Solicitation
USCG Station Cape Charles Sewage Lift Station Repairs
Department of Homeland Security · U.S. Coast Guard
Small business set-aside · Cape Charles, VA
AI summary Beta
This summary may miss requirements: 2 of 11 attachments weren't read (Lift Station Drawings.pdf, Wage Determination NorthHampton County.pdf). Check the attachments on SAM.gov.
Solicitation 70ZL1927QELIZ0002: the U.S. Coast Guard (Base Elizabeth City) wants a small business to repair the sewage lift station at Station Cape Charles, Virginia, for one lump-sum firm-fixed-price (one set price, whatever the work costs). It is a total small business set-aside, and a pre-quote site visit is called mandatory. Quotes are due at noon Eastern Time on December 2, 2026 (the response due date, per Amendment 0001).
Who can bid (7)
- Total small business set-aside: only small businesses can bid, and offers from other firms are rejected as nonresponsive From Clauses and Provisions STA Cape Charles Sewage Lift Station Repairs.pdf
- Bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less, if SF 1442 block 13b requires one. The form's checkboxes could not be read, and the Government's answers did not settle it From Clauses and Provisions STA Cape Charles Sewage Lift Station Repairs.pdf
- Mandatory examination of the statement of work and visit to the facility before submitting a quote From SOW - STA Cape Charles Sewage Lift Station.pdf
Show all 7Show fewer
- A minimum of 10 years of experience removing and installing similar systems, with proof of similar projects sent with the quote From SOW - STA Cape Charles Sewage Lift Station.pdf
- Qualified and licensed personnel to do all the tasks From SOW - STA Cape Charles Sewage Lift Station.pdf
- Workers' compensation, general liability and automobile liability insurance kept up during the work, at the minimums in FAR 28.307-2 From Clauses and Provisions STA Cape Charles Sewage Lift Station Repairs.pdf
- Active SAM registration when quoting From Clauses and Provisions STA Cape Charles Sewage Lift Station Repairs.pdf
Things to watch (12)
From the version posted Nov 19, 2026.
- Serious: Total small business set-aside. Only small businesses can bid; quotes from other firms are rejected. From Clauses and Provisions STA Cape Charles Sewage Lift Station Repairs.pdf
- Serious: Site visit before quoting called mandatory. The statement of work says a facility visit is mandatory before you quote, but the documents read give no visit date or way to arrange one. Ask the contracting office. From SOW - STA Cape Charles Sewage Lift Station.pdf
- Serious: Bid guarantee may be required. The bid guarantee provision (20 percent of the bid price or $3,000,000, whichever is less) is in the solicitation, but SF 1442 block 13b could not be read. Two questions about it got no direct answer. From Clauses and Provisions STA Cape Charles Sewage Lift Station Repairs.pdf
Show all 12Show fewer
- Serious: Performance and payment bonds at 100 percent. A surety must back both bonds at the full contract price before work starts, which many small firms need time to arrange. From Clauses and Provisions STA Cape Charles Sewage Lift Station Repairs.pdf
- Worth checking: NAICS code differs between SAM.gov and SF 1442. SAM.gov lists NAICS 488330 (Navigational Services to Shipping), while SF 1442 lists NAICS 237110 (water and sewer line construction). The size standard depends on which governs; ask the contracting officer. From SF-1442 70ZL1927QELIZ0002.pdf
- Worth checking: Who supplies the pumps is unclear. The statement of work tells the contractor to provide and install two pumps, while the Q&A says Government-furnished pumps are on site. The data sheet shows single-phase pumps, while the new panel is 3 phase 208 VAC. From RFQ 70ZL1927QELIZ0002 Q and A.pdf
- Worth checking: Davis-Bacon wage rules apply. The solicitation includes the construction wage rate clause, so covered workers must be paid the Davis-Bacon wage determination. The wage determination file is a scan that could not be read. From Clauses and Provisions STA Cape Charles Sewage Lift Station Repairs.pdf
- Worth checking: Proof of 10 years of similar work required with the quote. The statement of work asks for 10 years of experience installing similar systems, with proof of similar projects, which a newer firm may not have. From SOW - STA Cape Charles Sewage Lift Station.pdf
- Minor: SAM.gov lists no time for the response due date. SAM.gov gives December 2, 2026 with no time; the Q&A answer in Amendment 0001 says noon Eastern Time. From RFQ 70ZL1927QELIZ0002 Q and A.pdf
- Minor: Reference drawings are poor scans. The Government says some drawings are poor scans and the originals cannot be found. The drawing file could not be read here. From RFQ 70ZL1927QELIZ0002 Q and A.pdf
- Minor: Performance period stated two ways. The statement of work allows 120 calendar days from the Notice to Proceed, while SF 1442 lists December 14, 2026 to April 30, 2027. From SOW - STA Cape Charles Sewage Lift Station.pdf
- Minor: Photo ID needed to enter the station. Visitors must show a valid Real ID or passport. Secret-clearance-eligible staff are preferred, but no clearance is needed at award. From RFQ 70ZL1927QELIZ0002 Q and A.pdf
Read from the notice and 9 attachments. 2 of 11 not read. Show which files.
