Sources Sought
422 FSS Raf Fairford Cafe
Department of Defense · Department of the Air Force
Response due Dec 13, 2026 · Raf Fairford, United Kingdom
Market research, not a bid. Replying is free and tells Department of the Air Force who could do this work. Send a short reply to the contracting contact; no price is needed. See the contact
AI summary Beta
The notice looks incomplete: The specifications for Tasks 3 to 5 (fire alarm device, wiring and outlets, HVAC) and the pad's location drawing (section 6 is blank) are not in the documents read. Check the attachments on SAM.gov.
Sources sought FA557027Q0002 from the Air Force's 501st Combat Support Wing, which is checking the market for a modular café and library building at RAF Fairford, United Kingdom. It is market research only, not a solicitation, and no quote is requested. The work covers a concrete pad, a prefabricated modular building with a commercial kitchen, a fire alarm device, wiring and heating, ventilation and air conditioning (HVAC). Replies go by email; SAM.gov and the form give different response due dates.
Who can bid
- Engineers who commission the kitchen and catering equipment must be GasSafe and F-Gas registered (UK registrations for gas and refrigerant-gas work) From Attachment-2- Statement of Works Modular Facility.pdf
- Mechanical and electrical (M&E) work must be done by RAF Fairford approved engineers holding a valid skilled person certificate from the base's Authorised Person From Attachement - 3 Statement of Requirements Concrete Pad.pdf
How to submit: Email to MSgt Falkner at jason.falkner@us.af.mil and Calin Moloiu at calin.moloiu.gb@us.af.mil, due December 13, 2026, 2:00 PM GMT (9:00 AM Eastern) on SAM.gov; the sources sought form says 14:00 GMT 13 Dec 2025. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
From the version posted Nov 13, 2026.
- Serious: UK-based trade registrations and base approvals required. A U.S. small business without GasSafe and F-Gas registered engineers or RAF Fairford approved M&E engineers would need a UK partner or subcontractor. From Attachment-2- Statement of Works Modular Facility.pdf
- Worth checking: Sources sought only, not a solicitation. No quote is requested and no award follows from this notice; a later solicitation may change the scope, set-aside or terms. From Attachement 1 - Sources Sought RAF Fairford Cafe.pdf
- Worth checking: Whole requirement bundled into one quote. The form asks if one firm can quote all five tasks (pad, modular building, fire alarm, wiring, HVAC), which may call for subcontractors and UK trades. From Attachement 1 - Sources Sought RAF Fairford Cafe.pdf
Show all 9Show fewer
- Worth checking: Permanent versus temporary building. The statement of work calls for a permanent modular café building, while Task 2 of the sources sought asks for a temporary modular facility. From Attachement 1 - Sources Sought RAF Fairford Cafe.pdf
- Worth checking: Foundations listed as both included and excluded. The statement of work lists groundworks with a concrete foundation as a quantity, yet excludes enabling works such as foundations. Ask who builds the foundation under which task. From Attachment-2- Statement of Works Modular Facility.pdf
- Worth checking: Design liability with a firm price set before site conditions are known. The contractor owns the design, must verify the site itself, and the Air Force pays nothing extra for needs found after the surveys. From Attachement - 3 Statement of Requirements Concrete Pad.pdf
- Worth checking: Base access lead time of 6 months. Base security clearance applications must go in at least 6 months before unescorted access, and ACL approval is valid for 6 months, which affects the schedule. From Attachement - 3 Statement of Requirements Concrete Pad.pdf
- Minor: Work outside normal hours costs extra. Work must fit Monday to Friday, 0800 to 1700 UK time; other hours are charged through a cost variation. From Attachment-2- Statement of Works Modular Facility.pdf
- Minor: VAT excluded from the price. The statement of work lists VAT, the UK sales tax, under exclusions, so UK tax handling should be confirmed. From Attachment-2- Statement of Works Modular Facility.pdf
Read from the notice and 3 attachments. Show which files.
