Combined Synopsis/Solicitation
Bushy Knoll Pit Crush & Stockpile
Department of Agriculture · Forest Service
Small business set-aside · Happy Jack, AZ
AI summary Beta
This summary may miss requirements: 2 of 7 attachments weren't read (Attachment 3 - Schedule of Items.xlsx, Attachment 6 - Wage Determination.pdf). Check the attachments on SAM.gov.
Solicitation 127EAX27Q0017: the Forest Service (USDA, CSA Southwest 7) wants a small business to open a new gravel pit at Bushy Knoll in the Coconino National Forest near Happy Jack, Arizona. The work includes blasting, crushing and stockpiling aggregate (crushed rock), and building an access road. Only small businesses can bid. The response due date is January 6, 2027, 1:00 PM Central, by email. A bid guarantee of 20 percent of the bid price is required.
Who can bid (6)
- Total small business set-aside: only small businesses can bid (size standard: 500 employees)
- Bid guarantee of 20 percent of the bid price, sent with the offer
- Three similar projects completed in the last three years; having no record is rated neutral, not disqualifying From 127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf
Show all 6Show fewer
- Key personnel with relevant experience, with a letter of intent for assignment to the project From 127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf
- Arizona Department of Environmental Quality (ADEQ) permits for the contractor's methods, including an air quality permit and notice of intent
- Topographic survey done by a licensed and insured company From Attachment 5 - Site Plan.pdf
How to submit: Email to the Contracting Officer, troy.mccullough@usda.gov, with the solicitation number in the name of each document, due January 6, 2027, 1:00 PM Central (SAM.gov); the solicitation text says January 6, 2026, 1:00 PM Central Time. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (10)
From the version posted Nov 19, 2026.
- Serious: Small business set-aside. Only small businesses (500 employees or fewer) can bid; larger firms are shut out.
- Serious: Bid guarantee of 20 percent of the bid price. A bid guarantee (a bond or other security backing the offer) must come with the offer; many small firms can't get one this large, and the schedule's total is not known.
- Worth checking: Performance period dates conflict. The SF 1442 gives January 13, 2027 to January 12, 2028, the statement of work gives 6/1/26-09/30/27, and the solicitation says 180 calendar days after notice to proceed. From Attachment 1 - Statement of Work.pdf
Show all 10Show fewer
- Worth checking: Davis-Bacon wages apply; wage determination not read. Davis-Bacon (federal construction wage rates) set the minimum pay, but the wage determination is a scanned PDF with no readable text. From 127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf
- Worth checking: Schedule of Items attached but not read. The price schedule spreadsheet has the quantities and units for every line, and a proposal missing any base or option price is excluded. From 127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf
- Worth checking: Air quality permit and stormwater plan are the contractor's job. The contractor must get the ADEQ air quality permit and file a notice of intent with a stormwater pollution prevention plan (SWPPP) and erosion control plan, with fees. From Attachment 5 - Site Plan.pdf
- Worth checking: Weak technical proposals are rejected. Proposals that only restate the requirements or say "will comply" are unacceptable and not considered further. From 127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf
- Minor: Site visit on December 3. An organized site visit is set for December 3 at 10:00 AM local time at the Coc-211 and 211D intersection; the text does not say whether attendance is required. From 127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf
- Minor: Fire restrictions can shut down work. Blasting, crushing and other work may be halted or limited by fire restriction stages, and fire guards must stay on site after work. From Attachment 4 - Fire Plan.pdf
- Minor: No Government water at the site. Bidders must plan their own water and security; camping at the site may be allowed with a free district permit. From Attachment 5 - Site Plan.pdf
Read from the notice and 5 attachments. 2 of 7 not read. Show which files.
- 127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf (read)
- Attachment 1 - Statement of Work.pdf (read)
- Attachment 2 - Specifications.docx (read)
- Attachment 4 - Fire Plan.pdf (read)
- Attachment 5 - Site Plan.pdf (read)
- Attachment 3 - Schedule of Items.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- Attachment 6 - Wage Determination.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Mobilize, survey, and clear and grub (remove trees, brush and stumps) the proposed work area
- Build an access road to the work area
- Drill and extract material by blasting or excavation, then crush it and stockpile the aggregate to the R3-G surface aggregate gradation
- Sample and test material, and survey the stockpile for quality control
- Complete a topographic survey before, during and after work, done by a licensed and insured company
- Get all Arizona Department of Environmental Quality (ADEQ) permits, including an air quality permit and notice of intent (NOI) with a stormwater pollution prevention plan (SWPPP) and erosion control plan
- Send plans for review: plan of operations, traffic control, blasting, soil erosion control, hazardous spill, quality control and work schedule
- Follow the Coconino National Forest industrial fire precautions, including fire guards and equipment restrictions
- Contract type
- Firm-fixed-price (FFP): one set price, whatever the work ends up costing. One award is planned, with a base item and four option line items (Option A to D).
