Upcoming federal contracts: NAICS 237310, Highway, Street, and Bridge Construction
Planned highway, street, and bridge construction contracts from agencies' published procurement forecasts. They come out months before a solicitation is posted on SAM.gov, so there's time to introduce your business and ask how the agency plans to buy the work.
- Planned buys listed
- 174
- Award expected within 6 months
- 101
- Set aside for small business
- 24
- Updated
- Oct 10, 2026
Planned NAICS 237310 contracts, soonest award first
174 listed
Get new NAICS 237310 forecasts by email. Free FedReady accounts get a daily or weekly email with new planned buys and open contracts that match your business.
Email me new forecastsCO NP BLCA 10(1) South Rim Drive
- Award expected
- Work starts Oct 2026
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The project includes guardrail removal and installation. Work elements include traffic control, site grading, specialized guardrail procurement and boulder removal, dispersal across twelve (12) distinct locations along South Rim Drive.
George Washington and Jefferson National Forests Road Maintenance IDIQ Forest-Wide
- Award expected
- FY2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Indefinite Delivery Indefinite Quantity (IDIQ) contract for road maintenance services across all seven Ranger Districts of the George Washington and Jefferson National Forests including the Clinch Mount Rogers Eastern Divide James River/Warm Springs Glenwood/Peddler North River and Lee Ranger Districts. Work includes routine and preventive road maintenance drainage structure repair and replacement aggregate placement culvert installation and replacement and associated transportation infrastruct…
Nixon, Mt. Trumbull, Quail Hill Design
- Award expected
- Work starts Oct 2026
- Estimated value
- $250K to $499K
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Design packages for Nixon Admin Site rehabilitation, Mt. Trumbull Schoolhouse rehabilitation, and Quail Hill Road Realignment.
Ft. Stanton NCA Rec Site Upgrades/Rio Bonito Bridge
- Award expected
- Work starts Oct 2026
- Estimated value
- $250K to $499K
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Rebuild a foot bridge that was washed out during a flood event. This bridge will provide essential access to the Lincoln Tract, a popular area for hiking, equestrian activities, and nature trails along the Rio Bonito River. This project is in alignment with SO 3426 Ensuring National Parks are Open and Accessible as the the bridge will allow continued use of public lands and facilities.
NJ-NY ERFO FW WARI 2019-1(1)
- Award expected
- Work starts Oct 2026
- Estimated value
- $2M to $4.9M
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Repair Liberty Loop (SW) and Dagmar Dale Nature Trail and Repair Winding Waters Trail and Liberty Loop Trail (NE)
Shadow Mountain Village (SMV) Road Reconstruction
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Reconstruct the road through SMV including asphalt and concrete gutters.
North GP Road Repairs
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Large culvert replacements and asphalt patching to support upcoming timber sales.
Northern Hills Ranger district Parking Lot Replacement
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The parking lot at the Black Hills National Forest Northern Hills Ranger District is being replaced to correct pavement failures and drainage issues.
TX FW LGA 10(5) Steve Thompson Wildlife Drive
- Award expected
- Work starts Nov 2026
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The project includes full depth reclamation of existing driving surface which includes chip seal material, and existing gravel. After completing full-depth reclamation new aggregate surface course will be added to create a driving surface that has a consistent width. The project also includes installation of aluminum gate and a small concrete pad and safety improvement signs and speed bumps.
Puerto Rico Construction MATOC
- Award expected
- Work starts Nov 2026
- Estimated value
- $50M to $99M
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Indefinite Delivery, Indefinite Quantity (IDIQ) contract to provide highway and/or bridge construction services with incidental design services for hurricane recovery on the island of Puerto Rico. The estimated value of this procurement contract will not exceed $60 Million.
Flathorn Gegoka - Little Isabella River Trail Bridge 2 Replacement
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project is replacing a cross-country ski trail bridge that was damaged during a storm event in 2024. This project will be funded with ERFO funds. The DDIR number is 71093A-3. The existing multi-span bridge was washed down stream. The replacement bridge will be 110-0 x 6-10 simple span. The new bridge will be a fiber reinforced polymer (FRP) truss with timber decking and concrete abutments.
Flathorn Gegoka - Weiss Creek Trail Bridge Replacement
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project is replacing a cross-country ski trail bridge that was damaged during a storm event in 2024. This project will be funded with ERFO funds. The DDIR number is 71093A-2. The existing multi-span bridge was damaged by debris impact which has caused horizontal deflection of the structure and the abutments scoured. The replacement bridge will be a simple span 125 long x 6-10 wide bridge. The new bridge will be a prefabricated tubular steel truss with timber decking and concrete abutments.
Rocky Creek Bridge Replacement
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Replace the Rocky Creek bridge on the EN Ranger District with a new bridge.
TN ERFO FS CHRKE804 2020-2(6)
- Award expected
- Work starts Dec 2026
- Estimated value
- $5M to $9.9M
- Set-aside
- HUBZone
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
During the February and April of 2020, a series of heavy rain events caused significant roadway damages within the Cherokee National Forest. The damaged roadways prevent roadway public access into various points of the Cherokee National Forest. Damages include large landslides, roadway and shoulder washouts, clogged or damaged culverts, and other miscellaneous work. Project TN ERFO FS CHRKE804 2020-2(6) will Repair storm and flood damage on Baker Creek Road (FS 55).
TN NP GRSM 11(5)
- Award expected
- Work starts Dec 2026
- Estimated value
- $20M to $49M
- Set-aside
- No set-aside
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Replacement of Wiley Oakley Drive Crossover Bridge, Structure Number 5460-087P, with a new flyover bridge.
PR FS ELYUN 10(3)
- Award expected
- Work starts Dec 2026
- Estimated value
- $1M to $1.9M
- Set-aside
- HUBZone
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project consists of the repair of landslides, embankments, drainage improvements, asphalt pavement, and other miscellaneous work at two locations along routes PR-903 and FS-10.
WI FLAP SHLBY LACRS(1)
- Award expected
- Work starts Dec 2026
- Estimated value
- $500K to $999K
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The proejct consists of construction of a new asphalt access road, railroad crossing, and parking area. The work includes roadway obliteration, grading, drainage, aggregate base, asphalt concrete pavement, signing, and other miscellaneous work.
