Bear Butte Livestock Water Pipeline Replacement
- Award expected
- FY2027 Q3 (Apr–Jun 2027)
- Work starts
- Mar 31, 2027
- Estimated value
- $500K to $999K
- Set-aside
- Not decided yet
- Place of performance
- South Dakota
- NAICS
- 237110 Water and Sewer Line and Related Structures Construction
Description of Bear Butte Livestock Water Pipeline Replacement
The Bear Butte livestock water system in the Bear Butte Allotment, Fort Meade, South Dakota, will replace approximately 27,800 feet of failing PVC pipeline with new 1.5- to 2-inch HDPE pipe installed in existing disturbed corridors at depths of 5 to 6 feet. Twelve fiberglass stock water tanks (minimum 1,000 gallons each) will replace existing tanks and include wildlife escape ramps, calf barriers, floats, and overflow pipes. Existing tanks and hydrants will be removed. Environmental and cultura…
Source: GSA Acquisition Gateway forecast tool for Bear Butte Livestock Water Pipeline ReplacementDOI's small business office for Bear Butte Livestock Water Pipeline ReplacementSearch SAM.gov notices for this requirement for Bear Butte Livestock Water Pipeline Replacement