- Attachment-2- Statement of Works Modular Facility.pdf (read)
- Attachement 1 - Sources Sought RAF Fairford Cafe.pdf (read)
- Attachement - 3 Statement of Requirements Concrete Pad.pdf (read)
Full summary
What they want
- Task 2: provide and install a pre-engineered modular facility that works as a community hub with a library and café
- Statement of work: design, manufacture, deliver, install, commission and hand over one (1) permanent modular café building with an integrated commercial kitchen (Quantity One (1) Each), sized for 3 cooks serving 10 customers at a time
- Groundworks for the building (Quantity One (1) Each): surveys, excavation, drainage, ducts, connections to electrical and water mains, soft landscaping and a concrete foundation
- Task 1: design and construct a concrete pad of 2,301 (214 square meters) for the modular building, starting with a feasibility report and ending in a 100% design and firm price
- Catering equipment, including an undercounter dishwasher, electric fryer, 600 liter refrigerator and 600 liter freezer, plus user guides and training
- Task 3: install a new fire alarm notification device that works with the existing Monaco Fire Alarm Notification System
- Tasks 4 and 5: wire the modular office with wiring and outlets, and install an HVAC system, both as the Government specifies
- Warranties: 15-year structural warranty and 12-month parts and labor warranty; sample program of about 14 weeks from order to completion
- Contract type
- Not stated (sources sought notice). The concrete pad statement asks for a firm/fixed price construction cost.
- Period of performance
- No contract period stated. Sample timeline: about 14 weeks from order to handover; installation target of 15 working days.
- Place of performance
- RAF Fairford, GB-WBK, GBR (outside the United States)
- Estimated value
- Not stated
- Offers due
- December 13, 2026, 2:00 PM GMT (9:00 AM Eastern) on SAM.gov; the sources sought form says 14:00 GMT 13 Dec 2025
- How to submit
- Email to MSgt Falkner at jason.falkner@us.af.mil and Calin Moloiu at calin.moloiu.gb@us.af.mil
What to include when you submit
- Answer the form's questions: company name, address, phone number, email address and Commercial and Government Entity (CAGE) code
- Say yes or no: could you quote the whole requirement, including the listed specifications?
- Say yes or no: will a subcontractor be used?
- State your typical lead time for the product and installation
- Mark any proprietary information clearly; replying is strictly voluntary and respondents are not told the outcome
After award, you must have
- Workers on the job site need Access Control List (ACL) approval for base entry, which can take a month or more From Attachement - 3 Statement of Requirements Concrete Pad.pdf:
ACL (Access Control List) approval will need to be submitted via DIO for all contractors on the…
Not in the notice text
- The specifications for Tasks 3 to 5 (fire alarm device, wiring and outlets, HVAC) and the pad's location drawing (section 6 is blank) are not in the documents read.
- The set-aside is not stated on SAM.gov, and no site visit is mentioned.
- The documents do not say whether a UK office or presence, host-country licenses or registrations are required.
- The documents do not say what currency quotes should use or how exchange rates are handled.
- The pad area is written as 2,301 (214 square meters) with no unit given for 2,301.
- The Government's budget or estimate is not given.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 13, 2026
- Notice type
- Sources Sought
- Office
- FA5570 501 CSW RCO
- Product/service code
- 5410 · Prefabricated and Portable Buildings
- Business type
- Manufactured parts & equipment (FedReady's grouping, from NAICS 332999)
- Versions
2 versions have been posted, newest first.
- Nov 13, 2026 · Amendment 0001 (this version)Due Dec 13, 2026
- Nov 13, 2026 · Sources SoughtDue Dec 13, 2026
- Attachments
Before you respond
Terms on this notice: Sources sought notice
Full notice text from SAM.gov
Similar open opportunities
- Solicitation Number 390565 “lot 2 Bubbler Assemblies for Hanford WTP Law Melter”Hanford Tank Waste Operations & Closure, LLC (H2C), a Department of Energy contractor, is asking for proposals for Lot 2 bubbler assemblies for the Hanford Waste Treatment Plant…
- Solicitation Number 75389 “TX-Farm Corrugated Metal Pipe Covers"Hanford Tank Waste Operations & Closure LLC (H2C), a Department of Energy contractor, is asking for proposals for TX-Farm corrugated metal pipe covers.
- GVSC Build To Print Procurement
- Solicitation Number 387862-1414 "law Melter Discharge Chamber Thermocouples and Thermowells"
- Hose Assembly, NonmetalThe Defense Logistics Agency (DLA) office DLA WEAPONS SUPPORT wants quotes on national stock number (NSN: the federal catalog number for a part) 4720011296081, HOSE…