Combined Synopsis/Solicitation
Ammonia System Maintenance, Coeur d'Alene Nursery, Idaho Panhandle National Forests
Department of Agriculture · Forest Service
Small business set-aside · Coeur D Alene, ID
A newer version of this notice was posted Nov 23, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 19, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov.
Total small business set-aside combined synopsis/solicitation 1284LL27Q0007 from the USDA Forest Service (USDA-FS CSA INTERMOUNTAIN 1) for ammonia refrigeration system maintenance at the Coeur d'Alene Nursery, Idaho. The firm must be within 100 miles of the nursery. It is one base year from March 2, 2027 to March 1, 2028, plus four option years.
Who can bid (5)
- Small business. This is a total small business set-aside, so only small businesses can bid.
- Contractor or its subcontractor must be physically located within 100 miles of the nursery and confirm the distance From 1284LL27Q0007.pdf
- Key personnel with experience in Logix software, ammonia-grade cooling systems, cold-storage refrigeration and anhydrous ammonia certification, listed on the Key Personnel Form From 1284LL27Q0007.pdf
Show all 5Show fewer
- Active registration in the System for Award Management (SAM.gov, the federal contractor registry) From 1284LL27Q0007.pdf
- Relevant past performance on similar work within the last three years is evaluated; a firm with none is rated Neutral From 1284LL27Q0007.pdf
How to submit: Email the quote to julia.cohrs@usda.gov and sarah.ackerman@usda.gov; the contractor must check that it was received. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
- Serious: Contractor or subcontractor must be within 100 miles of the nursery. A business farther away is rated Unacceptable on location, so it needs a nearby partner or office near Coeur d'Alene. From 1284LL27Q0007.pdf
- Worth checking: Contract end date differs between documents. The SF 1449 cover shows a period ending March 1, 2031, while the schedule lists a fourth option year through March 1, 2032. From 1284LL27Q0007.pdf
- Worth checking: Key personnel need specialized experience. Staff need Logix software, ammonia cooling and anhydrous ammonia certification experience, or the quote must justify why not. From 1284LL27Q0007.pdf
Show all 8Show fewer
- Worth checking: Must price every line, but the Government may award only some. A quote missing any line is not responsive, yet the Government may award all, some or no lines. From 1284LL27Q0007.pdf
- Minor: No work from November 1 to December 31 each year. All visits must fit outside that period, and the schedule must be agreed within 15 days of award. From 1284LL27Q0007.pdf
- Minor: Service Contract Act wage rates apply. A wage determination for Kootenai County, Idaho is attached, so wages and fringe benefits must meet it when pricing. From 1284LL27Q0007.pdf
- Minor: Reports mention monthly visits, but the schedule has none. The work statement asks for a checklist after each monthly visit, while the schedule lists only quarterly, semiannual and annual work. From 1284LL27Q0007.pdf
- Minor: Key Personnel Form mentions planting and dipping. The form's wording refers to other work, so ask the contracting officer how to fill it in for this maintenance job. From Key Personnel Form.pdf
Read from the notice and 2 attachments. Show which files.
- 1284LL27Q0007.pdf (read)
- Key Personnel Form.pdf (read)
Full summary
What they want
- Quarterly (QTY 4 EA), semiannual (QTY 2 EA) and annual (QTY 1 EA) inspection, testing and maintenance of one ammonia/glycol refrigeration system each year
- Service the listed equipment: 2 compressors, 1 condenser, 20 evaporators, 3 vessels, 2 heat exchangers, 3 glycol pumps, tanks, piping, ammonia detection and safety controls
- Do inspections per IIAR-6 (an industry standard for ammonia refrigeration systems) and the manufacturer's advice, including an annual IIAR-6 inspection with a findings and deficiencies report
- Supply all parts and materials for the work, including calibration gas, glycol analysis, and yearly vibration and oil analysis
- Keep oil, refrigerant and grease logs, and send a detailed service report and equipment checklist after each visit
- Work Monday to Friday, 7:00 AM to 4:00 PM Pacific time, outside the November 1 to December 31 blackout each year
- Emergency repairs may be ordered at a price negotiated at the time
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing) purchase order with option years. Request for quotation (RFQ).
- Period of performance
- Base year March 2, 2027 to March 1, 2028, plus four option years. The schedule's last option year ends March 1, 2032; the SF 1449 (Standard Form 1449) cover shows March 1, 2031.
- Place of performance
- Coeur d'Alene Nursery, 3600 W. Nursery Road, Coeur d'Alene, Idaho 83815
- Estimated value
- Not stated
- How they'll choose
- Best value to the Government, with price and other factors considered; formal tradeoff procedures will not be conducted
- Offers due
- December 9, 2026, 1:30 PM Mountain (from the version posted Nov 19, 2026; amended since)
- How to submit
- Email the quote to julia.cohrs@usda.gov and sarah.ackerman@usda.gov; the contractor must check that it was received
What they'll judge offers on
- Documents submitted with the quote (rated Acceptable or Unacceptable)
- Contractor and or subcontractor location: Exceptional within 49 miles, Acceptable 50 to 99 miles, Unacceptable if not within 100 miles or the office location is not given
- Ability to meet the performance period (rated Acceptable or Unacceptable), based on the confirmation statement
- Relevant past performance: similar work in size, complexity and scope within the last three years (Acceptable, Neutral or Unacceptable)
- Price: fair and reasonable, with all option prices added to the base price
What to include when you submit
- Fill out and sign the SF 1449 and price every line in the schedule of items (a unit price and total for each contract line item number, CLIN: one priced line of the order)
- Price all items: to be considered responsive, a quote must price every line
- Send a list of key personnel with qualifications on the attached Key Personnel Form, confirming experience with Logix software installation and programming, ammonia-grade cooling systems, cold-storage refrigeration and anhydrous ammonia certification; justify any person who does not meet all of these
- Give the contractor's and any subcontractor's physical location and distance to the nursery
- Send a statement confirming the ability to finish all quoted items in the performance period: capacity, any limits, assurance that all work can be completed, and the date work can begin
- Send relevant past performance with the award number, contracting officer's name, contracting officer's representative's name, period of performance and award type
- Send questions by email to Julia Cohrs and Sarah Ackerman at the same addresses
Not in the notice text
- The deadline for questions is not stated; the documents say only to send them to the two contracting email addresses.
- The SAM.gov fields and SF 1449 give a total of four years (to March 1, 2031), while the schedule shows five (to March 1, 2032); which governs is not stated.
- The Government's estimate or contract value is not given; the $12.5 million figure is the size standard, not the contract value.
- How many technicians the key personnel form expects beyond the contractor representative, supervisor and quality control inspectors is not stated.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- USDA-FS, CSA Intermountain 1, Ogden, UT
- Product/service code
- J041 · Maint/Repair/Rebuild of Equipment – Refrigeration, Air Conditioning, and Air Circulating Equipment
- Business type
- Equipment repair & maintenance (FedReady's grouping, from NAICS 811310)
- Versions
2 versions have been posted, newest first.
- Nov 23, 2026 · Amendment 0001Due Dec 9, 2026
- Nov 19, 2026 · Combined Synopsis/Solicitation (this version)Due Dec 9, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside