Planned power and communication line and related structures construction contracts from agencies' published procurement forecasts. They come out months before a solicitation is posted on SAM.gov, so there's time to introduce your business and ask how the agency plans to buy the work.
- Planned buys listed
- 59
- Award expected within 6 months
- 38
- Set aside for small business
- 16
- Updated
- Oct 10, 2026
Planned NAICS 237130 contracts, soonest award first
59 listed
Get new NAICS 237130 forecasts by email. Free FedReady accounts get a daily or weekly email with new planned buys and open contracts that match your business.
Email me new forecastsPower Systems Sustainment
- Award expected
- Work starts Oct 2026
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
(back to S status) FSD MALSR conductor and contol cables wiring Design _Basic Ordering Agreement (BOA) /Qualified Vendors List (QVL) order
Pole Hill Controls and Relay Upgrade
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
The Pole Hill Powerplant Protective Relay, Annunciation, and Controls Replacement project is a multi-year capital investment to replace aging and obsolete protective relays, auto-synchronizer equipment, annunciation systems, control panels, fiber optics, and station service components that are over 60 years old and increasingly unreliable
Flatiron Substation 2025 Breaker Replacement with principal components of substation work to include demolition and site development…
- Award expected
- Current contract ends Dec 2026
- Estimated value
- $250K to $7.5M
- Set-aside
- Small business
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Flatiron Substation 2025 Breaker Replacement with principal components of substation work to include demolition and site development, foundations and platforms for substation electrical equipment, furnish and install galvanized steel structures, install Government-furnished power circuit breakers, and furnish and install high voltage bus, grounding system, conduit, insulated cables.
Source: DOE acquisition forecastSee the contact and incumbent, free
GC Replace Station Service Transformers
- Award expected
- FY2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Station service transformers K5C and K4C at Glen Canyon (GC) Dam
Crow Creek Transformer Replacement
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Small business
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Step Down Transformer replacement, including transportation and commissioning.
Contracted Skilled and Qualified Tradesmen
- Award expected
- Work starts Dec 2026
- Estimated value
- $5M to $9.9M
- Set-aside
- Indian economic enterprise
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Contractor to supply skilled and qualified tradesman that can operate with less than normal supervision and are fully capable of Low and Medium Voltage Power System Construction, Troubleshooting, Maintenance, Repair, and Emergency Response; Power Utility Wood Pole Testing; Substation Inspections, Operation, Maintenance, Troubleshooting, Testing, Repair, and Emergency Response; Metering and/or Meter Reading.
Maintenance Base Power Distribution Upgrades
- Award expected
- Work starts Jan 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- Small business
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Installation of two new 13.8KV to 480V transformers, ATS's, Emergency Generators and Mobile Loadbank
ZION - 14151 -Emergency Maintenance Radio Communications West Temple Repeater
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
All primary emergency, maintenance and administrative radio communications are broadcast using Zion’s West Temple repeater. This project will replace an eight foot by ten foot aging West Temple repeater shelter (April 2004) and radio equipment (early 1980’s) with a modern, self-contained, prefabricated metal radio repeater shelter. The concrete pad upon which the existing shelter now rests will be reused as a proper landing zone for helicopter operations.
YELL - 12549 - Fiber to Mount Washburn - Tower Falls - Tower Junction
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Provide Fiber Internet Services and Installation services to NPS visitor facilities, first responder radio sites, operational facilities, and ranger stations to support voice, DOI WAN, YELL LAN, and land mobile radio. Replace failing outside copper plant. Underground fiber from Canyon and Tower POP to NPS Facilities and Quarters for business and residential broadband and dark fiber network services.
DRTO - 12724 - Replace Communication Tower on Garden Key
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Replace the deteriorated 70-foot communications tower at Fort Jefferson, which has reached the end of its service life due to extensive corrosion. Work includes removal of the existing tower and associated infrastructure, installation of a new communications tower and foundation, and rehabilitation of the communications equipment room with new walls, ceiling, door, and HVAC to protect critical radio and IT systems.