ND OMAD 2025(1) Minuteman Missile Access
- Award expected
- Work starts Dec 2026
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of up to 27 culverts.
AZ FLAP PIM 510(1A) Sabino Canyon Road
- Award expected
- Work starts Dec 2026
- Estimated value
- $500K to $999K
- Set-aside
- HUBZone
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
DC NP ROCR Multi(1)
- Award expected
- Work starts Dec 2026
- Estimated value
- $5M to $9.9M
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Project DC NP ROCR Multi(1) consists of pavement rehabilitation and drainage and safety improvements along Wise Road, West Beach Drive, Glover Road/Ridge Road, Bingham Drive, Morrow Drive, and Ross Drive in Rock Creek Park. The work will include milling and overlay, full-depth patching, curb and gutter replacement, shoulder reconditioning, drainage improvements, inlet replacement, and other miscellaneous work.
CO NP ROMO 407(1) Holzwarth Culvert
- Award expected
- Work starts Dec 2026
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project will replace the deficient Holzwarth Culvert (Structure No. 1520-029S), a six-barrel corrugated metal arch pipe culvert on the Holzwarth Access Road with a steel girder bridge.
NC NP BLRI STR(1)
- Award expected
- Work starts Dec 2026
- Estimated value
- $5M to $9.9M
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The project consists of repair and rehabilitation of tunnels 135P, 148, 153P, 155P and 157P along the Blue Ridge Parkway.
VI DCP 34(1) - Contract 3
- Award expected
- Work starts Dec 2026
- Estimated value
- $100M to $249M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The primary objectives of the proposed contract are to widen and reconstruct Veterans Drive, enhance pedestrian and vehicular safety, and improve drainage of the roadway prism. The project proposes a four-lane roadway with two lanes in each direction with a median left turn lane and new promenade along the oceanside for an approximate distance of 2,577 ft. (0.49 mi). This is to be done while preserving the integrity of all historic features or other important roadside elements.
WA NP OLYM 12(8) Hurricane Ridge Rockfall Mitigation MP 9.4
- Award expected
- Work starts Dec 2026
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
WA NP OLYM 12(8) Hurricane Ridge Rockfall Mitigation MP 9.4 - Complete rock scaling a roadway safety improvements to minimize rock falling on the roadway.
OR FS FREWN602 28(1) Road 28 Reconstruction
- Award expected
- Work starts Dec 2026
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
OR FS FREWN602 28(1) Road 28 Reconstruction - Road, Highway, and/or Bridge Construction Project
YDP Pavement Repair Project (LCB)
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Repave and/or repair various areas within the Yuma Desalting Plant (YDP). Lower Colorado Basin
BGNDRF pavement repairs & stormwater man
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Brackish Groundwater National Desalination Research Facility (BGNDRF) pavement repairs & stormwater man
0301 Q4 ENG 06 249E Road Surfacing and Stabilization NEW OUT
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Road Maintenance for 249E Road Active Management project
WA ERFO NPS MORA 2022-1(1) Mount Rainier ERFO Repairs 2022
- Award expected
- Work starts Dec 2026
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
WA ERFO NPS MORA 2022-1(1) Mount Rainier ERFO Repairs 2022 - Road, Highway, and/or Bridge Construction Project
SJC OSO Bypass Road Crossing Repairs (UCB)
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
SJC OSO Bypass Road Crossing Repairs (Upper Colorado Basin)
Repave asphault areas around the VAB LCC consisting of parking areas and roadways approximately 10 acres.
- Award expected
- Q1 FY2027
- Solicitation expected
- Q3 FY2026
- Estimated value
- $501K to $1M
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Repave asphault areas around the Vehicle Assembly Building (VAB) Launch Control Center (LCC) consisting of parking areas and roadways approximately 10 acres.
TN ST TWRA A153(2)
- Award expected
- Work starts Jan 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Otter Creek Road Bridge Replacement
AZ BL COLO 7528(1) Burro Creek Road
- Award expected
- Work starts Jan 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety.
Ft. Stanton NCA Rob Jagger's Rec Site Upgrades/Rio Bonito Bridges
- Award expected
- Work starts Jan 2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
RBAL Lincoln bridges were washed out by a flood. Historically when the bridges that had been used for the last 20 years previous the last flood, we would take a backhoe out and reset the bridges. Three total bridges were lost in the final flood event and could not be used again. The bridges will be ADA accessible, but the trails may not be so depending on weather events.
Road Repair with Soil Nail Contract, ERFO Sites
- Award expected
- Work starts Jan 2027
- Estimated value
- $500K to $999K
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
One contract to repair four road sites (Upper Rock Creek, Lower Signal Tree, Coal Creek, and South Fork Coos River Mainline MP 2.0) with soil nailing to rebuild the road prism. The sites are located on four different road locations on the Coos Bay District. Storm damage caused road failure. These high priority roads are needed to provide reliable safe access for timber haul, public use, wildfire suppression, and emergency response on high priority roads on BLM Coos Bay District, OR.
CO FLAP MEVA TR(1) PATH TO MESA VERDE
- Award expected
- Work starts Jan 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
TN NP NATR 1H12
- Award expected
- Work starts Jan 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Service-disabled veteran-owned
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Overlay Park Road - PM Project from MP 363.73 - MP 371.02
CA NP KICA PMS(1) Pavement Preservation KICA Cedar Grove
- Award expected
- Work starts Jan 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
CA NP KICA PMS(1) Pavement Preservation KICA Cedar Grove - Pavement Preservation in the California National Parks
ID BOUNDARY 5806(1) Riverside Road Improvements
- Award expected
- Work starts Jan 2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
ID BOUNDARY 5806(1) Riverside Road Improvements - The project includes widening from 28 to 32 feet and adjusting the profile grade to allow for a larger underpass. The improved roadway will allow for safer travel along the route.
