Combined Synopsis/Solicitation
Blanket Purchase Agreement (BPA) for CNC Machine Repair, Parts, Programming, and Training Services Blue Grass Army Depot (BGAD)
Department of Defense · Department of the Army
Small business set-aside · KY
A newer version of this notice was posted Nov 23, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 19, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 1 of 5 attachments weren't read (CNC_Machine_Repair_Solicitation_Pricing_Schedule w options.xlsx). Check the attachments on SAM.gov.
Solicitation W519TC27T3011: the Army's Blue Grass Army Depot (Army Contracting Command - Rock Island) wants one small business for a single-award blanket purchase agreement (BPA: a standing "charge account" for repeat orders) for repair, parts, programming and training on its computer-controlled (CNC) machines, FANUC robots and programmable logic controllers (PLCs, industrial control computers) in Richmond, Kentucky. Only small businesses can bid. The response due date is December 3, 2026, 1:00 PM Eastern. The BPA runs five ordering periods starting December 7, 2026, with a $750,000 master limit.
Who can bid (4)
- Small business under NAICS 811310 (size standard $12.5 million), total small business set-aside From COMBINED SOLICTATION AND SYNOPISIS- DETAILED.docx
- Active, validated SAM.gov registration at the time of quote submission under NAICS 811310 From COMBINED SOLICTATION AND SYNOPISIS- DETAILED.docx
- Technicians with OEM or equivalent training and certifications on HAAS, Doosan, FANUC and PLC systems From COMBINED SOLICTATION AND SYNOPISIS- DETAILED.docx
Show all 4Show fewer
- Relevant past performance: 1 to 3 contracts completed within the past three years From COMBINED SOLICTATION AND SYNOPISIS- DETAILED.docx
How to submit: Email to Jeremy.S.Turner10.civ@army.mil with "RFQ W519TC27T3011 – Quote Submission" in the subject line. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
- Serious: Total small business set-aside. Only small businesses within the $12.5 million size standard for NAICS 811310 can bid.
- Serious: Technician certifications on several brands are needed to pass. Technical acceptability is pass/fail, and it requires OEM-aligned training covering HAAS, Doosan, FANUC and PLC platforms. From COMBINED SOLICTATION AND SYNOPISIS- DETAILED.docx
- Serious: On-site arrival within 24 hours for emergency repairs. A business far from Richmond, Kentucky needs a plan that can reach the depot within 24 hours of a call order. From COMBINED SOLICTATION AND SYNOPISIS- DETAILED.docx
Show all 8Show fewer
- Worth checking: Pricing workbook attached but not read. The Excel pricing schedule sets the required rates and the sample basket quantities and was not read here, so its details may be missing from this brief. From COMBINED SOLICTATION AND SYNOPISIS- DETAILED.docx
- Worth checking: Active ammunition depot with access and escort rules. Technicians need a background check to enter, are escorted in restricted areas, and accept ordnance exposure risk; cameras are banned without written approval. From Performance Work Statement.pdf
- Worth checking: No guaranteed work. The BPA does not obligate funds and the Government may cancel it on 30 days' written notice without cost.
- Minor: Work hours are Monday through Thursday. Normal on-site hours are 0600 to 1630 Eastern, Monday through Thursday; other hours need advance approval from the Contracting Officer's Representative (COR, the Government's technical contact). From COMBINED SOLICTATION AND SYNOPISIS- DETAILED.docx
- Minor: Question deadline: November 30, 2026, 1:00 PM Eastern. Questions go by email to the Contracting Specialist only. From COMBINED SOLICTATION AND SYNOPISIS- DETAILED.docx
Read from the notice and 4 attachments. 1 of 5 not read. Show which files.
- OPSEC AND WAWF Site Specific Instructions.docx (read)
- Performance Work Statement.pdf (read)
- COMBINED SOLICTATION AND SYNOPISIS- DETAILED.docx (read)
- Wage Determination.pdf (read)
- CNC_Machine_Repair_Solicitation_Pricing_Schedule w options.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
Full summary
What they want
- Diagnose and repair HAAS Mini Mill, HAAS VF6, HAAS SL10 and Doosan Puma 2600SY CNC machines
- Repair FANUC robots (M-20iA, R-2000iB) and FANUC controllers (M-20iA, R-30iA)
- Service Allen-Bradley, Mitsubishi and Siemens PLCs
- Supply new OEM (original equipment manufacturer) or equivalent replacement parts, with supplier invoices as proof of cost
- Write and back up CNC and PLC ladder logic programs and hand over fully documented copies
- Train depot operators and programmers
- Arrive on site within 24 hours for emergency repairs and within 3 business days for routine repairs, and leave a signed field service report after every visit
- Contract type
- Single-award blanket purchase agreement (BPA) with firm-fixed-price call orders (individual orders placed under the BPA)
- Period of performance
- Five ordering periods of 12 months each: December 7, 2026 to December 6, 2027, through December 7, 2030 to December 6, 2031
- Place of performance
- Blue Grass Army Depot, 431 Battlefield Memorial Highway, Richmond, KY 40475-5001
- Remote work
- Partial. From Performance Work Statement.pdf:
Off-site programming or remote technical support may be authorized only when explicitly stated in a Call Order.