GARI - 17062 - NERI - 16976 - Equipment Installation for Tower Supporting Gauley River National Recreational Area- compatible with WV Statewide Radio Network
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
This project focuses on selecting and installing the communication equipment that will be placed on the new tower supporting GARI operations. The equipment must be compatible with the statewide public safety radio system used throughout West Virginia, including systems used by local emergency responders and partner agencies. This ensures that park staff can communicate directly with those agencies during routine operations and during emergency situations.
NERI - 16976 - Equipment Installation for Tower Supporting Gauley River National Recreational Area- compatible with WV Statewide Radio Network
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
in the GauleyThis project focuses on selecting and installing the communication equipment that will be placed on the new tower supporting GARI operations. The equipment must be compatible with the statewide public safety radio system used throughout West Virginia, including systems used by local emergency responders and partner agencies. This ensures that park staff can communicate directly with those agencies during routine operations and during emergency situations.
DSC - NER & PRPK - 15505 - CMR- WEST POTOMAC PARK AND TIDAL BASIN REDEVELOPMENT INCLUDING GARDEN OF HEROES
- Award expected
- FY2027
- Estimated value
- $10M to $19M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
CMR- WEST POTOMAC PARK AND TIDAL BASIN REDEVELOPMENT INCLUDING GARDEN OF HEROES
DSC - IMR & MWR - 15582 - CMR- Grand Canyon 257282 - Replace South Rim Wastewater Treatment Plant due to deferred maintenance and difficulty maintain permitted treatment requirements. (GRCA)
- Award expected
- FY2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
CMR- Grand Canyon 257282 - Replace South Rim Wastewater Treatment Plant due to deferred maintenance and difficulty maintain permitted treatment requirements. (GRCA)
DSC - NER & PRPK - 15488 - CMR- EVER 290451 - REHAB PARKWIDE WATER/WASTEWATER (FLAMINGO DIST
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
CMR- EVER 290451 - REHAB PARKWIDE WATER/WASTEWATER (FLAMINGO DIST
DSC - PWR & AKR - 15738 - CMR- Hawai’i Volcanoes National Park (HAVO) 326181- Issuance of construction solicitation for the Rehabilitate Water Treatment System (HAVO)
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
CMR- Hawai’i Volcanoes National Park (HAVO) 326181- Issuance of construction solicitation for the Rehabilitate Water Treatment System (HAVO)
DSC - IMR & MWR - 15583 - CMR- Bandelier National Monument 266697 - Underground Utilities Rehab (BAND)
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
CMR- Bandelier National Monument 266697 - Underground Utilities Rehab (BAND)
DSC - NER & PRPK - 15500 - CMR- National Capital Parks - East 326240A - Great American Outdoors Act N127 - National Capital Parks East. Parkland Portion of Shepherd Parkway. The infrastructure and landscape in the Parkland Area
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
CMR- National Capital Parks - East 326240A - Great American Outdoors Act N127 - National Capital Parks East. Parkland Portion of Shepherd Parkway. The infrastructure and landscape in the Parkland Area of Shepherd Parkway will be rehabilitated to accommodate a
DSC - NER & PRPK - 15491 - CMR- Address Deferred Maintenance at Multiple Sites (Rehab Buildings 120 & 210)
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
CMR- Address Deferred Maintenance at Multiple Sites (Rehab Buildings 120 & 210)
DSC - NER & PRPK - 15504 - CMR- REHABILITATION OF LMRP PLUMBING AND INFRASTRUCTURE
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
CMR- REHABILITATION OF LMRP PLUMBING AND INFRASTRUCTURE
DSC - PWR & AKR - 15734 - CMR- REHABILITATE BARNES POINT WASTEWATER TREATMENT SYSTEMS, OLYM (OLYM)
- Award expected
- FY2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
