Electrical Upgrades to Support Future Three-Phase Power Supply Service at Lac qui Parle Dam near Watson, MN
Department of Defense · Department of the Army
AI summaryThe Army Corps of Engineers (USACE), St. Paul District, is doing market research (sources sought W912ES27SS0001) for electrical upgrades at Lac qui Parle Dam near Watson, MN, to prepare for future three-phase power. The work is new utility poles, three 480-volt transformers and metering, a new service panel, and removing the old single-phase feed. The estimated magnitude is $30,000 to $70,000; capability statements are due November 19, 2026, 5:00 PM Central. More in the summary
Market research, not a bid. Replying is free and tells Department of the Army who could do this work. Send a short reply to the contracting contact; no price is needed. See the contact
AI summary Beta
The Army Corps of Engineers (USACE), St. Paul District, is doing market research (sources sought W912ES27SS0001) for electrical upgrades at Lac qui Parle Dam near Watson, MN, to prepare for future three-phase power. The work is new utility poles, three 480-volt transformers and metering, a new service panel, and removing the old single-phase feed. The estimated magnitude is $30,000 to $70,000; capability statements are due November 19, 2026, 5:00 PM Central.
Who can bid
- Capacity to perform licensed electrical construction work in Minnesota
How to submit: Email to Justin Rose (justin.h.rose@usace.army.mil) and Sharon Frank-Scheierl (sharon.m.frank-scheierl@usace.army.mil). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch
From the version posted Nov 10, 2026.
- Worth checking: Minnesota electrical license. Responders must confirm they can do licensed electrical construction work in Minnesota.
- Worth checking: Recent similar projects needed. At least two similar projects from the last five years must be shown.
- Minor: Utility coordination. Work must be coordinated with the local utility, which may affect schedule and outages.
Read from the notice text only.
Full summary
What they want
- Supply and install multiple utility poles and three (3) 480-volt transformers with metering on the final pole near the dam
- Connect an existing 480-volt three-phase source to a new service/distribution panel
- Keep the existing 120/240-volt single-phase transformer feeding lighting, the gage house and toilet area
- Disconnect the existing single-phase feed and demolish and cut existing conduit and conductors
- Coordinate easements with USACE and Lac qui Parle County, and metering and power with MN Valley Light and Power
- Testing, grounding, submittals and state inspection, with possible tree and brush removal
- Place of performance
- Lac qui Parle Dam, Watson, MN 56295
- Estimated value
- Estimated magnitude between $30,000.00 and $70,000.00
- Offers due
- November 19, 2026, 5:00 PM Central
- How to submit
- Email to Justin Rose (justin.h.rose@usace.army.mil) and Sharon Frank-Scheierl (sharon.m.frank-scheierl@usace.army.mil)
- Page limits
- Capability statement: 2 pages, not counting attachments like letters of commitment
What to include when you submit
- Subject line: "Sources Sought Response: Notice ID W912ES27SS0001 - [Your Company Name]"
- Give firm name, address and point of contact, SAM Unique Entity ID (UEI) and CAGE code, and size and socioeconomic status under NAICS 237130
- Confirm capacity to perform licensed electrical construction work in Minnesota
- Send at least two (2) similar projects completed within the last five (5) years, with title, location, contract number and type, values, dates, prime or sub role, percent self-performed and a customer contact
- Say whether you can self-perform the principal electrical work
- State interest in a site visit and any concerns with scope, schedule, utility coordination, outages or permitting
- Do not send marketing materials or a proposal
Not in the notice text
- Whether there will be a site visit is not stated; the notice says any solicitation will give site-visit information
- Which wage rule applies (a Davis-Bacon wage determination) is not stated
- Period of performance and outage requirements are not stated
- Whether the future buy will be set aside for small businesses is still being decided
Eligibility and how to respond
- No set-aside. Any business can reply: this is market research, and no bid is being taken yet.
- To respond, send a short reply to the contracting contact near the top of this page. No price is needed.
- Construction contracts over $2,000 pay at least the local Davis-Bacon wage rates, from the wage determination in the solicitation. Price your labor from it: How to price a government contract, and how Davis-Bacon differs from the Service Contract Act.
Notice details
- Posted
- Nov 10, 2026
- Notice type
- Sources Sought
- Office
- W07V ENDIST St Paul, Saint Paul, MN
- Product/service code
- Y1PZ · Construction of Other Non-Building Facilities
- Business type
- Energy, fuel & utilities (FedReady's grouping, from NAICS 237130)
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
Terms on this notice: Sources sought notice
Full notice text from SAM.gov
Similar open opportunities
- P210 Electric Power Plant and Electrical Distribution System at Chabelley Airfield, DjiboutiThis is a presolicitation (an early notice, not yet the request for proposals) from the Navy's Naval Facilities Engineering Systems Command Atlantic to build a power plant and…
- DLA DWCF B1907 Backup Power Generator, Yokosuka, Japan
- Kautz Road Substation Construcion, Uip Subproject 2- KRS
- COTP Series Capacitor Two-Phase Design Build
- FCI Three Rivers-Replace Generators, Transformers, and Electrical InfrastructureOnly 8(a) small businesses (firms in the SBA's 8(a) business development program) can bid on this Federal Bureau of Prisons job to replace generators, transformers and electrical…