Solicitation
WWYK250063 - Install React VII Facility, B9001, Post V19
Department of Defense · Department of the Air Force
WOSB set-aside · Tinker AFB, OK
A newer version of this notice was posted Nov 23, 2026. It moves the due date from Nov 2, 2026 to Dec 18, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Oct 5, 2026. The notice was amended Nov 23, 2026. The due date moved from Nov 2, 2026 to Dec 18, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 123 of 135 attachments weren't read (SOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx, SOW Att 02a_Controlled Area Training.pptx and 121 more). Check the attachments on SAM.gov.
The Air Force (Tinker AFB, Oklahoma) wants a contractor to design and build a new React VII facility in Building 9001. The job is set aside 100% for SBA-certified women-owned small businesses (WOSB), priced firm-fixed-price, with 240 calendar days to finish after notice to proceed. Offers are due Nov 2, 2026 (passed) at 2:00 PM, and attending a site visit on Oct 15, 2026 (passed) is required to be eligible to bid.
Who can bid (10)
- Must be an SBA-certified Women-Owned Small Business (WOSB); this is a 100% WOSB set-aside
- Small business size standard for NAICS 236220 is $45 million in average annual receipts From Solicitation - FA813727R0002.pdf
- Must attend the Initial Site Visit (after sending the RSVP) to be eligible to propose
Show all 10Show fewer
- Site visit attendees need Tinker AFB base access, or an Entry Access List (EAL) must be sent with the RSVP
- Active SAM registration; the Government checks SAM for contractor responsibility From Solicitation - FA813727R0002.pdf
- Key personnel after award: Project Manager (10 years combined experience, 2 as a project/program manager), Quality Control Manager, Site Safety and Health Officer, Project Superintendent (5 years, 2 as superintendent), each with a named alternate; resumes due within 5 calendar days after notice to proceed From 250063_SOW.pdf
- Design subcontractors must be authorized to offer engineering or architectural services in a U.S. state or territory (an Oklahoma license is not required); trade subcontractors must be licensed in their specialty From 250063_SOW.pdf
- All contractor personnel must hold Tinker AFB contractor badges before starting work, and a company Certifying Official must be named From 250063_SOW.pdf
- Firestopping installers must be FM Research approved or a UL Certified Firestop Contractor, with manufacturer-trained installers From 2026 TAFB FIRE PROTECTION STANDARD.pdf
- Performance and payment bonds if the contract requires them (the form's yes/no box and the offer guarantee box cannot be read) From Solicitation - FA813727R0002.pdf
How to submit: The cost portion of the proposal goes by e-mail (DFARS 252.215-7012 says E-Mail). How the technical volume is delivered is not stated in the text provided. Contracting contacts: isaac.demmers@us.af.mil and tamra.torres@us.af.mil, due Nov 2, 2026 at 2:00 PM local time (notice shows 14:00 at UTC-06:00). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (11)
- Serious: Only certified WOSBs can bid. This is set aside for women-owned small businesses certified in SBA's WOSB program; others can't bid as the prime.
- Serious: Mandatory site visit with a short RSVP window. You are not eligible to bid unless you RSVP within 5 calendar days of the Oct 5 posting (about Oct 10) and attend the Oct 15 visit in person at Tinker AFB, so any base-access paperwork must move fast.