CMR- REHABILITATE BARNES POINT WASTEWATER TREATMENT SYSTEMS, OLYM (OLYM)
DSC - PWR & AKR - 15743 - CMR- OLYM 340147 - "CONSTRUCT VISITOR CENTER AT HURRICANE RIDGE." (OLYM)
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
CMR- OLYM 340147 - "CONSTRUCT VISITOR CENTER AT HURRICANE RIDGE." (OLYM)
DSC - PWR & AKR - 15727 - CMR- YOSE REHAB HODGDON MEADOW WATER AND SEWER (YOSE)
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
CMR- YOSE REHAB HODGDON MEADOW WATER AND SEWER (YOSE)
DSC - PWR & AKR - 15730 - CMR- Lake Roosevelt National Recretation Area. Replace Dilapidated Docks and Fuel System at Seven Bays Marina (LARO)
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
CMR- Lake Roosevelt National Recretation Area. Replace Dilapidated Docks and Fuel System at Seven Bays Marina (LARO)
DSC - Transportation BC - 15653 - CMR- Address Trails in the North and South Districts, historic structures and harden Hiram Caldwell (GRSM)
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
CMR- Address Trails in the North and South Districts, historic structures and harden Hiram Caldwell (GRSM)
DSC - NER & PRPK - 15492 - CMR- George Washington Memorial Parkway CLBA 312325 - Rehabilitate Clara Barton NHS, award construction contract for life safety improvements
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
CMR- George Washington Memorial Parkway CLBA 312325 - Rehabilitate Clara Barton NHS, award construction contract for life safety improvements
DSC - NER & PRPK - 15497 - CMR- REPLACE ELECTRICAL, HVAC AND ALARM SYSTEMS AND REHABILITATE FOUR HISTORIC STRUCTURES
- Award expected
- FY2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
CMR- REPLACE ELECTRICAL, HVAC AND ALARM SYSTEMS AND REHABILITATE FOUR HISTORIC STRUCTURES
LACL - 17889 - Repair Failing Foundation at the Birch House
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
This project will stabilize the Birch Hill House employee housing duplex by replacing the failing foundation and addressing structural deficiencies in the framing. Project construction will be executed per specifications of the design produced by A/E firm.
MORA - 12879 - Mount Rainier - Longmire Housing Fiber Installation
- Award expected
- FY2027
- Estimated value
- $1M to $1.9M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Project to trench and install 6 SF to each residence in Longmire. Longmire is a complicated campus with existing infrastructure which will need to be avoided when trenching. The entire area is within a historic landmark district with large trees which will require hand-trenching in many areas.
Navigation, Lighting, and Landing
- Award expected
- Work starts Feb 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- 8(a)
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
23980165 23_NM_005907 and 25_NM_007077 Bozeman, MT (BZN) _ RWY 12 SA CAT II Approach Upgrade & RWY 12/30 Extension Equipment & Upgrades Construction w/EOs RVR 19000347, LOC 23004857, GS 23004858, VOR/DME Doppler 23005588
JCN 1505087 MSP FOTS
- Award expected
- Work starts Feb 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
ESTABLISH LIFT IP FOTS at MSP airport in Minneapolis, MN (replace existing Loop 1 fiber transmission lines)
BMT RTR Tower Replacement
- Award expected
- Work starts Feb 2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
REPLACE One (1) 27 Year_Old 30' Guyed Tower With Self Supporting Tower at Beaumont, TX. (Guyed Tower, Systemic, Safety)
Ault Substation Stage 10 to replace 13.8kV oil reactors with government furnished air core reactors, replace six government furnished 230kV…
- Award expected
- Current contract ends Feb 2027
- Estimated value
- $250K to $7.5M
- Set-aside
- Small business
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Ault Substation Stage 10 to replace 13.8kV oil reactors with government furnished air core reactors, replace six government furnished 230kV CCVTs on existing structures, replace four 115kV line switches at Windsor Tap and Hygiene Tap on existing structures.
