Upcoming federal contracts: NAICS 221122, Electric Power Distribution

Planned electric power distribution contracts from agencies' published procurement forecasts. They come out months before a solicitation is posted on SAM.gov, so there's time to introduce your business and ask how the agency plans to buy the work.

Planned buys listed
12
Award expected within 6 months
5
Set aside for small business
2
Updated
Oct 10, 2026

Planned NAICS 221122 contracts, soonest award first

12 listed

  • Electric Utilities for Western Area Power Administration Headquarters Office.

    Department of Energy · Western Area Power Administration · Colorado

    Award expected
    Current contract ends Dec 2026
    Estimated value
    $25K to $250K
    Set-aside
    No set-aside
    NAICS
    221122 Electric Power Distribution
  • Contract Line Crew for CR-ES, SCIP Pwr, and Truxton

    Department of the Interior · Bureau of Indian Affairs · Arizona

    Award expected
    Work starts Dec 2026
    Estimated value
    $5M to $9.9M
    Set-aside
    Indian economic enterprise
    NAICS
    221122 Electric Power Distribution
    Description

    The objective of this contract is to provide an experienced high-voltage electrical system line crew that will maintain, repair, modify, and construct the overhead and underground electrical systems. Provide emergency outage repair. The estimated percentages of work performed at SCIP-PD is 70% and the remainder 30% at CR-ES. Within, the estimated percentages of work involved will be 60% troubleshooting and repair, 20% maintenance, 15% construction, and 5% emergency response.

  • NAMA - 17993 - Electrical Meter Line Tracing

    Department of the Interior · National Park Service · District of Columbia

    Award expected
    FY2027
    Estimated value
    $500K to $999K
    Set-aside
    Not decided yet
    NAICS
    221122 Electric Power Distribution
    Description

    This is to identify all electrical meters in the park and trace out what they feed.

  • SEKI - 14893 - Underground Lodgepole Visitor Center and Campground Overhead Electric Lines

    Department of the Interior · National Park Service · California

    Award expected
    FY2027
    Estimated value
    $2M to $4.9M
    Set-aside
    Not decided yet
    NAICS
    221122 Electric Power Distribution
    Description

    Underground Lodgepole Visitor Center and Campground Overhead Electric Lines

  • YOSE - 14059 - Install Electric Vehicle Supply Equipment in Wawona for Mariposa Grove Autonomous Buses

    Department of the Interior · National Park Service · California

    Award expected
    FY2027
    Estimated value
    $1M to $1.9M
    Set-aside
    Not decided yet
    NAICS
    221122 Electric Power Distribution
    Description

    Mariposa Grove of Giant Sequoias in Yosemite will serve as one site of a pilot program in 2027 to provide bus service using autonomous vehicles. They are battery electric buses and will require charging infrastructure in the Wawona area.

  • SSA FOP BSA Panel Replacement

    Department of the Interior · Bureau of Reclamation · California

    Award expected
    FY2027
    Estimated value
    Under $150K
    Set-aside
    Not decided yet
    NAICS
    221122 Electric Power Distribution
    Description

    FOP BSA Panel Replacement. 36370 FOP BSA Panel Replacement. 36370

  • SSA NBP Mercoid Replacement

    Department of the Interior · Bureau of Reclamation · California

    Award expected
    FY2027
    Estimated value
    Under $150K
    Set-aside
    Not decided yet
    NAICS
    221122 Electric Power Distribution
    Description

    NBP Mercoid Replacement. 36372 NBP Mercoid Replacement. 36372

  • SSA FOP Unit Brake Replacement

    Department of the Interior · Bureau of Reclamation · California

    Award expected
    FY2027
    Estimated value
    Under $150K
    Set-aside
    Not decided yet
    NAICS
    221122 Electric Power Distribution
    Description

    FOP Unit Brake Replacement. 36374 FOP Unit Brake Replacement. 36374

  • SSA FOP Unit Magnetrol Replacement

    Department of the Interior · Bureau of Reclamation · California

    Award expected
    FY2027
    Estimated value
    Under $150K
    Set-aside
    Not decided yet
    NAICS
    221122 Electric Power Distribution
    Description

    FOP Unit Magnetrol Replacement. 36375 FOP Unit Magnetrol Replacement. 36375

  • SSA FOP Unit Oil Replacement

    Department of the Interior · Bureau of Reclamation · California

    Award expected
    FY2027
    Estimated value
    Under $150K
    Set-aside
    Not decided yet
    NAICS
    221122 Electric Power Distribution
    Description

    FOP Unit Oil Replacement. 36376 FOP Unit Oil Replacement. 36376

  • FOP Kingsbury Bearing Repair

    Department of the Interior · Bureau of Reclamation · California

    Award expected
    FY2027
    Estimated value
    $150K to $249K
    Set-aside
    Not decided yet
    NAICS
    221122 Electric Power Distribution
    Description

    FOP Kingsbury Bearing Repair. 36380 FOP Kingsbury Bearing Repair. 36380

  • AERIAL INSPECTION SERVICES FOR JONESBORO MANITENANCE UNIT

    Department of Energy · Southwestern Power Administration · Oklahoma

    Award expected
    Current contract ends Aug 2028
    Estimated value
    $250K to $7.5M
    Set-aside
    Small business
    NAICS
    221122 Electric Power Distribution

Agencies planning 221122 work

Frequently asked questions

What is an agency procurement forecast?

A procurement (or acquisition) forecast is an agency's list of contracts it plans to buy in the coming months, published before the solicitation is posted on SAM.gov. Agencies publish them so small businesses can prepare. Each entry usually gives the work, the NAICS code, an estimated value range, the expected solicitation or award quarter and whether it may be set aside.

How should a small business use a forecast?

Pick the planned buys in your NAICS codes, then introduce your business to the agency's small business specialist or program office with a short email and your capability statement. Ask how they plan to buy it: set-aside, contract vehicle and timing. Then watch SAM.gov for a sources sought notice or draft solicitation, which often comes first. Contacting the agency early, while the requirement is still being planned, is when you can still influence a set-aside decision.

How accurate are forecast dates and values?

They are estimates. Dates shown as a quarter or fiscal year are the agency's own (the federal fiscal year starts October 1, so Q1 FY2027 is October to December 2026). Values are ranges. Buys slip, change set-aside or are dropped, and some are never posted. Treat a forecast as an early signal, not a promise.

Where does this forecast data come from?

From the agencies' own public forecast sites: GSA's Acquisition Gateway forecast tool (which carries the forecasts of many departments), the Department of Homeland Security's Acquisition Planning Forecast System, and the Department of Energy and NASA acquisition forecasts. FedReady checks them every day. Agencies that aren't listed publish their forecasts elsewhere; Acquisition.gov links to each one.

Keep going

Forecast data from DOE acquisition forecast and GSA Acquisition Gateway forecast tool, public U.S. government information, as of Oct 10, 2026. Forecasts are plans, not promises: dates, values and set-asides change. FedReady is an independent company, not affiliated with SAM.gov or any government agency.