- Worth checking: Hybrid design-build with approximate Government data. The contractor owns both design and construction, and Government layouts, utilities and dimensions are only approximate and must be field verified, so unforeseen conditions and design errors are a pricing risk. From 250063_SOW.pdf
Show all 11Show fewer
- Worth checking: Only low-risk technical approaches pass. Technical is pass/fail on each subfactor and one deficiency makes a subfactor unacceptable, so a thin technical volume can knock you out before price is looked at. From Solicitation - FA813727R0002.pdf
- Worth checking: Demanding key personnel and on-call response times. A full on-site management team is required, including a superintendent who must reach the site within 30 minutes of a call and a PM who must reach Tinker AFB within 1 hour, which is hard for a small firm with few staff. From 250063_SOW.pdf
- Worth checking: Bonding and offer guarantee unclear. The offer form asks you to furnish any required performance and payment bonds within 10 days of award, but the yes/no and offer guarantee boxes are not readable, so confirm with the contracting office whether bonds are needed. From Solicitation - FA813727R0002.pdf
- Worth checking: Brand-specific controls and fire alarm equipment. The HVAC controls must be Honeywell (or approved equal) to tie into the base system, and fire alarm control units must be from one named maker, which limits supplier choice and can affect price. From 2026 TAFB FIRE PROTECTION STANDARD.pdf
- Worth checking: Secure base and controlled area access. Every worker needs a Tinker AFB badge before work starts, and the attachment list includes Controlled Area Training for B9001, which adds lead time and cost. From 250063_SOW.pdf
- Worth checking: Key documents were not available for this brief. The drawings, most specification sections, liquidated damages memo, RFI responses, submittal register and the site visit meet-up file were not read, and the middle of the solicitation and SOW was cut off, so price-driving details may be missing.
- Minor: Award needs at least two acceptable proposals. The evaluation text says the lowest price among at least two technically acceptable proposals wins, and it does not say what happens if fewer than two proposals are acceptable. From Solicitation - FA813727R0002.pdf
- Minor: Submission method not clear. The offer form talks about sealed offers delivered to a place in Item 8 (left blank), while the cost proposal is to be e-mailed and the notice only gives e-mail addresses, so ask the contracting officer how to deliver each volume. From Solicitation - FA813727R0002.pdf
Read from the notice and 12 attachments. 123 of 135 not read. Show which files.
- Solicitation - FA813727R0002.pdf (read)
- 250063_SOW.pdf (read)
- SOW Att 04_Automated Casting Cell.pdf (read)
- SOW Att 02c_Controlled Area Training - Certificate.pdf (read)
- 250063_ATT 9_SOW.pdf (read)
- 2020 TAFB Facility Standard.pdf (read)
- 2026 TAFB Mechanical Standard_signed.pdf (read)
- 2026 TAFB Electrical Standard - Signed.pdf (read)
- 2026 TAFB FIRE PROTECTION STANDARD.pdf (read)
- 23 09 23.02.pdf (read)
- 22 00 00.pdf (read)
- 23 31 13.00 40.pdf (read)
- SOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- SOW Att 02a_Controlled Area Training.pptx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Site Visit Meet Up Location.png: not read (the AI doesn't read this file type yet): open it on SAM.gov
- 23 08 00.pdf: not summarized: open it on SAM.gov
- 23 00 00.pdf: not summarized: open it on SAM.gov
- 21 13 13.pdf: not summarized: open it on SAM.gov
- 23 07 00.pdf: not summarized: open it on SAM.gov
- 23 36 00.00 40.pdf: not summarized: open it on SAM.gov
- 23 05 48.00 40.pdf: not summarized: open it on SAM.gov
- 23 05 15.pdf: not summarized: open it on SAM.gov
- 09 67 23.15.pdf: not summarized: open it on SAM.gov
- 23 09 13.pdf: not summarized: open it on SAM.gov
- 09 90 00.pdf: not summarized: open it on SAM.gov
- 26 20 00.pdf: not summarized: open it on SAM.gov
- 10 14 00.10.pdf: not summarized: open it on SAM.gov