ID ERFO FS 2022-1(1) Nez Perce-Clearwater Repairs 2022-1
- Award expected
- Work starts Jan 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
ID ERFO FS 2022-1(1) Nez Perce-Clearwater Repairs 2022-1 - Road, Highway, and/or Bridge Construction Project
OR FLAP DOT CRGNSA 100(7) Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthon Trailhead
- Award expected
- Work starts Jan 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
OR FLAP DOT CRGNSA 100(7) Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthon Trailhead - Complete connection and new path from Mitchell Point Tunnel to the Ruthon hiking trailhead
Building 1916-T2 Stormwater Drainage Repair and Parking Lot Asphalt Re-sealing Project
- Award expected
- Current contract ends Jan 2027
- Estimated value
- $250K to $7.5M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Source: DOE acquisition forecastSee the contact and incumbent, free
OR FLAP DOT CRGNSA 100(7), Histroic Columbia River Highway State Trail, Mitchell Point Cr. To Ruthton Trailhead
- Award expected
- Work starts Jan 2027
- Estimated value
- $10M to $19M
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Complete connection and new path from Mitchell Point Tunnel to the Ruthon hiking trailhead
STEA-P1 Pavement Preservation
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
NER in coordination with EFL proposes to preserve roadway and parking paving.
STEA-B1 Bridge Preservation
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
NER in coordination with EFL proposes to preserve S. Washington Ave bridge
BIBE - 6138 - Improve Entrance to Chisos Basin Campground for Increased Visitor Safety & Enjoyment
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project includes redesign of and resurfacing 13,000 square feet of roadway and rerouting 6,000 square feet of roadway to improve the entrance to the Chisos Basin Campground. This work will be done by contract.
Rehabilitate End Section of Riverside Walk
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Rehabilitate End Section of Riverside Walk by removing and replacing roughly 2000 linear feet of concrete tread. Project would involve removing 160 cubic yards of failing concrete tread and replacing with similar yardage of new concrete containing rebar reinforcement and slip dowl joints.
LIBI - 12777 - Reconstruct Park Roadway and Parking Areas Phase 2
- Award expected
- FY2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The project includes; paving, base course, box culverts, pavement striping, permanent signing, curbing, grading, parking reconfiguration, sidewalks, ADA access, and revegetation as needed. Rehabilitation and minor reconstruction of the Tour Road at Little Bighorn Battlefield National Monument. The Tour Road is 5.2 miles in length and has a sub-standard width for the majority of its alignment and limited shoulders which does not accommodate two-way traffic.
GRCA - 18600 - Kaibab Suspension Bridge (Black Bridge) Maintenance
- Award expected
- FY2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Perform maintenance work including wood deck removal and replacement, steel deck removal and replacement, and recoating.
DINO - 18696 - Repair Damaged Sections of Echo Park Road
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project will repair three sections of Echo Park Road, totaling 3,370 linear feet of unpaved road. Work will include grading, ditching, embankment reinforcement, and replacing two culverts. Work will be completed by contract.
ROMO - 14937 - Rehabilitate Utility and Housing Area Roadways and Parking Areas, Phase 1
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project will address Federal Highways Administration (FHWA) recommended work for the pavement in the central utility area and parking for building 48 in the Headquarters East administrative area Approximately 15,700 square yards (sy) of asphalt pavement will be rehabilitated by milling and overlaying the top 2.5 inches (in).
DINO - 18710 - Repair Damaged Sections of Island Park Access Road
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project will repair three sections of Island Park Road, totaling 570 linear feet of unpaved road. Work will include grading, ditching, embankment reinforcement, and replacing one culvert. Work will be completed by contract.
GRCA - 16269 - Ribbon Falls Bridge Replacement
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project will be replacing the Ribbon Falls Bridge. The previous bridge was damaged and subsequently removed. This has led to hikers traversing down across the Bright Angel Creek and damaging the sensitive riparian area. This project will offer a long-term, sustainable, and safe solution for traversing the creek crossing.
Repair Access Road to Yarborough Pass
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The proposed project will repair and upgrade Yarborough Pass by repairing the current road, installing culverts, replacing entrance and road gates, installing a protective barrier along the road providing access to primitive campsite and recreational area. This project will use day labor and the improvements will protect natural resources and enhance the park’s visitor experience.
Rehabilitate Sheep Mountain Road
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Project would rehabilitate Sheep Mountain Road from mile marker 4.5 to mm 7.1. This area has the most resource damaged and would be mitigated by this project.
GRCA - 18379 - Repair W1 Road at North Rim
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Repair W1 access road at North Rim to prevent further erosion exposing main electrical feed for the Park and restore use for administrative and fire use.
CANY - 15661 - Rehabilitate Grand View Point Parking Area at Island in the Sky District
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project will complete the formalization of nearly 60 existing parking stalls on the Grand View Point Overlook loop by paving the previously reinforced road shoulder and striping the area to maximize parking efficiency and space allocation.
GRTE - 15182 - Colter Bay Developed Area Accessibility Improvements
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The Colter Bay developed area is located on the eastern shore of Jackson Lake. This project proposes accessibility improvements, including adding or adjusting curb cuts from parking areas to sidewalks, modifying sidewalk slope angles, and reducing tripping hazards. These upgrades will create accessible routes between amenities, including concession-operated facilities, and ensure compliance with current Architectural Barriers Act Accessibility Standards (ABAAS).
Perform Pavement Preservation Projects
- Award expected
- FY2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project will fund pavement preservation on routes (access roads, parking areas, and other asphalt paved routes) within the park. There are a variety of pavement preservation treatment types, and there are several variables to consider when choosing the right treatment. The specific treatment will be determined during project scoping.
SHEN - 13718 - Rehabilitate Big Meadows Picnic Area in Shenandoah National Park
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project will replace 2,865 linear feet of crumbling sidewalks with new asphalt walkways addressing Architectural Barriers Act (ABA) requirements for the sidewalk and key picnic site pads. The project will also rehabilitate 5 drinking fountains that have begun to crumble and are in need of repointing and to have upgraded plumbing fixtures installed. the project will restore the cultural landscape by planting trees to improve visitor satisfaction.
SHEN - 13717 - Rehabilitate Pinnacles Picnic Area in Shenandoah National Park
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The project will replace 2,381 linear feet of crumbling sidewalks with new asphalt walkways addressing Architectural Barriers Act (ABA) requirements for the sidewalk and key picnic site pads; rehabilitation of 5 drinking fountains and associated plumbing fixtures; Replace, provide and relocate 3 dumpster pads. This will take place at Pinnacles Picnic Area in the Central District of Shenandoah National Park. Work will likely start in early Spring and extend into the summer months.
