Upcoming federal contracts: NAICS 238220, Plumbing, Heating, and Air-Conditioning Contractors
Planned plumbing, heating, and air-conditioning contractors contracts from agencies' published procurement forecasts. They come out months before a solicitation is posted on SAM.gov, so there's time to introduce your business and ask how the agency plans to buy the work.
- Planned buys listed
- 111
- Award expected within 6 months
- 74
- Set aside for small business
- 29
- Updated
- Oct 10, 2026
Planned NAICS 238220 contracts, soonest award first
111 listed
Get new NAICS 238220 forecasts by email. Free FedReady accounts get a daily or weekly email with new planned buys and open contracts that match your business.
Email me new forecastsTurnkey procurement, installation, and controls programming of nine (9) replacement VAV hot water reheat coils at OSTI facility
- Award expected
- Current contract ends Dec 2026
- Estimated value
- $25K to $250K
- Set-aside
- No set-aside
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Source: DOE acquisition forecastSee the contact and incumbent, free
DSW FIRE SUPPRESSION SYSTEM UPGRADE PHASE 2
- Award expected
- Current contract ends Dec 2026
- Estimated value
- $250K to $7.5M
- Set-aside
- Small business
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Source: DOE acquisition forecastSee the contact and incumbent, free
Powerplant Piping Management Plan (LCB)
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Management plan for piping within the Hoover Dam powerplant. Lower Colorado Basin
Fire Piping Plan (LCB)
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Fire piping plan for Hoover Dam. Lower Colorad Basin
Spillway, Penstock, & Dam Abutment Drain Cleaning (LCB)
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Hoover Dam Spillway, Penstock, & Dam Abutment Drain Cleaning. Lower Colorado Basin
HVAC Upgrades Warehouses (LCB)
- Award expected
- FY2027
- Estimated value
- Under $150K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
HVAC Upgrades for the Warehouses at Hoover Dam, Lower Colorado Basin
Pneumatic Sewer Ejectors Replacement (LCB)
- Award expected
- FY2027
- Estimated value
- Under $150K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
The Hoover Dam wastewater collection system relies on a system of pneumatic sewer ejectors, known as air pots, to transfer sewer water from the bottom of the dam to the Wastewater Treatment Plant. All 5 of them need to be replaced due to corrosion. Lower Colorado Basin
HVAC Upgrades at Parker Dam (LCB)
- Award expected
- FY2027
- Estimated value
- Under $150K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Upgrade HVAC, installing 9 air cooled Mini Split Units, for the Administration and Operations Building at Parker Dam, Lower Colorado Basin
HVAC Roof Top Units Maintenance (LCB)
- Award expected
- FY2027
- Estimated value
- $150K to $249K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Maintenance of HVAC rooftop units at the Phoenix Area Office (PXAO), Lower Colorado Basin
HVAC Replacement 7th & 8th Floor (LCB)
- Award expected
- FY2027
- Estimated value
- $150K to $249K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
HVAC replacement for the 7th & 8th floors at Hoover Dam, Lower Colorado Basin
EBFD HVAC System for PP
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Small business
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Elephant Butte Field Division (EBFD) Power Plant (PP) HVAC System Replacement
Black Hills National Forest - Forest Wide HVAC Maintenance Service Contract
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
HVAC Maintenance for Black Hills National Forest Supervisors Office (SO) and SO Warehouse Mystic Ranger District/RMRS Office and Warehouse Northern Hills Ranger District Office Tatanka Hot Shot Base and Great Plains Dispatch Center.
Rosebud Agency HVAC Construction
- Award expected
- Work starts Dec 2026
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Construction only-Rosebud Administration Building 1004 needs heating, ventilation, and air condition system replacement. The boiler has passed its serviceable life.
Justice Center for the People HVAC Construction
- Award expected
- Work starts Dec 2026
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
The purpose of this requirement is the have the HVAC system replaced at the Justice Center for the People
Standing Rock Agency HVAC Construction
- Award expected
- Work starts Dec 2026
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Construction only- Construction is needed to replace existing boilers and system that are past their serviceable life.
