Summary of the version posted Nov 16, 2026. The notice was amended Nov 23, 2026. The due date moved from Nov 24, 2026 to Dec 1, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 28 of 40 attachments weren't read (Amendment 0002 - N4008526R0178.pdf, Amendment 0004 PPI Responses.pdf and 26 more). Check the attachments on SAM.gov.
Solicitation N4008526R0178 from NAVFAC Mid-Atlantic (Navy) for a design-bid-build (the Navy supplies the design, you build it) torpedo integration laboratory, P084, at Naval Station Newport, RI: a 12,920 SF steel-frame lab and office building, plus options including a second 17,978 SF lab (P1016). It is open to all businesses (full and open competition), firm-fixed-price (FFP: one set price, whatever the work ends up costing), with a magnitude of $25,000,000 to $100,000,000. The response due date is November 24, 2026 (passed), 2:00 PM Eastern.
Who can bid (5)
- Current Cybersecurity Maturity Model Certification (CMMC) status in SPRS, with a current affirmation of continuous compliance, before award (Level 1 (Self) in the description; Level 2 (Self) in Amendment 0007's tailored clause text) From Amendment 0007 N4008526R0178.pdf
- Relevant past construction: new construction of a multi-story laboratory or industrial facility using structural steel framing; pre-engineered metal buildings do not count From Amendment 0006 PPI Responses.pdf
- Signed Project Labor Agreement with the Price Proposal (the description says offers without it are nonresponsive; Amendment 0003 deleted this item and its two clauses, so confirm with the contracting officer)
Show all 5Show fewer
- Signed bank reference and three years of financial statements showing adequate financial resources From Amendment 0003 N4008526R0178.pdf
- Insurance: employer's liability of at least $100,000, bodily injury liability of at least $500,000 per occurrence, and automobile liability From Solicitation - N4008526R0178.pdf
How to submit: due November 24, 2026, 2:00 PM Eastern. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
- Serious: Project Labor Agreement: notice and Amendment 0003 disagree. The description says a signed Project Labor Agreement must come with the Price Proposal or the offer is nonresponsive. Amendment 0003 deleted that item and clauses 52.222-33 and 52.222-34. Ask the contracting officer which governs.
- Serious: CMMC level differs between documents. The description says Level 1 (Self). Amendment 0007 carries the tailored clause and provision text at Level 2 (Self) and the standard text at Level 1 (Self). Without the required status in SPRS, a business is not eligible for award.
- Serious: Very large project. The magnitude is $25,000,000 to $100,000,000, with 901 calendar days to finish and bonds due within 10 days of award. Few small businesses can carry this size. From Solicitation - N4008526R0178.pdf
Show all 9Show fewer
- Serious: Narrow relevant-experience test. Past projects must be new multi-story steel-frame laboratory or industrial construction. The Government declined to widen this when asked and said to bid per the RFP. From Amendment 0006 PPI Responses.pdf
- Worth checking: Financial documents required with the offer. A signed bank reference and three years of financial statements are required, and the Government uses them to judge whether a business is responsible. From Amendment 0003 N4008526R0178.pdf
- Worth checking: Controlled security plan for P1016. The P1016 Construction Security Plan is marked controlled unclassified information and must be requested by email before you can price that option. From Amendment 0006 N4008526R0178.pdf
- Worth checking: Options are priced and evaluated. Price is judged on the base work plus all nine option items, including audio-visual, furniture, a second building and demolition. From Amendment 0003 N4008526R0178.pdf
- Minor: Bonded five-year roof watertightness warranty. The Government confirmed a general contractor bonded watertightness warranty of 5 years is required for the roof. From Amendment 0006 PPI Responses.pdf
- Minor: The site visit was Sep 2, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From Amendment 0001 - N4008526R0178 .pdf
Read from the notice and 12 attachments. 28 of 40 not read. Show which files.