SHEN - 13719 - Rehabilitate Dickey Ridge Picnic Ground in Shenandoah National Park
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project will replace 3,472 linear feet of crumbling sidewalks with new asphalt walkways addressing Architectural Barriers Act (ABA) requirements for the sidewalk and key picnic site pads; rehabilitation of 5 drinking fountains and associated plumbing fixtures; Replace, provide and relocate 2 dumpster pads at Dickey Ridge Picnic Ground. The project will take place in the North District of Shenandoah National Park. Construction is likely to begin in early spring and finish in summer.
GRSM - 13583 - Restripe Roads Parkwide
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Restripe deteriorated road striping for miles of park roads in need
Recondition Ditches and Clean Culverts in Port Gibson District of Natchez Trace Parkway
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
GRSM - 15339 - Accessible Connectivity at Cable Mill
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Contract construction services to provide accessible connectivity walkway in the Cable Mill area of the Great Smoky Mountains National Park
CARL - 12217 - Hurricane HELENE - Install Permanent Footbridge on the Front Lake Trail
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Two footbridges destroyed by the Helene will be permanently replaced with a single elevated pedestrian bridge, approximately 110 feet in length. The new structure will span the entire impacted area where Hurricane Helene’s flooding eroded the small central island that previously supported the two independent bridges. The permanent bridge will be designed and constructed through contract.
BISO - 13386 - Conduct Permanent Stabilization Repairs to Station Camp Road
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Station Camp Access Road experienced slope failure in three areas of road embankment during record rain and flood events, both in February 2019. The Big South Fork NRRA implemented interim control measures to allow for safe travel to the busy area of the National Park. Permanent Stabilization measures will be implemented to prevent future erosion issues in the trouble-prone area. Project will be designed, implemented and overseen by the Army Corps of Engineers through an Interagency Agreement.
KAWW - 13854 - Rehabilitation of Whetstone Bridge Deck
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Rehabilitate and repair Whetstone Bridge deck structure. Remove existing 4X8X16 rotten Hemlock Pine planks and replace in kind. Replace any damaged floor beams. Replace damaged curbs in kind. Replace deficient steel railing system. Remove all construction debris and old timbers from the site.
BOST - 15967 - Hardscape repairs and rehabilitation
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This contract will address concrete sidewalk resurfacing needs at Dorchester Heights, Bunker Hill and Charlestown Navy Yards. This will also include sinkhole/storm drain repairs and pedestrian crosswalk repairs in the Navy Yard. Seasonal repairs to brick and cobblestone areas to include re-leveling roots damage and frost heaves. Also included is a Navy Yard wide road and pedestrian crossing line striping.
SHEN - 13533 - Installation of new guard rail in the big meadows area of Shenandoah National Park for visitor safety
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project involves the installation of 270 linear feet of steel-backed log guard rail at the Dark Hollow Falls trail parking area and 1800 linear feet along Skyline Drive adjacent to Big Meadows. The project is likely to start in early spring when the ground has thawed and will take place in the Central district of Shenandoah National Park at the most popular camping and lodging area in the park.
EVER - 12620 - Cyclic Gravel Road Maintenance - Flamingo & Pine Island
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project will maintain the structural integrity, drainage, and drivability of approximately 4.5 miles of gravel roads in the Pine Island and Flamingo districts. Cyclic maintenance of gravel roads consists of two activities: regrading and installation of new gravel.
CHOH - 13196 - Rehabilitate and Improve Visitor Experience at Potomac (Alexandria) Aqueduct
- Award expected
- FY2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Restore the Potomac Aqueduct in Washington, DC as a viewing platform for its historical and scenic viewsheds of the District and Virginia. Currently, with regularity visitors fell from its heights of about 30-40 ft to the road/trail or riverbed below resulting in many injuries and deaths over a few decades. Project would formalize this structure as a visitor amenity
CHOH - 13195 - Rehabilitate C&O Canal Towpath - Georgetown/District of Columbia
- Award expected
- FY2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Rehabilitating the historic C&O Canal towpath within Washington, DC, with a focus on the Georgetown section. Portions of the towpath will be restored to its historical width. Unmapped and encroaching subsurface utilities will be addressed. Project aims to also resolve stormwater ponding issues and improve signage for both wayfinding and interpretive wayside exhibits. Project is expected to come from funding provided by the District of Columbia.
CHOH - 13194 - Resurface Towpath Miles 5.02-16.64, 116.04-122.96, 122.97-124.38
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This is an ongoing, multi-year program to rehabilitate the full 184.5 miles of the C&O Canal Towpath, the central feature of the C&O Canal National Historical Park, visited by over 4 million people annually. Annually, over $1 million in funding is transferred to NPS through the Maryland State Transportation Alternatives Program for his project, making it a high priority for the park to ensure the state's funds are spent responsibly and on-time. Project will enhance safety along the towpath.
PRWI - 18280 - Preserve Bridges at PRWI
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Bridge Preservation: bridge preservation for FLTP eligible bridge structures categorized under FHWA bridge inspection/management program as Priority “C” and select Priority “D”. Any work of similar scope completed under this project for non-FLTP eligible facilities is NPS funded.
PRWI - 18196 - Rehab Oak Ridge Section C
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Rehabilitate Pavement at Oak Ridge Campground Loop Road and Campsites in Section C.
MANA - 14407 - Resurface Visitor Resource Protection and Quarters 9 Roads and Parking Lots
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Project will use contracted services to correct paved surface deficiencies according to treatments recommended by Federal Highways Cycle 6 inspection report of January 2019. Approximately 6,600 Square Feet of the access road to Quarters 9 will be milled and resurfaced and a new culvert will be installed at the road entrance. Visitor Protection Access Road will be milled and resurfaced from the Rout-29 to the turn-around at the office and quarters 6. Additionally, the 5,000 Square Foot visitor pr
RESURFACE DETERIORATED VISITOR USE PARKING AREAS Stone Bridge Parking, Stone House parking
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Correct paved surface deficiencies according to treatments recommended by Federal Highways Cycle 6 inspection report of January 2019. A total of 96,659 Square Feet of popular Visitor Parking Areas will be milled and resurfaced and remarked at five key interpretive stops located throughout Manassas National Battlefield Park. Two culverts will be installed at the Stone House Parking Area and the Rosefield Parking Area.