POWER Lab conditioned air supply
- Award expected
- Work starts Dec 2026
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
The test cell 3/4 conditioned air supply for testing aircraft engines is beyond useful life must be replaced.
BGNDRF HVAC Replacement
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Replace existing ECU-01, ACU-02, and split unit (ACCU-1/AHU-01) and HVAC maintenance at Brackish Groundwater National Desalination Research Facility (BGNDRF) (Upper Colorado Basin)
Replace Boilers 4 and 5
- Award expected
- FY2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Service-disabled veteran-owned
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
This project will replace boilers at the boiler plant.
Replace HVAC Equipment Munro Hall
- Award expected
- Jan 25, 2027
- Solicitation expected
- Dec 21, 2026
- Estimated value
- $2M to $5M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
The scope of work generally consists of the removal and replacement of major HVAC equipment at Munro Hall at Training Center Cape May. Work includes, but is not limited to: - Replace all (4) RTUs; Update associated controls as required. - Replace ERU (Greenheck); include associated fans (2 Exhaust, 1 Supply) and update associated controls as required. - Replace HCUs (x17); Update associated controls as required. - Replace FCUs (x10); Update associated controls as required.
Source: DHS Acquisition Planning Forecast System (F2026075428)See the contact, free
18102059 - CG BASE CAPE COD Replace Fire Pumps for Hangars 3170 and 3172 BCC (PARENT)
- Award expected
- Jan 29, 2027
- Solicitation expected
- Dec 1, 2026
- Estimated value
- $2M to $5M
- Set-aside
- Small business
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Replace 3 fire pumps in Bldg 3173 and add surge protection to existing systems. One pump has failed and the other two can either be repaired or replaced. Other required work in pump room is to dispose of the AFFF tanks & AFFF (contaminate) and have an A&E study conducted to outline what is actually required for the 3172 hangar in terms of fire suppression.
Source: DHS Acquisition Planning Forecast System (F2026075181)See the contact, free
Install Additional HVAC at Lake Andes Repeater and Wessington Springs Repeater
- Award expected
- Current contract ends Jan 2027
- Estimated value
- $25K to $250K
- Set-aside
- Small business
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Source: DOE acquisition forecastSee the contact and incumbent, free
TUAI HVAC System Cyclic Maintenance and Replacement
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
The HVAC System is in need of 10 new Condensers, 7 new Air handling, and 10 water source heat pumps with Maintenance on the Cooling Tower leaving Hanger1, Hanger #2, and Bath and Locker building that has been left without any HVAC. The artifacts and exhibits are being exposed to wide temperature and humidity levels when they should be in a climate and humidity-controlled environment.
Rehabilitate Corson Building HVAC System
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
The Park requests to have eight Roof Top Air Units Replaced - These Roof Top units have since 2007 been supplying Air Conditioning and heat for a three-story building that houses the park’s administrative offices (3rd Floor), and public areas on the 2nd and 1st floors. The Park has a need to have eight Carrier Roof Top Air Handler Units replaced, extensive duct work replaced, drainage piping reworked, support structure reworked, and lightning rods adjusted.
Replace Fire Suppression System in Trading Post and Administration Building
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
The existing dry pipe fire suppression system, which was installed in 2002, that services and protects both the Trading Post and the Administration Building will be replaced with a new dry pipe fire suppression system. The new system will need to be designed to meet current building and fire code while protecting the historic qualities of the combined 5,328 square feet of the structure that encompasses both the Trading Post and Administration Building.
Old Faithful Ranger Station Fire Suppression System Installation & Replacement
- Award expected
- FY2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Yell PR Fire Suppression System Installation & Replacement
FOBU - 14019 - Install Fire Suppression System in Visitor Center
- Award expected
- FY2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
PMIS# 282711 will improve the water supply lines and install a fire suppression system and related components in the Fossil Butte National Monument Visitor Center.
Mammoth Boiler Replacement
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Yellowstone project to purchase and install boilers in Mammoth Wyoming. Mission Critical Maintenance and Repairs. Boiler systems are beyond their serviceable life and can no longer be repaired. Scope includes installation of boilers, removal of heating oil tanks (if applicable) and install propane tanks.