- Solicitation - N4008526R0178.pdf (read)
- Amendment 0007 N4008526R0178.pdf (read)
- Amendment 0006 N4008526R0178.pdf (read)
- Amendment 0005 N4008526R0178.pdf (read)
- Amendment 0004 N4008526R0178.pdf (read)
- Amendment 0003 N4008526R0178.pdf (read)
- Amendment 0001 - N4008526R0178 .pdf (read)
- NUWC P-1016 - Specifications.pdf (read)
- NUWC P084 - Specifications.pdf (read)
- Amendment 0006 PPI Responses.pdf (read)
- P-084 Amendment 0006 - Continuation.pdf (read)
- P-1016 Amendment 0006 - Continuation.pdf (read)
- Amendment 0002 - N4008526R0178.pdf: not summarized: open it on SAM.gov
- Amendment 0004 PPI Responses.pdf: not summarized: open it on SAM.gov
- P1016_Civil C-131.pdf: not summarized: open it on SAM.gov
- 00 01 15.pdf: not summarized: open it on SAM.gov
- 01 30 00.pdf: not summarized: open it on SAM.gov
- 01 33 00.pdf: not summarized: open it on SAM.gov
- 02 82 00.pdf: not summarized: open it on SAM.gov
- 23 07 00.pdf: not summarized: open it on SAM.gov
- 23 22 26.00 20.pdf: not summarized: open it on SAM.gov
- 28 10 05.pdf: not summarized: open it on SAM.gov
- 32 31 13.53.pdf: not summarized: open it on SAM.gov
- 33 63 13.pdf: not summarized: open it on SAM.gov
- High Performance and Sustainable Building Checklist.pdf: not summarized: open it on SAM.gov
- Attachment B - PIEE Vendor Access Instructions.pdf: not summarized: open it on SAM.gov
- Attachment A - Pre-Proposal Inquiry Log Template.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attachment C- Construction Experience Project Data.docx: not summarized: open it on SAM.gov
- Attachment E- Historical Small Business Utilization.docx: not summarized: open it on SAM.gov
- Attachment F-Small Business Participation Commitment.docx: not summarized: open it on SAM.gov
- Attachment G - Individual SB Subcontracting Plan.docx: not summarized: open it on SAM.gov
- Attachment H -Price Proposal Form_Rev 1.docx: not summarized: open it on SAM.gov
- P084 - Amendment 006 Drawings.pdf: not summarized: open it on SAM.gov
- Attachment D- Past Performance Questionnaire.docx: not summarized: open it on SAM.gov
- Attachment H -Price Proposal Form.docx: not summarized: open it on SAM.gov
- Attachment I - SECNAV FORM 5512.pdf: not summarized: open it on SAM.gov
- NUWC P-1016 - Drawings.pdf: not summarized: open it on SAM.gov
- NUWC P084 - Drawings.pdf: not summarized: open it on SAM.gov
- Attachment J - WD RI20260001 10-1-26.pdf: not summarized: open it on SAM.gov
- Attachment J - WD RI20260001 7-30-2026.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Build a multi-story steel-frame 12,920 SF laboratory and office facility (P084) for depot-level testing of torpedo systems
- Do all site work: underground stormwater retention, mechanical and electrical utilities, telecommunications, landscaping, drainage, parking and exterior lighting
- Options: audio-visual design services, audio-visual equipment, and furniture, fixtures and equipment for P084 (CLINs 0002 to 0004; a CLIN is one priced line of the order)
- Option: build a 17,978 SF multi-story steel-frame laboratory facility, P1016 Consolidated RDT&E Systems Facility, with its own audio-visual and furniture options (CLINs 0005 to 0008)
- Options: demolish Building 1272T with its pad and foundations, or later build a paved parking lot and low-impact stormwater system in its place (CLINs 0009 and 0010)
- Amendment 0006 added a steam alternate bid option (alternative bid option 1) with new civil and mechanical drawings
- Provide one Site Safety and Health Officer and one Quality Control Manager for each project, and a scheduler on site at least 1 day a week
- Provide a bonded five-year general contractor watertightness warranty on the roof
- Contract type
- Firm-fixed-price construction contract, issued as a Request for Proposal (RFP) under FAR Part 15, with option line items
- Period of performance
- Start work within 15 calendar days after notice to proceed; complete the entire work ready for use not later than 901 calendar days after award (includes the 15 calendar days for bonds)
- Place of performance
- Newport, RI, USA (Naval Station Newport)
- Estimated value
- Magnitude of construction is between $25,000,000 to $100,000,000
- How they'll choose
- Best value to the Government under a FAR Part 15 request for proposal (price competition, technical merit and other factors); the full factor weights are in the part of Section 00 21 00 not read here
- Offers due
- November 24, 2026, 2:00 PM Eastern (from the version posted Nov 16, 2026; amended since)
What they'll judge offers on
- Factor 1, construction experience: relevant projects (new construction of a multi-story laboratory or industrial facility using structural steel framing; pre-engineered metal buildings are not accepted); High Bay construction experience may be viewed more favorably
- Factor 2, Management Approach and Schedule (includes a critical path schedule)
- Price: total price of the base work and all option items; the Government intends to evaluate all options
What to include when you submit
- Send all correspondence by email to Demetrice Jenkins at demetrice.jenkins2.civ@us.navy.mil.