Source: DOE acquisition forecastSee the contact and incumbent, free
Power Systems Sustainment
- Award expected
- Work starts Feb 2027
- Estimated value
- $250K to $499K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
IIJA JCN 1200399 Cable ELD Installation/Construction SAV ELD SAVANNAH GA Basic Ordering Agreement (BOA) /Qualified Vendors List (QVL) order
ADOT SR303 EXTENSION PROJECT (LIBERTY ¿ LONE BUTTE, LIBERTY ¿ PHOENIX 230-kV TRANSMISSION LINE)
- Award expected
- Current contract ends Mar 2027
- Estimated value
- $250K to $7.5M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Source: DOE acquisition forecastSee the contact and incumbent, free
Power Systems Sustainment
- Award expected
- Work starts Mar 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
IIJA JCN 18028509 ELD Installation/Construction at CMI ELD CHAMPAIGN IL Basic Ordering Agreement (BOA) /Qualified Vendors List (QVL) order
Power Systems Sustainment
- Award expected
- Work starts Mar 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
JCN 19007442 ELD Installation/Construction at TRI ELD TRI CITY TN Basic Ordering Agreement (BOA) /Qualified Vendors List (QVL) order
Power Systems Sustainment
- Award expected
- Work starts Mar 2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
REPLACE JCN 22005577 PIB MALSR Power and Control Cables in Hattiesburg, MS Basic Ordering Agreement (BOA) /Qualified Vendors List (QVL) order
Sand Creek Switching Station - The principal components of work include constructing a new 115-kV switching station consisting of three (3)…
- Award expected
- Current contract ends Apr 2027
- Estimated value
- $7.5M to $25M
- Set-aside
- Small business
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Sand Creek Switching Station - The principal components of work include constructing a new 115-kV switching station consisting of three (3) breaker ring bus on the Erie ¿ Hoyt ¿ Willoby transmission lines, associated electrical equipment, structures, foundations, prefabricated control building foundation, site development and 0.3-miles of 115-kV transmission line for approach spans into switching station; removing 0.3-miles of 115-kV transmission line; fiber optic installation including fiber o…
Source: DOE acquisition forecastSee the contact and incumbent, free
PHILIP NORTH SWITCHING STATION, STAGE 01, SOUTH DAKOTA
- Award expected
- Current contract ends Apr 2027
- Estimated value
- $7.5M to $25M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Source: DOE acquisition forecastSee the contact and incumbent, free
Replace Rescue 21 Tower Rota, United States Coast Guard Forces, Rota, Federated States of Micronesia Project #32700617
- Award expected
- May 15, 2027
- Solicitation expected
- Apr 15, 2027
- Estimated value
- $2M to $5M
- Set-aside
- 8(a)
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Source: DHS Acquisition Planning Forecast System (F2026075505)See the contact, free
Repair Rota West Harbor Range Rear Light Aids To Navigation, Rota, Federated States of Micronesia Project #9743463
- Award expected
- May 15, 2027
- Solicitation expected
- Apr 15, 2027
- Estimated value
- $350K to $500K
- Set-aside
- 8(a)
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Source: DHS Acquisition Planning Forecast System (F2026075506)See the contact, free
LUKA RTR Tower Replacement
- Award expected
- Work starts May 2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
REPLACE IIJA _ Replace Five (5) 47 Year_Old 120' LUKA RTR Self_Supporting Steel Towers and 59 Year_Old Masonry RTR BLDG at Cincinnati Municipal Lunken Airport (LUK) Cincinnati, OH
GRAND ISLAND SUBSTATION, STAGE 08 AND SIOUX FALLS SUBSTATION, STAGE 15, STATION SERIVE UPGRADES, NEBRASKA AND SOUTH DAKOTA
- Award expected
- Current contract ends May 2027
- Estimated value
- $250K to $7.5M
- Set-aside
- Small business
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Source: DOE acquisition forecastSee the contact and incumbent, free
Navigation, Lighting, and Landing
- Award expected
- Work starts Jun 2027
- Estimated value
- $5M to $9.9M
- Set-aside
- 8(a)
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
24980170 24_NM_006641 Portland, OR (PDX) – RWY 10L SA CAT I/II Approach Upgrade w/EO 24017010 LOC (VDG) and 24017012 GS (VDG)
JCN 2404848 Houstion Hobby FOTS
- Award expected
- Work starts Jul 2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Install Phase B of the Fiber loop construction at Houston Hobby Airport (Hurricane Harvey funding)
Rifle Substation Communications Tower to replace an old and failing federally owned Rifle Microwave (RFM) building
- Award expected
- Current contract ends Aug 2027
- Estimated value
- $25K to $250K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Rifle Substation Communications Tower to replace an old and failing federally owned Rifle Microwave (RFM) building. The RFM is to transfer traffic to the Rifle Substation. The RFM has a microwave radio connection to Sunlight Peak (SUN), however due to terrain obstructions it was not possible to take this connection directly to RFL. To avoid the cost of replacing the RFM building, a microwave tower would allow a microwave path between RFL and SUN to be established.