BICA - 10998 - Replace HVAC Systems Park Wide
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Replace all HVAC Units in Both the North and South District of BICA
Mammoth VC HVAC System replacement including BAS and all components
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
DINO - 18760 - Rehabilitate Heating, Ventilation and Air Conditioning System in the Quarry Exhibit Hall
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
This project will rehabilitate the heating, ventilation, and air conditioning system of the Quarry Exhibit Hall to correct problematic original design.
PAAL - 18431 - Install New HVAC in Visitor Center
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Replace the aging and unreliable HVAC system serving the park’s 5,000 SF Visitor Center. The existing system is nearing the end of its service life, requires frequent costly repairs, and cannot adequately control temperature or humidity, contributing to mold concerns and poor indoor conditions. As the park’s primary visitor facility, serving over 80% of park visitors, replacement is a high priority for visitor and staff health, asset protection, and continued operations.
DAAV - 14128 - Replace 50 Ton Chillers B16 Roof Top Units
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Replace the facility’s end-of-life 50-ton chillers with new energy-efficient units to restore reliable cooling and humidity control. Work includes removal and disposal of existing units; installation of new chillers and associated mechanical, electrical, and controls; required system connections and modifications; and startup, testing, and commissioning. The new system will support museum collection preservation, occupant comfort, and facility operations.
CAGR - 11636 - Repair VC Boiler unit and Replace HVAC systems
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Component renewal of VC Boiler/Chiller unit and HVAC components
Fire Cache and Mammoth Garage HVAC System Replacement and all components as currently configured.
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Yell PR FY27 Fire Cache and Mammoth Garage HVAC System Replacement and all components as currently configured.
GRCA - 17813 - IDIQ for Repairs to backflow prevention devices
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
5 year IDIQ to conduct repairs from backflow inspections and maintain state & EPA compliance
Old Faithful Vistor Center HVAC System Replacement Including BAS and all components as currently configured
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
AGFO - 15260 - Replace Fire Suppression System in Visitor Center
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
This project will remove the existing fire suppression system from the AGFO Visitor Center and replace it with a new system that is up to code to provide health, life safety, and museum collection protection. This will be a total of 11120 square feet of coverage.
PAIS - 13822 - Laboratory HVAC System Replacement and Building Climate Control Improvements (STSR)
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
At the Sea Turtle Science and Recovery (STSR) Building - Work includes demolition and replacement of existing HVAC equipment, replacement of flexible branch ductwork with rigid ductwork, evaluation and upgrade of the building's electrical infrastructure as required,
CAVE - 12422 - Rehabilitate Visitor Restrooms in Main Cavern
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
This project replaces all plumbing, sinks, toilets, and restroom partitions within the cavern visitor use restrooms, 750 feet underground, at the Carlsbad Caverns Visitor Center. Work includes removing and replacing existing plumbing (340 linear feet), urinals (6), toilets (10), partitions (1,400 square feet), sinks (8), hand dryers (6), and countertops (60 square feet). Interior water lines and fixture mounting brackets with associated fittings will also be replaced during this project. 3,300 s
GRCA - 17818 - IDIQ call for backflow repairs 2
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
repair or replace backflow prevention devices against new IDIQ in order to maintain compliance with state and EPA requirements
GLCA - 12666 - Replacement of HVAC Units in Lee's Ferry, Page, and Wahweap Housing Units
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
This project will Replace HVAC Units in Lee’s Ferry, Page, and Wahweap Housing Units. This area sees excessively hot summers in addition to cold winters, current systems are aging (most past or nearly life expectancy and using old refrigerant technology). The replacement of HVAC systems will enable more efficient operations, reduce power demand and provide for more comfortable conditions for residents while also enabling our maintenance staff to upkeep systems for the next decade.
FOSU - 18054 - Replace Defunct HVAC at Fort Sumter Visitor Education Center Terminal- Construction
- Award expected
- FY2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Replace HVAC System at Fort Sumter Visitor Education Center Terminal - Construction
Replace HVAC System & Roof at Visitor Center (Construction)
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
This component is Construction and Commissioning of this project.