DEVA - 15042 - Rehabilitate Scotty's Castle Visitor Parking
- Award expected
- FY2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Repave and reconfigure 37,180 SF of parking to add a bus drive-through lane. Pave 20,220 SF (entry, bus lane, bus parking) with 6" HMA over 10" base and 16,300 SF with 4" HMA over 9" base; pave three ABA stalls (660 SF) and walkways (4,225 SF) in concrete. Stripe for 50 car, 3 ABA, and 5 bus spaces. Replace storm sewer and fire hydrants, re-grade overflow/staff parking, and reproduce 325 LF of historic fencepost-and-wire fence.
WHIS - 17888 - Crystal Creek Road Slope Stabilization
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction contract to stabilize and repair two downhill slope failure locations along Crystal Creek Road. Work will include slope stabilization, roadway-edge restoration, drainage improvements, guardrail replacement, and associated site restoration in accordance with final design.
OLYM - 12176 - Interagency Acquisition Agreement between OLYM and Federal Highway Administration, Western Federal Lands Highway Division
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The purpose of this agreement is to allow for NPS to provide funding for the pavement preservation project to Federal Highway Administration, Western Federal Lands Highway Division (FHWA-WFLHD) for services in connection with survey, construction, maintenance, or improvement of roadways, and parking lots within Olympic National Park (OLYM), a unit of the National Park Service located within Interior Regions 8,9,10, and 12. The project will perform pavement preservation treatment on concessions r
JOTR - 12326 - Roadside Brush, Fog Seal and Restripe 25.5 Miles of East West Highway in Joshua Tree National Park
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project will conduct roadside brushing on Joshua Tree's East West Highway in curbed areas followed by a fog seal and restriping of the roadway.
YOSE - 15222 - El Portal Gabion Road Erosion Repairs
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Repair the road shoulders that have eroded due to heavy rain events
PORE - 12191 - Repair Coast Camp Road
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Repair approximately 2,185 linear feet of Coast Camp Road by raising and stabilizing flood-damaged roadway sections, improving drainage through culvert replacement and installation, restoring the road surface, and implementing erosion control measures. The project will improve visitor and operational access, reduce flooding impacts, and protect sensitive natural resources through biological monitoring and resource protection measures during construction.
YOSE - 13886 - Crane Flat Helibase Road Repair (Full Depth Reclamation) Design / Compliance
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Crene flat helibase road needs major overhaul for emergency response and patient safety during transport.
HAVO - 14719 - Regrade Roadways at Kahuku Above the Cross Fence
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Replace lost road surface with crushed aggregate base and grade road to restore crown and drainage features on 2 miles of administrative roadway above the cross fence at the park’s Kahuku Unit.
GOGA - 18556 - Repair Subgrade and Resurface Sutro Height Loop Trail
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The Sutro Heights Loop Trail consists of a combination of surfaces, decomposed granite and asphalt. GGNRA plans to grind the surface, repack and improve the subgrade, and then lay a new surface on the Trail.
ME NP ACAD BRG(2)
- Award expected
- Work starts Feb 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The primary objective of the proposed contract is to rehabilitate three bridge structures. The work includes, structural excavation and backfill, repairing concrete, membrane waterproofing, cleaning and resealing joints, temporary traffic control detour, cleaning stone masonry surfaces, asphalt concrete pavement resurfacing, and other miscellaneous work.
FR118 MP 6.1 North Branch of the Whiteface River Bridge Superstructure Replacement
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The project is replacing a concrete deck with widespread damage and a deteriorating steel superstructure. The new superstructure will be precast concrete beams and the decking will be cast in place reinforced concrete.
AK NPS DENA 10(64), Re-pave Riley Creek CG Roads
- Award expected
- Work starts Feb 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This work consists of: Aggregate base, paving, striping and pavement repairs of the Riley Creek Campground in Denali National park and Pavement repairs along the park Road
AK FLAP ANCHORAGE 2021(1) Far North Bicentennial Park Enhancements
- Award expected
- Work starts Feb 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construct a new bridge and boardwalk along trail of the Far North Bicentennial Park
ID FLAP KOOTEN 8450(1) Yellowstone Trail Road Segment 1
- Award expected
- Work starts Feb 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
ID FLAP KOOTEN 8450(1) Yellowstone Trail Road Segment 1 - Repair adjacent failing rock slope, resurface roadway and construction a moment slab to shif the roadway away from the existing rock slope
UT NP DINO PMS(1) Pavement Preservation DINO
- Award expected
- Work starts Feb 2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
UT NP DINO PMS(1) Pavement Preservation DINO - Road, Highway, and/or Bridge Construction Project
WA ERFO FS MTBKR605 2020-1(2), Forest Road 7810 MP 0.1 Repair
- Award expected
- Work starts Feb 2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The project will repair the bridge abutment and bridge deck that was damaged during a rain event. The bridge developed a large hole in the deck as a result of the storm. The project improve the safety to the traveling public.
NP NER PMS BMS FY25(2)
- Award expected
- Work starts Mar 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The project consists of pavement preservation of roadways and parking areas and bridge maintenance for various Mid-Atlantic region parks. Work includes micro-surfacing, thin lift asphalt overlay, chip seal, crack cleaning and sealing, asphalt concrete pavement patching, pavement markings, minor bridge repair works, and other miscellaneous work.
ID FLAP CLEAR 4783(1) Dent Bridge Road Improvements
- Award expected
- Work starts Mar 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
ID FLAP CLEAR 4783(1) Dent Bridge Road Improvements - Repair/rehabilitate 15 miles of Dent Bridge Road between Orofino and Elk River Idaho to provide safe access to the Clearwater National Forest. Replace guardrail as needed.
