Solicitation
Amendment 0002 Y1DZ--36C261-28-AP-0022 | 612-27-1-6009-0001 | Construct Modular Imaging Center in Stockton | 612A4-CSI-002
Department of Veterans Affairs
AI summaryOnly service-disabled veteran-owned small businesses (SDVOSB) verified in the Small Business Administration's (SBA) VetCert database can quote. The Department of Veterans Affairs (VA) wants a modular MRI and CT imaging building constructed at the VA clinic in French Camp, California, for VA Northern California Health Care System. Amendment 0002 suspended this request for quotes (RFQ) because of a design change, so no quotes are accepted until revised documents are posted. More in the summary
Paused. The AI summary says the buy is on hold: Solicitation suspended; response due date to be reset. This date may change; check SAM.gov for updates.
AI summary Beta
This summary may miss requirements: 3 of 11 attachments weren't read (Attachment - Specifications 06-17-26.pdf, Attachment - Pre-Quote Site Visit Sign In Sheet 36C26127Q0029 09-29-2026.pdf and 1 more). Check the attachments on SAM.gov.
Only service-disabled veteran-owned small businesses (SDVOSB) verified in the Small Business Administration's (SBA) VetCert database can quote. The Department of Veterans Affairs (VA) wants a modular MRI and CT imaging building constructed at the VA clinic in French Camp, California, for VA Northern California Health Care System. Amendment 0002 suspended this request for quotes (RFQ) because of a design change, so no quotes are accepted until revised documents are posted.
Who can bid
- Be a service-disabled veteran-owned small business (SDVOSB) verified in SBA VetCert and have an active System for Award Management (SAM.gov) registration at the time of submission. The VA rejects a quote if SDVOSB or veteran-owned status cannot be verified at submission and before award.
- Submit a bid bond (bid guarantee) with the quote, by the quote due date and time.
How to submit: Email only, one electronic copy under 10MB, to David Rovner (david.rovner@va.gov) and Charee Harris (charee.harris@va.gov). Faxed or mailed quotes are not permitted.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
From the version posted Oct 15, 2026.
- Serious: Only SDVOSB firms can bid. This is a total set-aside for service-disabled veteran-owned small businesses verified in SBA VetCert, and other firms are not eligible to submit a quote.
- Serious: Bid bond, payment bond and performance bond all required. A construction contract of this size needs a surety (bonding company) willing to issue a bid bond with the quote and payment and performance bonds after award.
- Worth checking: Only quotes on the revised documents count. A quote built on the earlier documents will not be considered, and the VA will not say when the revised documents will be posted.
Show all 9Show fewer
- Worth checking: Price Breakdown Sheet is mandatory. The sheet must price the general contractor and every subcontractor, with third-party inspections as a line item. A missing or incomplete sheet removes the quote from consideration.
- Worth checking: Contractor pays for third-party inspections and commissioning. The VA does no inspections for the contractor. You must hire third-party inspectors and commissioning help and price them in.
- Worth checking: Subcontracting limits certificate required. The signed VAAR 852.219-75 certificate shows the firm will keep enough of the work in-house, as VA set-asides require. Leaving it out may remove the quote.
- Worth checking: Past Performance Questionnaires must reach the VA on time. Your references must return the questionnaire themselves by the quote due date and time, so they need to be contacted early.
- Minor: The site visit was Sep 29, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered.
- Minor: Davis-Bacon wage determination CA20260018 applies. Davis-Bacon wage determinations set the minimum pay rates for construction workers, and your price must use them.
Read from the notice and 8 attachments. 3 of 11 not read. Show which files.
- S06 36C26127Q0029 0002 10-15-2026.pdf (read)
- S06 36C26127Q0029 0001 09-30-2026.docx (read)
- S02 36C26127Q0029 Final Clearance.docx (read)
- ATTACHMENT B - FACTOR 2 - Key Personnel.docx (read)
- Attachment - Pricing Breakdown 36C26127Q0029.docx (read)
- Attachment - REQUEST FOR INFORMATION RFI FORM 36C26127Q0029.docx (read)
- ATTACHMENT C - FACTOR 3 - Past Performance Questionnaire.docx (read)
- Attachment - Wage Determination CA20260018 07-14-2026.pdf (read)
- Attachment - Specifications 06-17-26.pdf: not read (it couldn't be opened): open it on SAM.gov
- Attachment - Pre-Quote Site Visit Sign In Sheet 36C26127Q0029 09-29-2026.pdf: not summarized: open it on SAM.gov
- Attachment - Stamped Drawings 06-17-26.pdf: not read (it couldn't be opened): open it on SAM.gov
Full summary
What they want
- Build a new one-story, 2,500-square-foot modular imaging center for MRI (magnetic resonance imaging) and CT (computed tomography) scanners at the Richard A. Pittman VA Clinic, French Camp, CA
- Prepare the site: demolition, foundations, roadway, parking and walkway changes, and utility connections and relocations
- Install the building's mechanical, electrical, plumbing, fire protection, fire alarm, telecommunications and security systems, and tie them into the campus systems
- Leave the MRI and CT rooms as unfinished shell space; the VA furnishes and installs the imaging equipment, shielding and finishes there
- Pay for and arrange third-party inspections, testing and commissioning of the building systems
- Keep Level IV infection control (strict dust and contamination barriers) and VA security rules in place during construction
- Finish all work within 557 calendar days after the notice to proceed (NTP: the order to start work)
- Contract type
- Firm-fixed-price (FFP): one set price, whatever the work ends up costing. One construction contract will be awarded.