- RFQ 70ZL1927QELIZ0002 Q and A.pdf (read)
- SF-30 70ZL1927QELIZ0002 Amendment 0001.pdf (read)
- SF-1442 70ZL1927QELIZ0002.pdf (read)
- SOW - STA Cape Charles Sewage Lift Station.pdf (read)
- GFE Data Sheet.pdf (read)
- Clauses and Provisions STA Cape Charles Sewage Lift Station Repairs.pdf (read)
- SF24-23a.pdf (read)
- SF25-23b.pdf (read)
- SF25A-23a.pdf (read)
- Lift Station Drawings.pdf: not summarized: open it on SAM.gov
- Wage Determination NorthHampton County.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Set up and run a temporary sewage bypass pumping system for the whole project, with a bypass plan approved by the Contracting Officer's Representative (COR) before any work starts
- Remove the old pumps, controls, sensors, alarms and piping, clear the sludge and prepare the concrete manhole
- Install new 3 phase 208 VAC wiring, a NEMA 4X duplex pump control panel, an intrinsic safety barrier and an alarm system
- Line and restore the manhole, and install two (2) submersible grinder pumps, new piping, a vent with an odor filter and a level control system
- Test the whole system for the COR and give at least four (4) hours of training to Coast Guard staff
- Deliver As-Built drawings, two (2) sets of Operation and Maintenance (O&M) manuals and product data sheets at completion
- Finish within 120 calendar days after the Notice to Proceed (NTP), working 0800 to 1600, Monday through Friday
- Contract type
- Firm-fixed-price, 1 LS (lump sum) for one line item (0001)
- Period of performance
- Statement of work: no more than 120 calendar days after the Notice to Proceed. SF 1442 lists a start date of 12/14/26 and an end date of 4/30/27
- Place of performance
- USCG Station Cape Charles, 1 Marina Road, Cape Charles, VA 23310
- Estimated value
- Not stated
- How they'll choose
- Lowest price technically acceptable: the lowest-priced quote is checked first, and if it is not acceptable the next lowest is checked
- Offers due
- December 2, 2026, 12:00 PM (noon) Eastern Time
- Page limits
- Technical approach: no more than 5 pages
What they'll judge offers on
- Technical Capability: a technical approach, no more than five pages, showing you can complete all the statement of work requirements
- Price: the lump-sum price for the work
What to include when you submit
- Send a signed and dated quote with the solicitation number, your name, address and phone number, and your Unique Entity ID (UEI)
- Include a technical approach of no more than five pages showing you can complete all the statement of work requirements
- Include your price for line 0001 (1 LS) and a statement of how far you agree with all terms, conditions and provisions and any amendments
- Complete the representations the solicitation asks for, including the HSAR 3052-209-70 corporate expatriates check-one disclosure and the FAR 52.240-90 security representations
- Acknowledge Amendment 0001 before the response due date, by completing items 8 and 15 of the SF 30, on the quote, or by separate letter or email
- Provide proof of similar projects showing 10 years of experience removing and installing similar systems, with the quote
- Send a bid guarantee (SF 24 bid bond form attached) if SF 1442 block 13b requires one; the form's checkboxes could not be read, so check the form on SAM.gov
- Hold your price for the acceptance period; FAR 52.212-1 says 60 calendar days unless the SF 1442 sets another
After award, you must have
- Performance bond and payment bond, each 100 percent of the contract price, unless the price is at or below the FAR 28.102-1(a) threshold (the threshold amount is not given); due before work starts From Clauses and Provisions STA Cape Charles Sewage Lift Station Repairs.pdf:
…award shall be 100 percent of the original contract price.
- Invoices go through the Invoice Processing Platform (IPP), the Treasury's free online invoicing system; registration follows from your SAM.gov contact From Clauses and Provisions STA Cape Charles Sewage Lift Station Repairs.pdf:
…proper invoices will be submitted through the Invoice Processing…
Current contractor
No incumbent: the Government says this is a stand-alone construction project. No contract was awarded from the earlier RFQ 70Z027Q260000080.
Not in the notice text
- Wage Determination NorthHampton County.pdf and Lift Station Drawings.pdf are attached but not read, because they are scanned files with no text. Check them on SAM.gov.
- Where and how to send the quote (email or portal) is not stated in the text read.
- Whether a bid guarantee is required: SF 1442 block 13b could not be read.
- How to arrange the mandatory site visit, and any date for it, is not given.
- The dollar amounts for the three insurance types and the bond threshold in FAR 28.102-1(a) are not stated.
- The Government's estimate for this work is not given.
- Whether the Government-furnished pumps are to be installed by the contractor is not clear.
- Whether the work may be done remotely is not stated.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Solicitation
- Office
- Base Elizabeth City, NC
- Product/service code
- R · Support SVCS (Prof, Admin, MGMT)
- Business type
- Transportation, logistics & vehicles (FedReady's grouping, from NAICS 488330)
- Versions
2 versions have been posted, newest first.
- Nov 19, 2026 · Amendment 0001 (this version)Due Dec 2, 2026
- Nov 4, 2026 · SolicitationDue Dec 2, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Latest amendment note (Amendment 1) from SAM.gov
Similar open opportunities
- Request for Information and Industry Day: MMSC PM CrewThe Navy (NAVSEA) is sharing plans for a future contract, to be issued by PAE Maritime, to operate and maintain four Multi-Mission Surface Combatants (MMSCs, naval ships) for 14…
- Eight (8) US Flag Time Charter Tugs, Norfolk, VA and Surrounding Waters
- NDSTC Craft OperationsOnly small businesses can bid on solicitation N6883627R0001 from the Navy (NAVSUP FLC Jacksonville ERP) for Craft Operations and Maintenance Services at the Naval Diving and…
- SWFLANT Support, Near Port Security Barrier Operations and Waterfront Restricted Area Gate Openings and Closings, Naval Submarine Base Kings Bay, GeorgiaStrategic Weapons Facility Atlantic (SWFLANT) wants a contractor to furnish vessels, crews and equipment for marine operations at Naval Submarine Base Kings Bay, Georgia,…
- Harbor Pilot Support Services on and around OkinawaThe Navy's Fleet Logistics Center Yokosuka wants a business that holds Japanese pilot licenses to guide U.S. Navy and Military Sealift Command ships in Kin-Nakagusuku Bay and…