- 08 81 00.pdf: not summarized: open it on SAM.gov
- 08 51 23.pdf: not summarized: open it on SAM.gov
- 08 11 13.pdf: not summarized: open it on SAM.gov
- 08 33 23.pdf: not summarized: open it on SAM.gov
- 07 92 00.pdf: not summarized: open it on SAM.gov
- 07 14 00.pdf: not summarized: open it on SAM.gov
- 08 71 00.pdf: not summarized: open it on SAM.gov
- 23 03 00.pdf: not summarized: open it on SAM.gov
- 23 05 93.pdf: not summarized: open it on SAM.gov
- 10 14 00.20.pdf: not summarized: open it on SAM.gov
- 10 22 13.pdf: not summarized: open it on SAM.gov
- 05 40 00.pdf: not summarized: open it on SAM.gov
- 07 84 00.pdf: not summarized: open it on SAM.gov
- 28 31 76.pdf: not summarized: open it on SAM.gov
- 10 44 16.pdf: not summarized: open it on SAM.gov
- 07 21 16.pdf: not summarized: open it on SAM.gov
- 03 01 00.pdf: not summarized: open it on SAM.gov
- 23 64 26.pdf: not summarized: open it on SAM.gov
- 05 05 23.16.pdf: not summarized: open it on SAM.gov
- 06 41 16.00 10.pdf: not summarized: open it on SAM.gov
- 00 72 00.pdf: not summarized: open it on SAM.gov
- 01 78 00.pdf: not summarized: open it on SAM.gov
- 00 71 00.pdf: not summarized: open it on SAM.gov
- 00 70 00.pdf: not summarized: open it on SAM.gov
- 01 33 00.pdf: not summarized: open it on SAM.gov
- 01 45 00.00 10.pdf: not summarized: open it on SAM.gov
- 01 78 23.pdf: not summarized: open it on SAM.gov
- 01 50 00.pdf: not summarized: open it on SAM.gov
- 01 32 16.00 20.pdf: not summarized: open it on SAM.gov
- 01 42 00.pdf: not summarized: open it on SAM.gov
- 00 80 05.pdf: not summarized: open it on SAM.gov
- 01 33 16.00 10.pdf: not summarized: open it on SAM.gov
- 00 80 00.pdf: not summarized: open it on SAM.gov
- UMRL.pdf: not summarized: open it on SAM.gov
- ERDCITL_TR12-1_r2.pdf: not summarized: open it on SAM.gov
- ERDCITL_TR12-6_r6.pdf: not summarized: open it on SAM.gov
- ufc_3_260_01_2019_c1.pdf: not summarized: open it on SAM.gov
- ufc_3_535_01_2017_c4.pdf: not summarized: open it on SAM.gov
- tinkerafb_INRMP.pdf: not summarized: open it on SAM.gov
- EM_385-1-1.pdf: not summarized: open it on SAM.gov
- ufc_3_600_01_2016_c6.pdf: not summarized: open it on SAM.gov
- tinkerafb_INRMP_App G.pdf: not summarized: open it on SAM.gov
- dafman91-203.pdf: not summarized: open it on SAM.gov
- dafi21-101_afmcsup_afmcgm2023-01.pdf: not summarized: open it on SAM.gov
- afi91-202_afmcsup.pdf: not summarized: open it on SAM.gov
- dafi21-101.pdf: not summarized: open it on SAM.gov
- ufc_3_260_04_2018.pdf: not summarized: open it on SAM.gov
- ufc_3_601_02_2021.pdf: not summarized: open it on SAM.gov
- dafi91-202.pdf: not summarized: open it on SAM.gov
- tinkerafbi13-204.pdf: not summarized: open it on SAM.gov
- afman32-7003.pdf: not summarized: open it on SAM.gov
- dafi13-213.pdf: not summarized: open it on SAM.gov
- afman40-201.pdf: not summarized: open it on SAM.gov
- tinkerafb_HWMP.pdf: not summarized: open it on SAM.gov
- afman48-148.pdf: not summarized: open it on SAM.gov
- dafi13-213_tinkerafbsup.pdf: not summarized: open it on SAM.gov
- TAFB_SOP_outages_v2.pdf: not summarized: open it on SAM.gov
- afman91-203_oc-alcsup.pdf: not summarized: open it on SAM.gov
- afi48-104.pdf: not summarized: open it on SAM.gov
- tinkerafb_INRMP_App E.pdf: not summarized: open it on SAM.gov
- tinkerafbi21-100.pdf: not summarized: open it on SAM.gov
- dodio-2000.16v1_afi10-245-o.pdf: not summarized: open it on SAM.gov
- 007200_Attch13_AF487.pdf: not summarized: open it on SAM.gov
- 013300_Attch1_TAFBF3000.pdf: not summarized: open it on SAM.gov
- 007100_Attch1_Airfield Construction Waiver.pdf: not summarized: open it on SAM.gov
- 007200_Attch14_Information for New Boilers.pdf: not summarized: open it on SAM.gov
- 017800_Attch1_DD1354.pdf: not summarized: open it on SAM.gov
- 007200_Attch9_EMS Awareness Training.pdf: not summarized: open it on SAM.gov
- 007200_Attch7a_AF3952.pdf: not summarized: open it on SAM.gov
- 017800_Attch2_DD1354 Checklist.docx: not summarized: open it on SAM.gov
- image.png: not read (the AI doesn't read this file type yet): open it on SAM.gov
