Combined Synopsis/Solicitation
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Department of Defense · Department of the Air Force
WOSB set-aside · Luke Air Force Base, AZ
A newer version of this notice was posted Nov 19, 2026. It moves the due date from Nov 9, 2026 to Dec 7, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Oct 8, 2026. The notice was amended Nov 19, 2026. The due date moved from Nov 9, 2026 to Dec 7, 2026. Check what else changed on SAM.gov. The notice looks incomplete: How to submit the quote (email, portal or other) is not stated in the text provided. Check the attachments on SAM.gov.
The Air Force's 56th Contracting Squadron at Luke AFB, Arizona wants a contractor to design, supply, install and test new fiber optic cable linking the radar approach control building to the control tower, base operations, command post and airfield navigation and weather sites. It is a single fixed-price lot set aside for women-owned small businesses, with delivery requested by 1 July 2027. Quotes are due 9 November 2026 and the award goes to the lowest-priced quote that is technically acceptable.
Who can bid (9)
- Must be a women-owned small business under the WOSB Program (100% set-aside); the solicitation form marks the WOSB box
- Must be small under the NAICS 335921 size standard (1,000 employees)
- Limitations on subcontracting apply: you cannot pay more than 50 percent of the contract amount (excluding materials on a supply contract) to firms that are not similarly situated small businesses From Solicitation - FA488727Q0003.pdf
Show all 9Show fewer
- The Nonmanufacturer Rule clause is included, which can matter if you resell cable made by someone else From Solicitation - FA488727Q0003.pdf
- Active SAM registration and registration in Wide Area WorkFlow (WAWF) to invoice From Solicitation - FA488727Q0003.pdf
- A past performance rating of Green, Purple, Blue or no record in SPRS; Yellow or Red ratings are dropped from consideration From Solicitation - FA488727Q0003.pdf
- Experienced telecommunications contractor whose key people have at least 3 years of telecom installation experience From SOW-FOC to Flightline and Weather Related (Wx) Equipment - Corrected Table.pdf
- DoD cybersecurity assessment clause (NIST SP 800-171) is in the solicitation From Solicitation - FA488727Q0003.pdf
- Base access: send a site visit request letter for your workers within 5 calendar days of award; airfield driving needs local training From SOW-FOC to Flightline and Weather Related (Wx) Equipment - Corrected Table.pdf
How to submit: due 09 Nov 2026, 1:00 PM local time (the notice lists Nov 9, 2026 13:00 at -08:00). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
- Serious: 50% limit on subcontracting. A women-owned small business prime must self-perform at least half of the work (not counting materials) by the end of the base term, so you cannot simply subcontract the trenching and splicing to a large firm. From Solicitation - FA488727Q0003.pdf
- Serious: Attachments contradict each other. The back half of the SOW appears to be about a different project (a fiber optic transmission system for voice, data and radio circuits, 120 days to finish, place of performance 'Luke AFB, Italy', marked DRAFT), and the solicitation refers to a Statement of Objectives while the file is a SOW, so ask the contracting officer which requirements govern before you price. From SOW-FOC to Flightline and Weather Related (Wx) Equipment - Corrected Table.pdf
- Serious: Large outside-plant construction job on a fixed price. You have to engineer, trench or bore, build handholes and pull tens of thousands of feet of cable on one firm-fixed price, which takes crews, equipment and the cash flow most small firms do not have.
Show all 9Show fewer
- Serious: SOW lengths are only estimates. The government says its distances are approximate and not for ordering materials, so you carry the risk if the real routes are longer. From SOW-FOC to Flightline and Weather Related (Wx) Equipment - Corrected Table.pdf
- Worth checking: Work on the active flight line. Crews must keep radio contact with the control tower, cannot leave equipment unattended in the controlled movement area, need escorts in secure areas and a dig permit 14 days ahead. From SOW-FOC to Flightline and Weather Related (Wx) Equipment - Corrected Table.pdf
- Worth checking: Past performance decided by SPRS score. A Yellow or Red SPRS rating knocks you out, so check your SPRS record (and your NIST 800-171 assessment, which the clauses call for) before bidding. From Solicitation - FA488727Q0003.pdf
- Minor: Personal data needed for base access. The SOW asks for driver's license numbers, birth dates and Social Security numbers of every worker in the site visit letter, so you need a way to collect and send that data safely. From SOW-FOC to Flightline and Weather Related (Wx) Equipment - Corrected Table.pdf
- Minor: Domestic sourcing rules for materials. DFARS Buy American and other domestic-preference clauses apply, so cable and hardware must come from allowed sources. From Solicitation - FA488727Q0003.pdf
- Minor: Set-aside clause does not match. The form and notice say women-owned small business set-aside, but the clause list includes the general small business set-aside notice, so confirm with the contracting officer that WOSB certification is required. From Solicitation - FA488727Q0003.pdf
Read from the notice and 6 attachments. Show which files.