Upgrade Fire Alarm System
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
This project will replace the obsolete fire and intrusion alarm systems with a new code compliant stand-alone fire alarm system in all buildings.
VAMA - 12286 - Replace Fire Protection System in Vanderbilt Coach House
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
The proposed system would cover the entire facility (approximately 44,000 sq ft) much of which is occupied on a daily basis by both maintenance and garden staff. The proposed system would be 20% dry pipe and 80% wet pipe based on recommendation from EYP engineers who also provided the Class C estimate for this project.
ACAD - 14329 - Parkwide Boiler and Heat Pump Service Contract
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Service all boilers and heat pumps systems in park buildings to reduce long-term operation and maintenance cost.
EVER - 12668 - Replace Headquarters HVAC Systems
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
This project will replace 14 aging HVAC systems and the lightning protection system at Everglades National Park Headquarters. The project will improve building reliability, occupant safety, and operational efficiency by replacing equipment that has exceeded its useful life, reducing maintenance needs, and protecting the facility from frequent lightning associated with South Florida storms.
MIMA - 15114 - Rehabilitate Minute Man Visitor Center (Construction)
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Construction and management. Construction to be contracted out to general contractor. NPS day labor for Construction Control Representative time to perform COR tasks associated with contract oversight during construction.
ACAD - 14295 - Replace Curatorial Fire Suppression System
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Project will remove existing fire suppression system and all components and install new fire suppression system. The new system will be designed to effectively protect approximately 2,080 square feet of curatorial workspace, irreplaceable collections and archival storage located in the park headquarters administrative wing.
ACAD - 14296 - Remove and Install Curatorial HVAC System and Controls
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Replace the existing obsolete and inefficient HVAC system and all associated components. Design and install a new HVAC system suitable for museum-grade historical collections that incorporates humidity and temperature control, similar to the existing system. Effectively protect approximately 2,080 square feet of curatorial workspace, irreplaceable collections, and archival storage located in the Park headquarters’ administrative wing.
STLI - 16634 - Repair Statue of Liberty HVAC (Replace Chiller at 0P and Air Handler Unit #2)
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Replace deteriorated HVAC Chillers and air-handlers in the Statue of Liberty. The work will take place inside the historic pedestal's ground level (0P) and second level (2P). Replacing chillers and handler units that were installed during the 1986 restoration, and nearing the end of their 40-year life cycle. The unit sizes are: (1) 60-ton chiller, (1) 100-ton chiller and three 25-30HP air-handler units and respective condensing units.
COLO - 12893 - Replacement of Yorktown Visitor Center Air Handlers, Boilers and Pumps
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
The Yorktown visitor centers air handling units, boilers and pumps are well beyond their life cycle and are in need of replacement. The supplied air is managed by the air handlers to control room climate, to promote elevated sanitation while hindering bacteria growth and spread. The air handling units control critical process air supply and indoor air conditions through filtration, cooling, pressurization, exhaust and heating.
DESO - 10627 - Hurricane Helene Interim Repairs to Visitor Center and HVAC
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Replace electrical panel at DESO Visitor Center. Replace and raise aprox. 50 electrical outlets. Test and rewire electrical distribution system as necessary. Remove aprox. 1360 square feet of carpet flooring. Replace carpet flooring with textured concrete or sim. material. Mechanical (hand) removal of approximately 800 square feet of damaged drywall located on the bottom portion of the walls. Replace drywall with aprox. 800 sq. ft of concrete board.
WOTR - 14052 - WOTR Replace Fire Suppression System Construction
- Award expected
- FY2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Replace Fire Suppression System in FC based on design developed by EBL Engineers in 2026 via PMIS 227390 A - potentially PMIS 227390 B
NAMA - 17986 - Drinking Fountain Replacement Phase
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Continued work on replacing all public drinking fountains, this is a donation funded project, in 2026 some fountains were replaced by a partner instead of the Park. We are not sure if this will come in as a package to our MABO or if a partner will do the work or even if funds will be donated to do the work.