NEW MALSR Pier Refurbishment
- Award expected
- Work starts Mar 2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
IIJA _ Replace building and pier @ NEW MALSR, New Orleans LA, 21006689, execution funds
MT NP GLAC 14(5) Many Glacier Road Landslides
- Award expected
- Work starts Mar 2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
MT NP GLAC 14(5) Many Glacier Road Landslides - Road, Highway, and/or Bridge Construction Project
WY NP YELL 10(24) Grand Loop Road Norris to Golden Gate, Phase 3
- Award expected
- Work starts Mar 2027
- Estimated value
- $50M to $99M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
WY NP YELL 10(24) Grand Loop Road Norris to Golden Gate, Phase 3 - Road, Highway, and/or Bridge Construction Project
Tipsaw and Buzzard Roost Recreation Area Rehabilitation
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Tipsaw Main Road FR1122.00 was reconstructed in 2010 to include culverts and subgrade stabilization with asphalt patches. The proposed reconstruction to include pavement overly of main rd. boat ramp beach parking lot and dump station. Bridge deck replacement new guard rails and scour protection at the abutments. This will fully resurface all Tipsaw Lake Recreation Area roads that began with NAMP Project ID 0912-FY21-9BW Buzzard Roost Road FR1165.030 reconstruction to include pulverizing the asp…
Road 42 GAOA Asphalt reconstruction continuation
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This Contact will be a continuation of the 42 road GAOA Asphalt repair. The work will consist of reconstructing sections of the 42 road asphalt surface and road base and associated work on the Ochoco National Forest
WY BR WYAO US20(1) US 20 AND HAYDEN ARCH BRIDGE REPAIRS
- Award expected
- Work starts Apr 2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
WA ERFO FS MTBKR605 2020-1(2) Forest Road 7810 MP 0.1 Repair
- Award expected
- Work starts Apr 2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
WA ERFO FS MTBKR605 2020-1(2) Forest Road 7810 MP 0.1 Repair - Road, Highway, and/or Bridge Construction Project
Camp 7 Campground Repaving Project
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Pulverize existing pavement add some gravel and repave campground roads and boat launch at Camp 7 campground.
MT NP YELL 12(5), Northeast Entrance Road, MP 27.2 - MP 28.6
- Award expected
- Work starts Apr 2027
- Estimated value
- $10M to $19M
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Complete reconstruction of the Northeast Entrance Road
CO BR UCPO Blue Mesa Road(1) Blue Mesa Road
- Award expected
- Work starts Apr 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Blue Mesa Road is a 1.44-mile corridor located in Gunnison County, CO and provides access to the Bureau of Reclamation (BOR) Power Plant and Pine Creek Trailhead recreational activities on the Curecanti National Recreational Area.
UT NP ARCH 100(2) - Bridges on Delicate Arch Road
- Award expected
- Work starts Apr 2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100’ span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash.
FL ERFO FW JND 2022-1(1)
- Award expected
- Work starts Apr 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project consists of partially removing and reconstructing the Shell Mound Boardwalk that sustained extensive damage from Hurricane Ian at J.N. Ding Darling National Wildlife Refuge, Lee County, Florida.
AK NPS DENA 10(64) Re-pave Riley Creek CG Roads
- Award expected
- Work starts Apr 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
AK NPS DENA 10(64) Re-pave Riley Creek CG Roads - Road, Highway, and/or Bridge Construction Project
Montrose Public Land Center Pavement
- Award expected
- Work starts May 2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project will complete deferred maintenance and repair the deteriorated and failing asphalt pavement parking lot at the Montrose Public Lands Center. This project was specifically authorized in Great American Outdoor Act (GAOA).
ID ERFO FS 2022-1(1), Nez Perce-Clearwater Repairs 2022-1
- Award expected
- Work starts May 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The work includes road slope repairs, wall construction, culvert replacement for five road sites damaged by rainstorm.
Pavement Installation
- Award expected
- Work starts May 2027
- Estimated value
- $500K to $999K
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Installation of full depth pavement at multiple locations within the vicinity of GLS facilities.
CA NP MULTI PMS(2) Pavement Preservation DEVA Phase 1 and MANZ
- Award expected
- Work starts May 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
CA NP MULTI PMS(2) Pavement Preservation DEVA Phase 1 and MANZ - Road, Highway, and/or Bridge Construction Project
MT BLM WMDD 8804(2) Garnet Ghost Town Roads Rehabilitation
- Award expected
- Work starts May 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
MT BLM WMDD 8804(2) Garnet Ghost Town Roads Rehabilitation - Road, Highway, and/or Bridge Construction Project
Four Corners Regional MATOC - 2027
- Award expected
- Work starts May 2027
- Estimated value
- $250M to $499M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Multiple Award Task Order Contract (MATOC) for construction services located in Arizona, New Mexico, Nevada, Colorado, and Utah
OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
- Award expected
- Work starts Jun 2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Small business
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The project will provide new driving surface, entrance gates, culverts, Architectural Barriers Act (ABA) compliant parking spot, and ABA compliant curb ramp.
NV FTNP LAKE 237(2) COTTONWOOD COVE ACCESS ROAD
- Award expected
- Work starts Jun 2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
NE NP AGFO 10(1) 200(1) RIVER ROAD & HQ ACCESS
- Award expected
- Work starts Jun 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
AZ FTNP GRCA 14(1) NORTH ENTRANCE ROAD
- Award expected
- Work starts Jun 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
CA FLAP MRN CR107(1) MUIR WOODS ROAD
- Award expected
- Work starts Jun 2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
ID FS NEZPR117 100(1) Kamiah Pierce Road Repairs
- Award expected
- Work starts Jun 2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
ID FS NEZPR117 100(1) Kamiah Pierce Road Repairs - Compete new pavement and spot improvements along for Road 100 in Nez Perce National Forest
OR FS MULTI 2023(2) Mt Hood Drainage Structures
- Award expected
- Work starts Jun 2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
OR FS MULTI 2023(2) Mt Hood Drainage Structures - Road, Highway, and/or Bridge Construction Project
WA ERFO FS GIFPN603 2022-1(1) Gifford PiNCHot ERFO Repairs 2022
- Award expected
- Work starts Jun 2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
WA ERFO FS GIFPN603 2022-1(1) Gifford PiNCHot ERFO Repairs 2022 - Road, Highway, and/or Bridge Construction Project
ND NP THRO 10(6) NORTH UNIT LOOP ROAD
- Award expected
- Work starts Jul 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
CA BR NCAO SHAS(1) UPPER VISTA HOUSE ROAD
- Award expected
- Work starts Jul 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
Selway Suspension Bridge Reconstruction
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project will replace all of the wood components on this 285-ft long suspension bridge over the Selway River in the Selway Bitterroot Wilderness. Wood compenents include floor beams deck joists decking railing and running planks. The bridge is located 9 miles downstream from the nearest road access.