Source: DOE acquisition forecastSee the contact and incumbent, free
Power Systems Sustainment
- Award expected
- Work starts Aug 2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
(back to S status) JCN 22008339 Replace power cables on UNV MALSR Basic Ordering Agreement (BOA) /Qualified Vendors List (QVL) order
Power Systems Sustainment
- Award expected
- Work starts Aug 2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
REPLACE JCN 23000435 ELD Installation/Construction at STJ ELD ST. JOSEPH, MO Basic Ordering Agreement (BOA) /Qualified Vendors List (QVL) order
Alcova-Boysen Thermopolis-Worland Tap OPGW
- Award expected
- Current contract ends Sep 2027
- Estimated value
- $250K to $7.5M
- Set-aside
- No set-aside
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Source: DOE acquisition forecastSee the contact and incumbent, free
North Cody MOI 954 Switch Replacement - Western Area Power Administration (WAPA) Rocky Mountain Region has a requirement with the…
- Award expected
- Current contract ends Sep 2027
- Estimated value
- $250K to $7.5M
- Set-aside
- No set-aside
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
North Cody MOI 954 Switch Replacement - Western Area Power Administration (WAPA) Rocky Mountain Region has a requirement with the principlal components of work to include replacing one (1) 115-kV, 1200-amp motor-operated interrupter (also referred to as circuit switcher or MOI) with ground blades and pre-insertion inductor using the existing support structure.
Source: DOE acquisition forecastSee the contact and incumbent, free
Sidney Substation Breaker Replacement; SD566 SD662 SD862 BREAKER REPLACEMENTS: demolition and site development, foundations and platforms…
- Award expected
- Current contract ends Sep 2027
- Estimated value
- $250K to $7.5M
- Set-aside
- Small business
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Sidney Substation Breaker Replacement; SD566 SD662 SD862 BREAKER REPLACEMENTS: demolition and site development, foundations and platforms for substation electrical equipment, installation of three (3) Government-furnished power circuit breakers, installation of three (3) Government-furnished CCVTs and two (2) Government-furnished CCVT support pedestals, and furnishing and installing high voltage bus, grounding system, conduit, and insulated cables.
Source: DOE acquisition forecastSee the contact and incumbent, free
BERESFORD SUBSTATION, STAGE 11, SOUTH DAKOTA
- Award expected
- Current contract ends Sep 2027
- Estimated value
- $250K to $7.5M
- Set-aside
- Small business
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Source: DOE acquisition forecastSee the contact and incumbent, free
CT EACSS Fiber Backbone Upgrade
- Award expected
- FY2027
- Estimated value
- $2M to $4.9M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Upgrade EACSS Fiber Backbone. 36274 Upgrade EACSS Fiber Backbone. 36274
Elden Mountain Communications Site Renovation, Western Area Power Administration, Desert Southwest Region, Phoenix
- Award expected
- Current contract ends Oct 2027
- Estimated value
- $250K to $7.5M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Source: DOE acquisition forecastSee the contact and incumbent, free
Rebuild of the Liberty to Van Buren portion of Southwesterns Van Buren to Weleetka 161kV transmission line
- Award expected
- Current contract ends Oct 2027
- Estimated value
- $7.5M to $25M
- Set-aside
- Small business
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Source: DOE acquisition forecastSee the contact and incumbent, free
The construction of 59-miles of 230-kV double-circuit transmission line; construction of 5-miles of 230-kV single-circuit transmission…
- Award expected
- Current contract ends Nov 2027
- Estimated value
- $50M to $100M
- Set-aside
- Not decided yet
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
The construction of 59-miles of 230-kV double-circuit transmission line; construction of 5-miles of 230-kV single-circuit transmission line; removing 58-miles of single-circuit 115-kV transmission line; fiber optic installation including optical overhead ground wire (OPGW), fiber splicing and all associated fiber equipment.