CATO - 17054 - Install Kitchen Hood Fire Suppression Systems in Camp Misty Mount and Camp Round Meadow Dining Halls
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Kitchen hood fire suppression systems will be installed in Camp Misty Mount and Camp Round Meadow Kitchen/Dining Halls in order to prevent grease fires.
LAKE - 13249 - Rehabilitate Headquarters HVAC System and Controls
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
This project will upgrade the five existing HVAC package unit heat pumps with six new mini split heat pump units, remove and modify the existing ductwork and automatic louvers for installation of a air recovery ventilation system, and replace a bathroom exhaust fan at the Boulder City Headquarters building.
PUHO - 13976 - Rehabilitate Fire Protection System in Dormitory Building
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
This procurement is the construction phase to rehabilitate the dormitory building to install a fire protection system consisting of water main, fire sprinklers, and fire alarms.
GOGA - 12680 - Renewal of Stinson Beach Restrooms
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
This project addresses three restrooms at Stinson Beach, the North, Central, and South Restrooms which are in need of renewal. Work includes replacement of restroom furnishings, painting of the interiors and exteriors, polishing of the concrete floors, replacement of two drinking fountains and replacement of the temporary barrier on the Central Restroom. This project will result in a safer experience for visitors and easier maintenance for GOGA staff.
DEVA - 16769 - Relocate and Rebuild Fire Risers at Scotty's Castle
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
The fire riser relocations in PMIS 355478 will require design approval prior to construction by the regional fire marshal. The Gas House fire riser is currently at the end of its useable life and relocation is desirable to prevent premature failure. The Chimes Tower riser has been slated for relocation due to the difficulty to maintain and lack of drainage.
LAKE - 13242 - Replace Warehouse Air Conditioning System and Ducting
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
The project replaces seven rooftop air conditioning units on the eastern side (office area) serving the Safety First Warehouse located at Boulder City, Nevada. The existing HVAC units are past their service life and need to be improved. They are to be upgraded with new higher SEER (seasonal energy efficiency ratio), Energy Star rated, units to meet Indoor Air Quality standards. Included in this project is also the relocation of ducts as required.
NOCA - 17299 - Rehabilitate Golden West Visitor Center Boiler
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
This project will rehabilitate the boiler system by replacing key components, including two pump/motor units, check valves, pipe insulation, air-handling systems, supply and exhaust fans, temperature sensors, and an obsolete, non-functioning building management system. The project is located in the remote town of Stehekin, Washington, which is accessible only by boat, plane, or on foot.
MUWO - 13803 - Muir Woods Upper and Lower Restrooms
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
The Project will consist of reconditioning interior building components for the Muir Woods Restrooms. Work includes replacing interior surfaces, replacing urinals, toilets, sinks, soap dispensers, hygiene boxes, trash cans, bathroom partitions, restroom signs, mirrors, doors, hanging lights, exhaust fans, interior wall tile, and baby changing stations. It will also include replacement of electrical wiring and replacing plumbing up to the sewer lateral in the upper restroom.
DEVA - 14554 - Structural Fire ITM Testing in Death Valley
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Structural Fire ITM testing is required each year per RM58.
GOGA - 18561 - Refresh Alcatraz Restrooms at Barbershop Plaza and Lighthouse
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
The project will include recoating interior surfaces, exterior deep cleaning, new floor treatments, mirrors, sinks/counters, soap and sanitizer dispensers, hand driers, light fixtures, partitions, baby changing stations, toilets/urinals and grout/tile repair or replacement. The project also entails the provision of temporary restroom facilities on Alcatraz for use during the construction.