- image (1).png: not read (the AI doesn't read this file type yet): open it on SAM.gov
- HELICAL PILES NOTES.docx: not summarized: open it on SAM.gov
- Room finish schedule.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Door_Window_Schedule.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- JOIST SPECIAL INSPECTIONS.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- PILE SCHEDULE.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- ELECTRICAL PANEL SCHEDULE U18L.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- 250063_ Redline A-502.pdf: not summarized: open it on SAM.gov
- esvperf_singledual_2023_V2.pdf: not summarized: open it on SAM.gov
- z415-bz1.pdf: not summarized: open it on SAM.gov
- esvEH_singledual_2023_V2.pdf: not summarized: open it on SAM.gov
- lrad331965pd_spec.pdf: not summarized: open it on SAM.gov
- REACT VII SA-01.pdf: not summarized: open it on SAM.gov
- lk406gn05t4_spec.pdf: not summarized: open it on SAM.gov
- z400i.pdf_safe.pdf: not summarized: open it on SAM.gov
- TAFB B9001 VAV Schedule.pdf: not summarized: open it on SAM.gov
- ELECTRICAL COMBINED.pdf: not summarized: open it on SAM.gov
- ARCH-COMBINED.pdf: not summarized: open it on SAM.gov
- 4500-S.pdf: not summarized: open it on SAM.gov
- 4500-CIVIL.pdf: not summarized: open it on SAM.gov
- 4500-MUG.pdf: not summarized: open it on SAM.gov
- overall plan 04.15.2021.pdf: not summarized: open it on SAM.gov
- 250063_ATT 14_Prebid RFI Responses Round 2.pdf: not summarized: open it on SAM.gov
- 250063_ATT 13_Prebid RFI Responses Round 1.pdf: not summarized: open it on SAM.gov
- 250063_ATT 8_Liquidated Damages.pdf: not summarized: open it on SAM.gov
- 250063_ATT 6_OPSEC Review Memo.pdf: not summarized: open it on SAM.gov
- 250063_ATT 4_ODS.pdf: not summarized: open it on SAM.gov
- 250063_ATT 3_RMDF.pdf: not summarized: open it on SAM.gov
- 250063_ATT 10_Submittal Register.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- 250063_ATT 10_Submittal Register.pdf: not summarized: open it on SAM.gov
- HAZMAT Reporting at Tinker AFB FEB 2025.pdf: not summarized: open it on SAM.gov
- 007000_Attch1_TAFB Outage Request Form.pdf: not summarized: open it on SAM.gov
- 007200_Attch7b_Monthly Hazardous Usage Report.pdf: not summarized: open it on SAM.gov
- 250063_ATT 11_Drawings.pdf: not summarized: open it on SAM.gov
- DESV_Submittal.pdf: not summarized: open it on SAM.gov
- HE05IN_Dimension_Drawing.pdf: not summarized: open it on SAM.gov
- 220042 As Built Drawings.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Design and build a new React VII facility in Building 9001 at Tinker AFB (hybrid design-build: contractor furnishes all design, labor, tools, equipment and materials except Government-furnished materials)
- Perform a site investigation to verify existing conditions, then complete the design and construction work shown in the drawing index (structural, architectural, mechanical, plumbing, electrical, fire protection, demolition)
- Install HVAC controls (Honeywell or approved equal) tied into the base-wide controls network, plus fire alarm and mass notification work
- Run a contractor quality control program and a site safety and health program (EM 385-1-1) with named key personnel on site
- Handle submittals, a construction schedule, outage and permit requests, and Government approvals that need lead time
- Get all workers badged for Tinker AFB access before starting work
- Deliver closeout items: test reports, operation and maintenance data, record drawings, and warranty support
- Contract type
- Firm-fixed-price (two line items, each 1 Each); hybrid design-build construction
- Period of performance
- 240 calendar days from receipt of Notice to Proceed; no option periods stated
- Place of performance
- Building 9001, Tinker AFB, OK 73145
- Estimated value
- Not stated
- How they'll choose
- Lowest Price Technically Acceptable (LPTA). Offers must be rated acceptable on every technical subfactor, and only low-risk approaches count as acceptable; the lowest price among the acceptable proposals wins.