AK FLAP DENALI 2021(1) Denali Park Pedestrian Bridge and Trail
- Award expected
- Work starts Jul 2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
AK FLAP DENALI 2021(1) Denali Park Pedestrian Bridge and Trail -Road, Highway, and/or Bridge Construction Project
NM FW VDO T300(1) PERIMETER TRAIL
- Award expected
- Work starts Aug 2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
AZ IHS NAVAJO(1) HEALTH FACILITIES IMPROVEMENTS
- Award expected
- Work starts Aug 2027
- Estimated value
- $20M to $49M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
MT DAR MALM 2027(1) Defense Access Roads FY 2027
- Award expected
- Work starts Aug 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
MT DAR MALM 2027(1) Defense Access Roads FY 2027 - Resurface the existing missile access roads with gravel and calcium chloride
MT FLAP SILVER 2021(1) Roosevelt Drive Safety and Realignment Project
- Award expected
- Work starts Aug 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
MT FLAP SILVER 2021(1) Roosevelt Drive Safety and Realignment Project - Rehabilitated and re-align the Roosevelt drive to better provide access to the Forest along this route.
MT FLAP BROADWATER 2023(1) Goose Bay Lane
- Award expected
- Work starts Aug 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
MT FLAP BROADWATER 2023(1) Goose Bay Lane - Road, Highway, and/or Bridge Construction Project
NP SER PMS FY26(1)
- Award expected
- Work starts Aug 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The project consists of pavement preservation in 7 parks across Western and Eastern NC. The work includes micro surfacing and/or Chip seal Type 1C with Fog seal, Crack cleaning and sealing, partial and full depth pavement patching, Removal/installation of pavement markings, temporary erosion & sediment control, Temporary traffic control, MUTCD sign replacement and minor safety measures at intersections.
NV FLAP 500(2) RED ROCK TRAIL
- Award expected
- Work starts Sep 2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
US385 Pullout Resurfacing
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
In partnership with South Dakota Department of Transportation this project will resurface five Forest Service pullouts that service five Developed Recreation Sites along US Highway 385. The Department of Transportation is reconstructing 23 miles of Highway 385. The Forest Service portion of the project involves removal and replacement of pavement drainage improvements accessible parking striping and signage. These pullouts are immediately adjacent to US Highway 385 which SD DOT will be reconstr…
MD NP GWMP 6(2)
- Award expected
- Work starts Sep 2027
- Estimated value
- $100M to $249M
- Set-aside
- No set-aside
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The project consists of the design/build project for replacement of Clara Barton Parkway cantilever and rehabilitation of retaining walls. The project is located in the Town of Glen Echo, Cabin John and Brookmont in Montgomery County, Maryland. This project is intended to address deteriorating cantilever structure and retaining walls to improve functionality, longevity, and safety of the roadway.
Repair (4) Bridges
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Repairs consist of deck rehabilitation, wearing surface rehabilitation, timber girder repair, concrete repairs, and signage replacement of four timber bridges.
Replace Sharkey and South Bridges
- Award expected
- FY2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project is to replace (2) brdges with water control structures
Replace Charivari Creek Bridge - Construction
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Replace BI-2017 Charivari Creek Bridge (Phase 2 - Construction)
Replace B.I.-2019 FA-3 Bridge
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
U.S. Fish and Wildlife Service: Replace B.I.-2019 FA-3 Bridge - Construction Phase
Replace BI-2015 Wade Bayou Bridge
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Replace BI-2015 Wade Bayou Bridge - Construction Phase
Rehabilitate Wildlife Drive
- Award expected
- FY2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
U.S. Fish and Wildlife Service: Rehabilitate Wildlife Drive - Construction Phase
Rehab Storm Damaged Rt #10 Tranberg Road
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
U.S. Fish and Wildlife Service: Rehab Storm Damaged Rt #10 Tranberg Road
Road realignment and erosion repair
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Realign Lift 6 Access Road and repair and armor bank erosion damage
Replace Hardy Creek Bridges
- Award expected
- FY2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Replace upper and lower Hardy Creek bridges along the access road at Pierce NWR.
San Bernard Storm roadwork
- Award expected
- FY2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
U.S. Fish and Wildlife Service: San Bernard Storm Roadwork
NC ERFO FS NFNC811 2024-3(2)
- Award expected
- Work starts Oct 2027
- Estimated value
- $100M to $249M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Repair Hurricane Helene damage on South Toe River Rd, Curtis Creek Rd, Stony Fork Rd, & Big Ivy Rd.
NM FLAP DON C077(2) DRIPPING SPRINGS ROAD
- Award expected
- Work starts Oct 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
NP-NATR 5570-028P
- Award expected
- Work starts Oct 2027
- Estimated value
- $500M to $999M
- Set-aside
- No set-aside
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
The replacement of the John Coffee Memorial Bridge over the Tennessee River of the Natchez Trace Parkway Project NP NATR 5570-028P. The project includes the removal of the existing 4,955-foot-long John Coffee Memorial Bridge and construction of a new bridge, construction of new approach roadways, drainage improvement, improve safety with options for raised profile striping and safety edge, and other miscellaneous work. The project is located in Lauderdale and Colbert Counties, Alabama.
CA NP GOGA 205(2) STINSON BEACH PARKING
- Award expected
- Work starts Nov 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
CO FW RKM 10(1) WILDLIFE DR. & VC PARKING
- Award expected
- Work starts Nov 2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
CO FLAP US550(1) RED MOUNTAIN PASS
- Award expected
- Work starts Nov 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
AZ FLAP PIN FR77(1) EAST PERALTA ROAD
- Award expected
- Work starts Nov 2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
GAOA Grizzly Bear Campground Reconstruction
- Award expected
- FY2028
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
This project will reconstruct the campsite for improved drainage and add modern amenities upgrade the water system reshape and resurface the road and add interpretive panels. Grizzly Bear Campground located two miles from Mount Rushmore is situated at the creek edge and adjacent to steep hills which limit its size. However this project will improve the visitor experience.