GOGA - 12735 - Replace Roof and Interior and Exterior Components at Baker Beach Restroom
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
The Project will consist of replacing interior and exterior building components for the Baker Beach Restroom, which is 664 sqft. As part of the GOGA’s regular cyclic program, using contract labor, the Baker Beach Restroom work will include repainting exterior and interior surfaces, replacing 1 urinal, 7 toilets, 3 sinks, 3 soap dispensers, 4 hygiene boxes, and two baby changing stations. It will also include a total roof shingle replacement, plywood decking, and skylights. Replacement of the met
HAVO - 14712 - Replace Furnaces in Offices and Housing
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
This project will replace our 90% high efficiency propane furnaces, that were installed in 2003/2004, with new 90%+ high efficiency propane furnaces and thermostats in 13 park buildings and 9 housing units which are past their life expectancy. These units have become high maintenance with costly repairs and parts replacement. Due to the age of the units, it is expected that this will result in cracked heat exchangers and leaking of carbon monoxide into the buildings. T
Repair Heating Ventilating Air Conditioning United States Coast Guard Santa Rita Base Guam Project # 23800183
- Award expected
- Feb 15, 2027
- Solicitation expected
- Jan 15, 2027
- Estimated value
- $500K to $1M
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Source: DHS Acquisition Planning Forecast System (F2025071492)See the contact, free
Replace Marine Diesel and Gas Tanks DET Sandy Hook at Sector New York, PSN 12999659
- Award expected
- Feb 26, 2027
- Solicitation expected
- Dec 7, 2026
- Estimated value
- $1M to $2M
- Set-aside
- Small business
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Replace above ground gas and diesel tanks. Replace diesel tank in kind, size gas tank to operational asset need.
Source: DHS Acquisition Planning Forecast System (F2026075155)See the contact, free
Provide Fuel Sys Sec Cont Multiple Locations at CG Station Provincetown (PARENT), PSN 28905461
- Award expected
- Feb 26, 2027
- Solicitation expected
- Dec 14, 2026
- Estimated value
- $350K to $500K
- Set-aside
- Small business
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Construct secondary containment for single wall piping at Child Project locations.
Source: DHS Acquisition Planning Forecast System (F2026075157)See the contact, free
Cheyenne Area Communications Building HVAC for the replacement of HVAC equipment at Rock River, Round Top, and Bald Mountain communications…
- Award expected
- Current contract ends Feb 2027
- Estimated value
- $25K to $250K
- Set-aside
- Small business
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Cheyenne Area Communications Building HVAC for the replacement of HVAC equipment at Rock River, Round Top, and Bald Mountain communications sites.
Source: DOE acquisition forecastSee the contact and incumbent, free
Replace Galley and Ready Crew Berthing Heating Ventilation Air Conditioning, U.S. Coast Guard Air Station Barbers Point, Kapolei, Hawaii, Project #27135031
- Award expected
- Mar 15, 2027
- Solicitation expected
- Feb 15, 2027
- Estimated value
- $2M to $5M
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Source: DHS Acquisition Planning Forecast System (F2025070454)See the contact, free
Enroute Sustatin
- Award expected
- Work starts Mar 2027
- Estimated value
- $250K to $499K
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
22008103 ZLC REFURBISH Child Care Center Renovation: Infant 1,2 and Crib (Area 1)
EnRoute Sustain
- Award expected
- Work starts Apr 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
26001652 ZDV ATC Consoles and Associated Infrastructure
Enroute Sustatin
- Award expected
- Work starts Apr 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
FY28 Replace Chillers 100 and 500 for Seattle Air Route Traffic Control Center
Building 17 Chiller Replacement
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Building 17 chiller is down and must be replaced.
TPS Duct Liner
- Award expected
- Work starts May 2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Installation of HVAC duct liner to extend the service life of building ducts
Ohmsett Compressed Air System
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Ohmsett Compressed Air System: Upgrade & install new system throughout facility
EnRoute Sustain
- Award expected
- Work starts Jun 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
26001655 ZLA _ Replace ATC Consoles and Associated Infrastructure
ZOB _ HVAC
- Award expected
- Work starts Jun 2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
HVAC project at the Cleveland ARTCC, REPLACE ZOB AHU_201, AHU_202, AHU_203, AHU_204, AHU_205A, and AHU_205B and replace associated dampers and VFDs. Replace chilled and hot water piping and associated isolation valves, control valves, gauges, air separators, and expansion tanks. Replace other attic building components in need of replacement, such as floor drains and lighting.