- Include a Price Proposal using Attachment H (Price Proposal Form, revised version), pricing the base work and all option items.
- Include one signed bank reference showing adequate financial resources; if you have a line of credit, say roughly how many figures you can borrow against it.
- Include the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm if practicable or signed by an authorized officer, with evidence of working capital. For a joint venture, send them for each company and describe each one's financial responsibilities.
- Include a description of your facilities and equipment, and a list of your other work now under contract.
- Give the Cybersecurity Maturity Model Certification (CMMC) unique identifiers from the Supplier Performance Risk System (SPRS) for each system that will handle federal contract information or controlled unclassified information.
- Acknowledge each amendment (0001 through 0007) with your offer.
- The Factor 2 critical path schedule may be on 11 x 17 pages, per a posted answer.
- Factor 1 asks for past construction projects; one pre-proposal question describes it as a portfolio of two (2) to five (5) projects, so check Section 00 21 00 for the exact number and format.
- The P1016 Construction Security Plan is marked controlled unclassified information; request access by email to the contracting specialist.
After award, you must have
- Performance and payment bonds within 10 days after award From Solicitation - N4008526R0178.pdf:
Within 10 days after receipt of award, the offeror to whom the award is made shall furnish the bonds…
Not in the notice text
- The full instructions (Section 00 21 00), evaluation factor details, the offer guarantee (bid bond) rule and the place to send offers are in solicitation pages not read here (the middle of the file was left out); check the solicitation file on SAM.gov.
- Attached but not read: the price proposal form (Attachment H), small business participation attachments (E, F and G), past performance questionnaire (D), the wage determination (RI20260001, Davis-Bacon, updated October 1, 2026), the full specifications and drawings, and the vendor access instructions.
- Amendment 0002 is a scan with no readable text, so its changes are not known.
- Whether a small business subcontracting plan or participation commitment is required is not shown in the text read.
- Whether attending the site visit was required is not shown in the text read; only the visitor request was called mandatory for attendees.
More to check before you bid
- The notice names requirements:
- The notice mentions CMMC, the Defense Department's cybersecurity certification. Check the level it asks for.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 16, 2026
- Notice type
- Solicitation
- Office
- Navfacsyscom Mid-Atlantic, Norfolk, VA
- Product/service code
- Y1JB · Construction of Testing and Measurement Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
10 versions have been posted, newest first.
- Nov 23, 2026 · Amendment 0009Due Dec 1, 2026 (changed)
- Nov 20, 2026 · Amendment 0008Due Nov 24, 2026
- Nov 16, 2026 · Amendment 0007 (this version)Due Nov 24, 2026 (changed)
- Nov 5, 2026 · Amendment 0006Due Nov 17, 2026 (changed)
- Oct 23, 2026 · Amendment 0005Due Nov 10, 2026 (changed)
- Oct 8, 2026 · Amendment 0004Due Oct 27, 2026 (changed)
- Sep 10, 2026 · Amendment 0003Due Oct 13, 2026
- Sep 2, 2026 · Amendment 0002Due Oct 13, 2026
- Aug 20, 2026 · Amendment 0001Due Oct 13, 2026
- Aug 13, 2026 · SolicitationDue Oct 13, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- ACC003 Weapons Generation Complex and Northern FlightlineThe U.S. Army Corps of Engineers (USACE), Alaska District, is seeking a design-build team or design-builder for ACC003 Weapons Generation Complex and Northern Flightline at Joint…
- Program Solicitation W9127826SC001 Deployment Center/Flight Line Dine - Crash/Fire Rescue Station - Demo Hangar 4 Tyndall Air Force Base, Florida (Bay County) Progressive-Design-Build OT
- Hangar 140 Renovations at Naval Air Staton (NAS) Jacksonville (JAX), Jacksonville, FloridaNAVFAC Southeast (Naval Facilities Engineering Systems Command) is doing market research (a sources sought notice, not a solicitation) for a design-bid-build renovation of the…
- Naval Surface Warfare Center Philadelphia Division (NSWCPD) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC)Only small businesses can bid: the Naval Surface Warfare Center, Philadelphia Division (NSWCPD) is seeking proposals for a five-year indefinite delivery, indefinite quantity…
- Station-Const TBD Oig RenovationSources sought: the VA wants service-disabled veteran-owned small business (SDVOSB) contractors to replace flooring and cove base and repaint walls in the New York VA Office of…