- Period of performance
- 557 calendar days from the notice to proceed
- Place of performance
- Richard A. Pittman VA Clinic, 6505 S. Manthey Road, French Camp, CA 95231
- Estimated value
- Magnitude of the project stated as between $5,000,000.00 and $10,000,000.00 (FAR 36.204 range, not a Government estimate)
- How they'll choose
- Comparative analysis of non-price factors and price, with award to the quote offering the best value to the Government. The Government intends to award without discussions but may hold them.
- Offers due
- December 4, 2026, 12:00 PM Pacific
- How to submit
- Email only, one electronic copy under 10MB, to David Rovner (david.rovner@va.gov) and Charee Harris (charee.harris@va.gov). Faxed or mailed quotes are not permitted.
What they'll judge offers on
- Technical quote: Technical Approach, Key Personnel (Factor 2), Past Performance (Factor 3), Project Schedule, Corporate Project Experience Information
- Price: the Price Breakdown Sheet for the general contractor and all subcontractors
What to include when you submit
- Use the revised solicitation documents once posted. Amendment 0002 says quotes built on the outdated documents will not be considered.
- Send the technical quote, price quote and bid guarantee together by email. Subject line: RFQ No. 36C26127Q0029 - Project No. 612A4-CSI-002, Title: Construct Modular Imaging Center, French Camp, CA - Open Market.
- Include all pages of the solicitation with the quote. No partial submissions are accepted.
- Acknowledge every amendment by its number and posting date, in block 19 of the SF 1442 or on the amendment form (SF 30).
- Price quote: a completed and signed Standard Form 1442 (the construction offer form) with the quote amount in block 17, and a fully completed Price Breakdown Sheet covering the general contractor and all subcontractors. Third-party inspections must be a line item.
- Technical quote: Technical Approach, Key Personnel, Past Performance, Project Schedule and Corporate Project Experience Information, plus completed Attachment B (Key Personnel) and Attachment C (Past Performance Questionnaire).
- Key personnel: show the Project Manager, Project Superintendent, Safety Officer and Quality Control Manager. List up to three projects completed by each within the past five years, and show each person's years of experience separately rather than combined.
- Past Performance Questionnaire: references return it by the quote due date and time to the two email addresses above.
- Include a signed VAAR 852.219-75 certificate (the VA limits-on-subcontracting certificate for construction).
- Include a bid bond scanned so the raised seal is clearly visible.
After award, you must have
- Furnish payment and performance bonds after award. The SF 1442 text says the successful contractor submits the payment bond and a certificate of insurance within 10 calendar days of award, and only emailed bonds are accepted. From S02 36C26127Q0029 Final Clearance.docx:
Bid Bonds, Payment Bonds, and Performance Bonds are all required.
Not in the notice text
- Text is incomplete: the middle of the main solicitation file (S02 36C26127Q0029 Final Clearance.docx) was left out, and the specifications and stamped drawings are attached but not read. The revised solicitation documents are not yet posted.
- The revised response due date and what the design change alters (scope, drawings, price) are not stated; the VA will post another amendment with them.
- The order of importance of the evaluation factors and the rating details were not in the text read.
- The site visit sign-in sheet is a scanned file that was not read.
- The wage determination file was only partly read; check it on SAM.gov for the trade rates.
Notice details
- Posted
- Oct 15, 2026
- Notice type
- Solicitation
- Office
- 261-Network Contract Office 21 (36C261), Mather, CA
- Product/service code
- Y1DZ · Construction of Other Hospital Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
4 versions have been posted, newest first.
- Oct 15, 2026 · Amendment 0002 (this version)Paused, was due Dec 4, 2026 (changed)
- Sep 30, 2026 · Amendment 0001Due Oct 21, 2026
- Sep 21, 2026 · SolicitationDue Oct 21, 2026 (changed)
- Aug 26, 2026 · PresolicitationDate Sep 9, 2026
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Open SDVOSB set-aside contracts
Terms on this notice: Solicitation, SDVOSB (service-disabled veteran-owned small business), Set-aside
Full notice text from SAM.gov
Similar open opportunities
- 662-27-113 | Construct BLDG 40 Impact Completion Items
- Solicitation: Construct Combat Rescue Helicopter Flight Simulator Facility at Moffett ANGBThe USPFO for California (the Army National Guard's property and fiscal office) plans one firm-fixed-price (FFP: one set price, whatever the work ends up costing) contract to…
- 605-341 - Relocate Dialysis Minor Construct - Loma Linda, CA
- Construct North Unit Visitor Center at BADLThe National Park Service wants one firm to build a new North Unit Visitor Center at Badlands National Park, South Dakota, under a sealed-bid invitation for bid (IFB): one…
- Construct Private Offices in Building 403Only women-owned small businesses (WOSBs) can get the request for quote (RFQ) for this minor construction job at DLA Distribution Susquehanna in New Cumberland, Pennsylvania:…