Enroute Sustatin
- Award expected
- Work starts Jul 2027
- Estimated value
- $1M to $1.9M
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
20013560 ZLC FY26 Replace deficient pre_action fire suppression piping
ZMP _ HVAC
- Award expected
- Work starts Jul 2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
HVAC project at the Minneapolis ARTCC. Replace humidifiers HU_205A, HU_205B, HU_209A, HU_209B, HU_380, HU_390, HU_390B;
Enroute Sustatin
- Award expected
- Work starts Aug 2027
- Estimated value
- $500K to $999K
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
25015271 ZSE _ Replace Boilers B_1A and B_1B (MC#27)
ZAU _ HVAC
- Award expected
- Work starts Aug 2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
HVAC project at the Chicago ARTCC. Replace 21 Various Unit Heaters in Power Services Bldg Beyond Life Cycle
EnRoute Sustain
- Award expected
- Work starts Sep 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
26001654 ZOA _ Replace ATC Consoles and Associated Infrastructure
EnRoute Sustain
- Award expected
- Work starts Sep 2027
- Estimated value
- $1M to $1.9M
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
22001089 ZOA FY '25 _ Replace Control Room Lighting & Dimmer System
Solar Project ARS-TUCSON SWRC Building 150
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
The work includes Installation of new solar array on the existing building rooftop. Some patch and repair to the existing roof membrane will be performed due to the new panel attachments and incidental related work.
Replace HQ HVAC's
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Project will replace multiple HVAC units and components.
REPLACE HVAC, W.D. MAINTENANCE/FIRE CACHE BLDG Jocelyn Nungary NWR
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Rehabilitate HQ Office Replace HVAC 27 Phase 2 (c)
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
U.S. Fish and Wildlife Service: Rehabilitate HQ Office Replace HVAC 27 Phase 2 (c)
Building 303 replacement of cooling towers and free cooling
- Award expected
- Work starts Oct 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Replace the 3 cooling towers, free cooling heat exchanger, and chilled water pumps at the Central Utilities Plant Building 303
EnRoute Sustain
- Award expected
- Work starts Oct 2027
- Estimated value
- $20M to $49M
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
18063154 ZUA _ (IIJA) Environmental Wing CONST (802956, 1303390, 19007188, 20010359 & (1863152))
EnRoute Sustain
- Award expected
- Work starts Oct 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
22001041 ZUA (IIJA) Replace Site Underground Mechanical Utilities & Parking Lot (19000252)
EnRoute Sustain
- Award expected
- Work starts Oct 2027
- Estimated value
- $250K to $499K
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
18067794 ZOA FY '25 _ Renovate ZOA Auto Wing Basement and 1st Fl Restrooms
ZID _ HVAC
- Award expected
- Work starts Oct 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
HVAC project at the Indianapolis ARTCC. Replace AHUs 6,7,8,9, and 10 in Automation Wing Basement Beyond Life Cycle
ZID _ HVAC
- Award expected
- Work starts Oct 2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
HVAC project at the Indianapolis ARTCC. Replace AHUs 1,2,3,4,5, and 211(11) Beyond Life Cycle
EnRoute Sustain
- Award expected
- Work starts Nov 2027
- Estimated value
- $500K to $999K
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
23005945 ZOA Replace Two Failing Boilers (B1A & B1B)
Enroute Sustatin
- Award expected
- Work starts Nov 2027
- Estimated value
- $250K to $499K
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
24010359 ZSE _ Replace facility entrance and exit arms and gates
EnRoute Sustain
- Award expected
- Work starts Dec 2027
- Estimated value
- $1M to $1.9M
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
20011361 ZSE FY23 IIJA Deficient pre_action fire suppression piping at Seattle ARTCC (ZSE). MC#37
EnRoute Sustain
- Award expected
- Work starts Jan 2028
- Estimated value
- $500K to $999K
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
26000705 ZLA _ Replace all plumbing for 1st floor and basement Restrooms plus the Janitor Closet in Auto Wing
EnRoute Sustain
- Award expected
- Work starts Jan 2028
- Estimated value
- $5M to $9.9M
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
22001038 ZOA IIJA Replace Site Underground Mechanical Utilities
EnRoute Sustain
- Award expected
- Work starts Jan 2028
- Estimated value
- $1M to $1.9M
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
