries of origin, so a foreign-built machine may be a problem. From Attachment A - Meltio M600 Laser Metal Wire 3D Printer - Bill of Material and Pricing Worksheet.pdf
- Worth checking: Questions were due Nov 20, 2026. Check the amendments for the agency's answers. From RFP518395.pdf
Show all 6Show fewer
- Worth checking: Lowest price wins. Award goes to the lowest-priced offer that meets every requirement, so any deviation from the specification can knock an offer out. From RFP518395.pdf
- Worth checking: Install, training and tariffs included in the price. The worksheet includes installation, three-day training with travel and per diem, freight and fees or tariffs, which the offeror must price. From RFP518395.pdf
- Minor: Payment after final acceptance. Payment comes after final acceptance, which is tested after installation: net 15 days for small business, net 30 days for large business. From RFP518395.pdf
Read from the notice and 7 attachments. Show which files.
- RFP518395.pdf (read)
- Attachment A - Meltio M600 Laser Metal Wire 3D Printer - Bill of Material and Pricing Worksheet.pdf (read)
- Attachment B - Terms-Conditions-Commerical-Products-and-Services-BSD-CS-2146-09.30.2026.pdf (read)
- Attachment C - Prime-Flowdown-Clauses-BSD-CS-2258-09.30.2026.pdf (read)
- Attachment D - Reps-and-Certs-Abbreviated - 2026.03.09.pdf (read)
- Attachment E - Cybersecurity Supply Chain Risk Management (C-SCRM) Questionnaire -BSD-CS-2290 (012025).pdf (read)
- Attachment F - Exhibit-CCS-Commercial-Computer-Software-License-07-29-2010.pdf (read)
Full summary
What they want
- Line 1: Meltio M600 laser metal wire 3D printer, 1 kW (nine 111-watt diode lasers), print envelope 300 x 400 x 600 mm, QTY 1
- Line 2: hot wire option, QTY 1; line 3: option for printing with two wire materials in turn, QTY 1
- Lines 4 to 12: zero point clamping, shield gas nozzle, drive wheel sets, carbon wire guides, protective glass, QTY 1 each, and wire nozzles, QTY 10 each of two sizes
- Line 13: Meltio Horizon first-year toolpath software license, two seats, QTY 1
- Line 14: installation (one day) and three days of training for up to 5 students, travel included, QTY 1
- Lines 15 and 16: freight and fees or tariffs, each QTY 1, priced separately
- Final acceptance is testing against the specification after installation at the Company's site
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing) subcontract for a commercial product, one award
- Period of performance
- Anticipated period of performance is listed as TBD; the offeror states its delivery time
- Place of performance
- Oak Ridge, TN per SAM.gov; the RFP gives San Diego, CA as the shipping destination
- Estimated value
- Not stated
- How they'll choose
- Lowest price technically acceptable (LPTA): award to the lowest-priced offer that meets all specified requirements
- Offers due
- November 30, 2026, 12:00 PM Eastern (from the version posted Nov 16, 2026; amended since)
- How to submit
- Not stated in the RFP; send questions and contact the Procurement Officer, Rian Lewis, at lewisgr@ornl.gov
What they'll judge offers on
- Technical acceptability (pass/fail): the materials and services in Attachment A, the Bill of Materials and Pricing Worksheet
- Price: lowest price among acceptable offers
What to include when you submit
- Submit the proposal in MS Excel, MS Word or PDF, on the forms provided.
- Send a proposal package with a technical proposal, price proposal, exceptions or non-compliance section, conditions and assumptions, and supplementary requirements.
- Fill in Attachment A, the Bill of Materials and Pricing Worksheet, with part numbers, manufacturer, lead time, country of origin, unit and extended prices; give freight and any tariffs on their own lines.
- Offer the Meltio M600 or a domestic alternative; clearly mark any proposed equal and attach descriptive material showing it meets the listed characteristics.
- Include a schedule and a definite delivery time.
- Include a company profile with business classification, and the names and contact details of people authorized to commit the company.
- Complete and return the Representations and Certifications - Abbreviated form (BSD-CS-2260) if the proposal exceeds $15,000.
- List any foreign end products and their country of origin.
- Return the Cybersecurity Supply Chain Risk Management questionnaire (Attachment E).
- Keep the offer valid for 120 calendar days.
After award, you must have
- Deliveries on site at ORNL must be made by a U.S. citizen or a registered and approved foreign national From Attachment B - Terms-Conditions-Commerical-Products-and-Services-BSD-CS-2146-09.30.2026.pdf:
All deliveries coming on site to ORNL must be delivered by a United States Citizen or a Foreign National that is registered in…
Not in the notice text
- Part of Attachment B, the Terms and Conditions, was left out of what was read (61,311 of 89,540 characters), so some standard clauses were not seen.
- Where to send the proposal (email or portal) is not stated.
- The delivery date and the anticipated period of performance are not given (listed as TBD).
- No dollar estimate is given for the contract.
- Whether the printer ships to San Diego, CA or Oak Ridge, TN is unclear.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 16, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- Ornl Ut-Battelle LLC-DOE Contractor, Oak Ridge, TN
- Product/service code
- 3695 · Miscellaneous Special Industry Machinery
- Business type
- Manufactured parts & equipment (FedReady's grouping, from NAICS 333248)
- Versions
2 versions have been posted, newest first.
- Nov 23, 2026 · Amendment 0001Due Nov 30, 2026
- Nov 16, 2026 · Combined Synopsis/Solicitation (this version)Due Nov 30, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- **Big Blue 3 MAC** Metal printer alterations will be completed onboard USS IWA JIMA (LHD 7), USS BOXER (LHD 4), LHD 8 (USS MAKIN ISLAND)The Navy's Naval Surface Warfare Center (NSWC) Philadelphia Division has solicitation N6449826Q0054 for metal printer alterations onboard USS Iwo Jima (LHD 7), USS Boxer (LHD 4)…
- TECHNOLOGY LICENSING OPPORTUNITY: GasFlow DLP Printing Interface
- Resonant Acoustic Mixer (RAM) System UpgradeThe Naval Air Warfare Center Weapons Division at China Lake intends to buy Resonant Acoustic Mixer (RAM) upgrade equipment from one named company, The Falcon Project, Ltd.,…
- Red Garnet Alluvial #80 Mesh AbrasiveThe U.S. Coast Guard Surface Forces Logistics Center wants 40 tons of #80 mesh red garnet alluvial abrasive for the 87' Pompano, delivered to Baltimore, MD. It is a total small…
- Special Industrial Manufacturing Equipment and Parts (Vacuum, Mixing, and Grinding)Naval Surface Warfare Center Indian Head Division (NSWC IHD) in Indian Head, Maryland wants to set up blanket purchase agreements (BPAs: standing agreements for repeat orders)…