- Estimated value
- BPA master limit $750,000; no single call order above $250,000
- Contract vehicle
- Single-award BPA for a small business under RFO 12.201-1(e)(3) and Class Deviation RFO-2025-16
- How they'll choose
- Lowest price technically acceptable (LPTA: the lowest-priced quote that passes the pass/fail technical review wins)
- Offers due
- December 3, 2026, 1:00 PM Eastern (from the version posted Nov 19, 2026; amended since)
- How to submit
- Email to Jeremy.S.Turner10.civ@army.mil with "RFQ W519TC27T3011 – Quote Submission" in the subject line
- Page limits
- Volume I Technical: 15 pages maximum, PDF
What they'll judge offers on
- Technical Acceptability (pass/fail): (1.1) technician qualifications and OEM-aligned certifications, (1.2) response time feasibility for 24-hour emergency arrival, (1.3) past performance, with a neutral rating if none
- Price: total evaluated price from a sample basket of travel trips, labor hours and parts in the pricing workbook, checked for fairness, reasonableness and balance
What to include when you submit
- Send two separate electronic volumes: Volume I Technical Acceptability and Capability Narrative (PDF), Volume II completed pricing schedule
- Volume I: proof that proposed technicians hold OEM or equivalent training or certifications covering HAAS, Doosan/DN Solutions, FANUC and industrial PLC platforms (Allen-Bradley, Siemens)
- Volume I: a rapid response deployment plan showing 24-hour on-site arrival for emergencies and 3 business days for routine repairs
- Volume I: at least 1 and at most 3 relevant commercial or federal contracts completed within the past three years on comparable industrial equipment
- Volume II: fill in only the yellow cells on each ordering period tab of the Government's Excel workbook: travel unit cost, hourly labor rate and parts markup percentage (cell D17)
- Do not change the workbook's formulas or structure; altered, incomplete or unbalanced submissions may be rejected
- Questions by email to the Contracting Specialist, due November 30, 2026, 1:00 PM Eastern
After award, you must have
- Registration in Wide Area Workflow (WAWF, the Army's electronic invoicing system) From COMBINED SOLICTATION AND SYNOPISIS- DETAILED.docx:
Vendors must be registered in WAWF.
- Technicians must have a Real ID compliant credential and pass a local records check at the depot Visitor Center before getting a pass From COMBINED SOLICTATION AND SYNOPISIS- DETAILED.docx:
Technicians must hold a valid REAL ID-compliant credential and pass a local records/background check at the BGAD Visitor Center prior to pass issuance.
Current contractor
No incumbent is named. The notice calls this an ongoing requirement.
Not in the notice text
- The pricing workbook (CNC_Machine_Repair_Solicitation_Pricing_Schedule w options.xlsx) is attached but not read; the sample basket quantities and exact rate inputs are in it
- The Government's independent cost estimate is not stated
- Whether a site visit is offered: the documents do not mention one
More to check before you bid
- Service contracts usually set minimum pay rates (the Service Contract Act). Price the labor with the SCA price calculator.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- W6QK ACC-Ri, Rock Island, IL
- Product/service code
- J034 · Maint/Repair/Rebuild of Equipment – Metalworking Machinery
- Business type
- Equipment repair & maintenance (FedReady's grouping, from NAICS 811310)
- Versions
3 versions have been posted, newest first.
- Nov 23, 2026 · Amendment 0002Due Dec 3, 2026
- Nov 23, 2026 · Amendment 0001Due Dec 3, 2026
- Nov 19, 2026 · Combined Synopsis/Solicitation (this version)Due Dec 3, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- US Army Hawaii Dining Facilities’ Large Equipment Preventative Maintenance & Repair ServicesThe Army's Regional Contracting Office Hawaii (Department of the Army, 0413 AQ HQ RCO-HI) wants a small business to keep large kitchen equipment running at Army dining facilities…
- Commercial Washer and Dryer Machine Preventive Maintenance and Services for One (1) Base year plus Four (4) Option year periodsTotal small business set-aside: only small businesses can bid on solicitation 124PSA27Q0038.
- Ice Machine Disinfection Maintenance Agreement with 4 (1-year option periods)Only service-disabled veteran-owned small businesses (SDVOSBs) can bid.