21003633 ZOA FY '25 _ Replace Steel Exterior and Interior Access Controlled Doors
Enroute Sustatin
- Award expected
- Work starts Jan 2028
- Estimated value
- $5M to $9.9M
- Set-aside
- 8(a)
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
25015466 ZSE FY26 Refurbish AHU_201 thru 204 and AHU_205A & B
PROVIDE FIRE EQUIPMENT INSPECTION SERVICES FOR THE ROCKY MOUNTAIN REGION LOCATED IN LOVELAND COLORADO
- Award expected
- Current contract ends Jan 2028
- Estimated value
- $25K to $250K
- Set-aside
- Small business
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Source: DOE acquisition forecastSee the contact and incumbent, free
JCN 18062837 ZDC CTRB
- Award expected
- Work starts Feb 2028
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
18062837 ZDC Replace Existing 500 series AHUs located in the PSB
JCN 21005026 BED ATCT
- Award expected
- Work starts Jul 2028
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
REPLACE BED ATCT HVAC Life Cycle Replacement and Chiller
JCN 18063946 ATLN CHILR
- Award expected
- Work starts Aug 2028
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
18063946 Replace ATLN Chillers and associated peripheral equipment
JCN 18063946 ATLN CHILR
- Award expected
- Work starts Aug 2028
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
18063946 Replace ATLN Chillers and associated peripheral equipment
JCN 24015534 FAY TOWB
- Award expected
- Work starts Oct 2028
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Replace ATCT/TRACON HVAC systems and controls as required
JCN 24015534 FAY TOWB
- Award expected
- Work starts Oct 2028
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Replace ATCT/TRACON HVAC systems and controls as required
- ORPI - Replace Plumbing and Interior Components House 15
- Award expected
- FY2030
- Estimated value
- Not given
- Set-aside
- Not decided yet
- NAICS
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Description
Replace Plumbing and Interior Components House 15
Agencies planning 238220 work
- Department of the Interior: 64 planned
- Department of Transportation: 32 planned
- Department of Homeland Security: 6 planned
- Department of Energy: 5 planned
- Department of Agriculture: 3 planned
- Department of Veterans Affairs: 1 planned
Frequently asked questions
What is an agency procurement forecast?
A procurement (or acquisition) forecast is an agency's list of contracts it plans to buy in the coming months, published before the solicitation is posted on SAM.gov. Agencies publish them so small businesses can prepare. Each entry usually gives the work, the NAICS code, an estimated value range, the expected solicitation or award quarter and whether it may be set aside.
How should a small business use a forecast?
Pick the planned buys in your NAICS codes, then introduce your business to the agency's small business specialist or program office with a short email and your capability statement. Ask how they plan to buy it: set-aside, contract vehicle and timing. Then watch SAM.gov for a sources sought notice or draft solicitation, which often comes first. Contacting the agency early, while the requirement is still being planned, is when you can still influence a set-aside decision.
How accurate are forecast dates and values?
They are estimates. Dates shown as a quarter or fiscal year are the agency's own (the federal fiscal year starts October 1, so Q1 FY2027 is October to December 2026). Values are ranges. Buys slip, change set-aside or are dropped, and some are never posted. Treat a forecast as an early signal, not a promise.
Where does this forecast data come from?
From the agencies' own public forecast sites: GSA's Acquisition Gateway forecast tool (which carries the forecasts of many departments), the Department of Homeland Security's Acquisition Planning Forecast System, and the Department of Energy and NASA acquisition forecasts. FedReady checks them every day. Agencies that aren't listed publish their forecasts elsewhere; Acquisition.gov links to each one.
Keep going
- Open NAICS 238220 contracts, size standard and spending
- NAICS 238220 contracts ending in the next 12 months
- Check whether you're small under 238220
- Forecasts by agency
Forecast data from DOE acquisition forecast, GSA Acquisition Gateway forecast tool and DHS Acquisition Planning Forecast System, public U.S. government information, as of Oct 10, 2026. Forecasts are plans, not promises: dates, values and set-asides change. FedReady is an independent company, not affiliated with SAM.gov or any government agency.