- Offers due
- Nov 2, 2026 at 2:00 PM local time (notice shows 14:00 at UTC-06:00) (from the version posted Oct 5, 2026; amended since)
- How to submit
- The cost portion of the proposal goes by e-mail (DFARS 252.215-7012 says E-Mail). How the technical volume is delivered is not stated in the text provided. Contracting contacts: isaac.demmers@us.af.mil and tamra.torres@us.af.mil
What they'll judge offers on
- Contractor responsibility check in SAM
- Technical Subfactor 1: Capability and Management (acceptable or unacceptable)
- Technical Subfactor 2: Schedule and Planning (acceptable or unacceptable)
- Price: electronic cost model breakdown in unlocked Excel, by CSI division or salient features of work (technical is pass/fail, price decides)
What to include when you submit
- Before bidding: email an RSVP for the Initial Site Visit to SSgt Isaac Demmers (isaac.demmers@us.af.mil) and CC Tamra Torres (tamra.torres@us.af.mil) within 5 calendar days of the Oct 5, 2026 posting (about Oct 10, 2026)
- With the RSVP, say whether everyone attending has base access; if not, send the Entry Access List (EAL) so the Air Force can count who needs base access
- Attend the Initial Site Visit on Thursday, Oct 15, 2026 at 0900 CST, meeting at the northwest parking lot of Building 9001
- Send a technical volume covering Capability and Management and Schedule and Planning (including a construction schedule that meets the mandatory completion date)
- Send an electronic cost model breakdown in an unlocked Microsoft Excel file, broken out by CSI division or salient features of work
- Complete and sign the SF 1442 offer pages (offer terms, amendment acknowledgments); offers must stay open for the acceptance period the form sets at 120 days
- If bonds are required, performance and payment bonds are due within 10 calendar days after award (the form's yes/no box is not readable in the text)
Not in the notice text
- Estimated contract value or price range (not stated)
- Whether performance and payment bonds and an offer guarantee are required (form boxes unreadable)
- How and where the technical volume must be delivered, and any page limits or volume format (Section L instructions were not in the text provided)
- Liquidated damages rate (attachment 8 was not read)
- Answers to pre-bid questions (RFI responses round 1 and 2 were not read) and the full drawings and specification sections
- Details of the Initial Site Visit meet-up point (image file not read) and how the Air Force handles base access for visitors
- Wage rate and labor clauses, and other Section I clauses (the middle of the solicitation was cut off)
- Details in the middle of the SOW that were cut off, such as schedule, submittal and closeout requirements
- Whether any minimum number of technically acceptable offers is needed before an award is made
More to check before you bid
Notice details
Notice type, codes, versions and files
- Posted
- Oct 5, 2026
- Notice type
- Solicitation
- Office
- FA8137 AFSC PZIOC, Tinker AFB, OK
- Product/service code
- Z1AA · Maintenance of Office Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
4 versions have been posted, newest first.
- Nov 23, 2026 · Amendment 0003Due Dec 18, 2026 (changed)
- Nov 2, 2026 · Amendment 0002Due Nov 23, 2026 (changed)
- Oct 15, 2026 · Amendment 0001Due Nov 2, 2026
- Oct 5, 2026 · Solicitation (this version)Due Nov 2, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Open WOSB set-aside contracts
Terms on this notice: Solicitation, WOSB (women-owned small business), Set-aside