CA FLAP CR393400(1) EVERGREEN ROAD
- Award expected
- Work starts Nov 2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
WA ERFO NPS OLYM 2022-1(3) Olympic NPS ERFO Repairs 2022 Road 107 - MP 0.3 to 0.5 and MP 0.8
- Award expected
- Work starts Nov 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
WA ERFO NPS OLYM 2022-1(3) Olympic NPS ERFO Repairs 2022 Road 107 - MP 0.3 to 0.5 and MP 0.8 - Road, Highway, and/or Bridge Construction Project
WA FLAP LEWIS 79908(1) Nisqually River Bridge Scour Protection
- Award expected
- Work starts Nov 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
WA FLAP LEWIS 79908(1) Nisqually River Bridge Scour Protection - Road, Highway, and/or Bridge Construction Project
CO ERFO FS SNJUAN 2026-1(2) WEST FORK TRAIL BRIDGE
- Award expected
- Work starts Nov 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
WA NP OLYM 104(2) Finlet Creek Bridge Rehabilitation
- Award expected
- Work starts Nov 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
WA NP OLYM 104(2) Finlet Creek Bridge Rehabilitation - Road, Highway, and/or Bridge Construction Project
WY NP YELL 15(2) Madison River Bridge
- Award expected
- Work starts Nov 2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
WY NP YELL 15(2) Madison River Bridge - Road, Highway, and/or Bridge Construction Project
CA FLAP SR89(3) LASSEN PEAK HIGHWAY
- Award expected
- Work starts Dec 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
TX ERFO NP BIBE 2025-1(1) NORTH ENTRANCE ROAD REPAIRS
- Award expected
- Work starts Dec 2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
NV BL SONV 500(3) RED ROCK TRAIL
- Award expected
- Work starts Dec 2027
- Estimated value
- $20M to $49M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
UT NP DINO 203(2) ISLAND PARK ROAD REPAIRS
- Award expected
- Work starts Dec 2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
AZ BL COLO 7528(1) BURRO CREEK ROAD
- Award expected
- Work starts Dec 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
CA FTNP YOSE 13(7) BIG OAK FLAT ROAD
- Award expected
- Work starts Dec 2027
- Estimated value
- $20M to $49M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
KS FLAP RSL 15(1) HELL CREEK BRIDGE REPAIR
- Award expected
- Work starts Dec 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
OK FW TSM 10(1) NFH ENTRANCE ROAD AND PARKING IMPROVEMENTS
- Award expected
- Work starts Dec 2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
OK FLAP ALF CR210(1) GARVIN ROAD
- Award expected
- Work starts Dec 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
WY FLAP PAR 6WX(2) SOUTH FORK ROAD
- Award expected
- Work starts Dec 2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
NV FLAP CCRTC ASH(1) ASH CANYON ROAD AND TRAILHEAD
- Award expected
- Work starts Dec 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
Construction of highway, bridges, and roads, and trails
MT DAR MALM 2025(2) Ulm Bridge Replacement
- Award expected
- Work starts Feb 2028
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
MT DAR MALM 2025(2) Ulm Bridge Replacement - Road, Highway, and/or Bridge Construction Project
MT ERFO NP YELL 2022-1(2) Yellowston NP Mammoth to Gardiner Road
- Award expected
- Work starts Feb 2028
- Estimated value
- $250M to $499M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
MT ERFO NP YELL 2022-1(2) Yellowston NP Mammoth to Gardiner Road - Road, Highway, and/or Bridge Construction Project
AK NPS DENA 10(58) Denali Park Road Reconstruction Mileposts 15-32
- Award expected
- Work starts Apr 2028
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237310 Highway, Street, and Bridge Construction
Description
AK NPS DENA 10(58) Denali Park Road Reconstruction Mileposts 15-32 - Road, Highway, and/or Bridge Construction Project
Agencies planning 237310 work
- Department of Transportation: 95 planned
- Department of the Interior: 62 planned
- Department of Agriculture: 15 planned
- Department of Energy: 1 planned
- National Aeronautics and Space Administration: 1 planned
Frequently asked questions
What is an agency procurement forecast?
A procurement (or acquisition) forecast is an agency's list of contracts it plans to buy in the coming months, published before the solicitation is posted on SAM.gov. Agencies publish them so small businesses can prepare. Each entry usually gives the work, the NAICS code, an estimated value range, the expected solicitation or award quarter and whether it may be set aside.
How should a small business use a forecast?
Pick the planned buys in your NAICS codes, then introduce your business to the agency's small business specialist or program office with a short email and your capability statement. Ask how they plan to buy it: set-aside, contract vehicle and timing. Then watch SAM.gov for a sources sought notice or draft solicitation, which often comes first. Contacting the agency early, while the requirement is still being planned, is when you can still influence a set-aside decision.
How accurate are forecast dates and values?
They are estimates. Dates shown as a quarter or fiscal year are the agency's own (the federal fiscal year starts October 1, so Q1 FY2027 is October to December 2026). Values are ranges. Buys slip, change set-aside or are dropped, and some are never posted. Treat a forecast as an early signal, not a promise.
Where does this forecast data come from?
From the agencies' own public forecast sites: GSA's Acquisition Gateway forecast tool (which carries the forecasts of many departments), the Department of Homeland Security's Acquisition Planning Forecast System, and the Department of Energy and NASA acquisition forecasts. FedReady checks them every day. Agencies that aren't listed publish their forecasts elsewhere; Acquisition.gov links to each one.
Keep going
- Open NAICS 237310 contracts, size standard and spending
- NAICS 237310 contracts ending in the next 12 months
- Check whether you're small under 237310
- Forecasts by agency
Forecast data from GSA Acquisition Gateway forecast tool, NASA acquisition forecast and DOE acquisition forecast, public U.S. government information, as of Oct 10, 2026. Forecasts are plans, not promises: dates, values and set-asides change. FedReady is an independent company, not affiliated with SAM.gov or any government agency.