- Solicitation - FA488727Q0003.pdf (read)
- SOW-FOC to Flightline and Weather Related (Wx) Equipment - Corrected Table.pdf (read)
- Ombudsman.pdf (read)
- Contractor Access to Department of the Air Force Installations.pdf (read)
- Anti-Terrorism Pamphlet.pdf (read)
- Luke AFB Environmental Guide for Contractors.pdf (read)
Full summary
What they want
- Engineer, furnish, install and test new single-mode fiber optic cable from the radar approach control building (B979) to the control tower, base ops, command post and airfield navigation and weather sites
- Cable quantities listed in the SOW: about 30,000 ft of 12-strand, 10,000 ft of 24-strand, 2,600 ft of 36-strand, 4,500 ft of 48-strand, 2,500 ft of 96-strand and 100 ft of 144-strand
- Build two new handholes, about 600 ft of new conduit and about 2,000 ft of fabric innerduct; part of the cable route may be direct buried
- Install one new network cabinet at the radar approach control building and fifteen fiber distribution panels, and terminate the new cable at each building
- Test the new cable end to end and deliver as-built drawings, test reports, schedules and status reports
- Get the dig permits and other permits, label everything, restore the sites, and run weekly project meetings
- Provide a warranty and manuals for what is installed
- Contract type
- Firm-fixed-price, 1 lot (commercial products and services solicitation)
- Period of performance
- Delivery requested by 1 Jul 2027. The SOW's own period-of-performance section was not in the text provided.
- Place of performance
- Luke Air Force Base, Arizona
- Estimated value
- Not stated
- How they'll choose
- Lowest priced, technically acceptable (LPTA). A quote must be rated Acceptable on all four technical subfactors, pass past performance, and then the lowest evaluated price wins.
- Offers due
- 09 Nov 2026, 1:00 PM local time (the notice lists Nov 9, 2026 13:00 at -08:00) (from the version posted Oct 8, 2026; amended since)
What they'll judge offers on
- Factor 1 Technical Capability (pass/fail on four subfactors: Design, Quality Control Plan, Staffing Plan, Schedule)
- Factor 2 Past Performance (pass/fail using the vendor's SPRS rating; no record counts as neutral and acceptable)
- Factor 3 Price (checked for completeness and reasonableness; Total Evaluated Price is the sum of all pricing elements)
What to include when you submit
- Technical quote must cover: a design with a cross-reference to the SOO, full materials list with specs and lead times, codes and standards, and a testing and fix-it plan
- Include a Quality Control Plan, a staffing plan (labor categories, experience, clearances, certifications) and an installation schedule with milestones and data submittals
- Price breakdown in your own format: materials (nomenclature, quantity, unit and extended price, two decimals), labor categories, rates and hours, data marked Not Separately Priced, travel, and other direct costs
- Contracting contact: Rachel Tilley, rachel.tilley.1@us.af.mil, 856-2727
- Representations and certifications through SAM (FAR 52.204-7 and DFARS 252.204-7998 Alternate A)
Not in the notice text
- How to submit the quote (email, portal or other) is not stated in the text provided
- Page limits or format for the technical quote
- The middle of the SOW (conduit and cable installation details, testing, deliverables, period of performance, project sketches and the Table A and Table B building lists) was left out of the text provided
- Which parts of the SOW apply, given that its last sections appear to describe a different transmission-equipment project at 'Luke AFB, Italy'
- Whether a site visit is offered or required before quotes are due
- Government estimate or budget for the work
- The Statement of Objectives that the design subfactor refers to, which is not among the files
More to check before you bid
Notice details
Notice type, codes, versions and files
- Posted
- Oct 8, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- FA4887 56 CONS CC, Luke AFB, AZ
- Product/service code
- 6145 · Wire and Cable, Electrical
- Business type
- Electronic parts & equipment (supplies) (FedReady's grouping, from NAICS 335921)
- Versions
11 versions have been posted, newest first.
- Nov 19, 2026 · Amendment 0010Due Dec 7, 2026 (changed)
- Nov 17, 2026 · Amendment 0009Due Nov 30, 2026
- Nov 9, 2026 · Amendment 0008Due Nov 30, 2026 (changed)
- Nov 4, 2026 · Amendment 0007Due Nov 12, 2026 (changed)
- Oct 28, 2026 · Amendment 0006Due Nov 9, 2026
- Oct 21, 2026 · Amendment 0005Due Nov 9, 2026
- Oct 19, 2026 · Amendment 0004Due Nov 9, 2026
- Oct 15, 2026 · Amendment 0003Due Nov 9, 2026
- Oct 13, 2026 · Amendment 0002Due Nov 9, 2026
- Oct 8, 2026 · Amendment 0001 (this version)Due Nov 9, 2026
- Oct 7, 2026 · Combined Synopsis/SolicitationDue Nov 9, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Open WOSB set-aside contracts
Terms on this notice: Solicitation, WOSB (women-owned small business), Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Total Small Business Set Aside for Brand: Corning Various Quantity Fiber Optic CablesThe Naval Surface Warfare Center wants Corning brand fiber optic cables in various quantities, bought from authorized distributors or resellers.
- Cable Assy BTCThe Navy's NAVSUP Weapon Systems Support (Mechanicsburg office) wants 70 cable assemblies (CABLE ASSY BTC), NSN 6145 015688537, solicitation N0010426RNE72.