Source: DOE acquisition forecastSee the contact and incumbent, free
Construction Indefinite Delivery Indefinite Quantity Contract for Steel Pole Foundations for the Upper Great Plains and Rocky Mountain…
- Award expected
- Current contract ends Aug 2028
- Estimated value
- $250K to $7.5M
- Set-aside
- Small business
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Construction Indefinite Delivery Indefinite Quantity Contract for Steel Pole Foundations for the Upper Great Plains and Rocky Mountain Regions of Western Area Power Administration. Period of Performance will be 36 continuous months from date of award with a ceiling max of $5.0M. The principal components of the work involve demolition of existing foundations, providing various types of concrete foundations, structure erection, conduits, grounding, and miscellaneous site work at multiple location…
Source: DOE acquisition forecastSee the contact and incumbent, free
Indefinite Delivery Indefinite Quantity (IDIQ) for Facility Maintenance and Repair at various locations in UGP and RMR. Construction…
- Award expected
- Current contract ends Aug 2028
- Estimated value
- $250K to $7.5M
- Set-aside
- Small business
- NAICS
- 237130 Power and Communication Line and Related Structures Construction
Description
Indefinite Delivery Indefinite Quantity (IDIQ) for Facility Maintenance and Repair at various locations in UGP and RMR. Construction Indefinite Delivery Indefinite Quantity contract for Facility Maintenance and Repairs for Upper Great Plains and Rocky Mountain Regions of Western Area Power Administration. Period of performance will be 36 continuous months from date of the award with a ceiling max of $5M. The work involves miscellaneous sitework, demolition, providing concrete foundations, oil c…
Source: DOE acquisition forecastSee the contact and incumbent, free
Agencies planning 237130 work
- Department of the Interior: 27 planned
- Department of Energy: 16 planned
- Department of Transportation: 14 planned
- Department of Homeland Security: 2 planned
Frequently asked questions
What is an agency procurement forecast?
A procurement (or acquisition) forecast is an agency's list of contracts it plans to buy in the coming months, published before the solicitation is posted on SAM.gov. Agencies publish them so small businesses can prepare. Each entry usually gives the work, the NAICS code, an estimated value range, the expected solicitation or award quarter and whether it may be set aside.
How should a small business use a forecast?
Pick the planned buys in your NAICS codes, then introduce your business to the agency's small business specialist or program office with a short email and your capability statement. Ask how they plan to buy it: set-aside, contract vehicle and timing. Then watch SAM.gov for a sources sought notice or draft solicitation, which often comes first. Contacting the agency early, while the requirement is still being planned, is when you can still influence a set-aside decision.
How accurate are forecast dates and values?
They are estimates. Dates shown as a quarter or fiscal year are the agency's own (the federal fiscal year starts October 1, so Q1 FY2027 is October to December 2026). Values are ranges. Buys slip, change set-aside or are dropped, and some are never posted. Treat a forecast as an early signal, not a promise.
Where does this forecast data come from?
From the agencies' own public forecast sites: GSA's Acquisition Gateway forecast tool (which carries the forecasts of many departments), the Department of Homeland Security's Acquisition Planning Forecast System, and the Department of Energy and NASA acquisition forecasts. FedReady checks them every day. Agencies that aren't listed publish their forecasts elsewhere; Acquisition.gov links to each one.
Keep going
- Open NAICS 237130 contracts, size standard and spending
- Check whether you're small under 237130
- Forecasts by agency
Forecast data from GSA Acquisition Gateway forecast tool, DOE acquisition forecast and DHS Acquisition Planning Forecast System, public U.S. government information, as of Oct 10, 2026. Forecasts are plans, not promises: dates, values and set-asides change. FedReady is an independent company, not affiliated with SAM.gov or any government agency.