- Period of performance
- Start work within 10 calendar days after notice to proceed (NTP, the Government's written go-ahead) and finish within 180 calendar days after NTP. The SF 1442 gives January 13, 2027 to January 12, 2028; the statement of work gives 6/1/26-09/30/27.
- Place of performance
- Bushy Knoll pit, Mogollon Rim Ranger District, Coconino National Forest, Arizona; SAM.gov lists Happy Jack, AZ. Delivery address: USDA Forest Service, Mogollon Rim Ranger District, 8738 Ranger Rd, Happy Jack, AZ 86024.
- Estimated value
- Not stated
- How they'll choose
- Highest technically rated proposal, if its price is fair and reasonable and past performance is acceptable or neutral. No tradeoffs; award is not necessarily to the lowest price.
- Offers due
- January 6, 2027, 1:00 PM Central (SAM.gov); the solicitation text says January 6, 2026, 1:00 PM Central Time
- How to submit
- Email to the Contracting Officer, troy.mccullough@usda.gov, with the solicitation number in the name of each document
- Page limits
- Work Plan / Capability: 10 pages; Key Personnel: 3 pages; Performance Schedule: 6 pages
What they'll judge offers on
- Technical Approach, Factor 1 Work Plan / Capability of the Offeror (10 pages): ability to do the work, work to be subcontracted, sequence of work, personnel and equipment, site-specific safety plan
- Technical Approach, Factor 2 Key Personnel (3 pages): experience with similar work, letter of intent, personnel list with titles and years of experience, number of crews
- Technical Approach, Factor 3 Performance Schedule (6 pages): time-scaled network diagram, critical path method (CPM) schedule or Gantt chart showing the whole project within the performance period
- Price: schedule of items for the base and all option line items, checked for fair and reasonable pricing
- Past Performance: list of three similar projects completed in the last three years, rated Acceptable, Neutral or Unacceptable
What to include when you submit
- Send three separate Adobe PDF documents: the signed SF 1442 offer, the price proposal on the Schedule of Items, and the technical proposal with technical approach and past performance
- SF 1442 (Standard Form 1442, the form you sign and return as your offer): complete blocks 10 fill-ins, 14, 15, 16, 17, 20a, 20b and 20c, signed by a person who can bind the firm; acknowledge any amendments in block 19
- Price every item on the Schedule of Items for the base period and all option line items; leaving one out gets a proposal excluded
- Include the bid guarantee, 20 percent of the bid price
- Include any quantity discounts and prompt payment discounts in the price section
- Work plan: describe the work to be subcontracted, the sequence of work, resources and availability including subcontractors, a site-specific safety plan, and how each SOW task will be done
- Key personnel: list personnel with job titles and years of experience, number of crews and the people in each, and a letter of intent for assignment to the project
- Performance schedule: a time-scaled network diagram, CPM schedule or Gantt chart showing the critical path, in calendar days, including long-lead items
- Past performance: list three projects of similar size and nature completed in the last three years, with project name and location, a point of contact with phone, email and fax, total cost, size, and start and completion dates
- Hold prices firm for 60 calendar days
After award, you must have
- Performance and payment bonds (guarantees from a surety that the work will be done and workers and suppliers paid) if required, after award From 127EAX27Q0017 Bushy Knoll Pit Crush and Stockpile.pdf:
52.228-15 Performance and Payment Bonds-Construction (Jun 2020)
Not in the notice text
- The Schedule of Items (Attachment 3 - Schedule of Items.xlsx) is attached but not read; the quantities, units and what each option line covers are in it
- The wage determination (Attachment 6 - Wage Determination.pdf) is attached but not read, because it is a scanned PDF; the Davis-Bacon rates are in it
- The documents call the price schedule Attachment 2 in some places and Attachment 3 in another, and the statement of work lists attachments with letters; check which file is the schedule
- The text does not say whether the December 3 site visit is required
- The Government's estimate or budget for the contract is not given, and the option periods and their timing are not described
- Whether the offer guarantee box on the SF 1442 is marked could not be read from the form; check the form on SAM.gov
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- USDA-FS, CSA Southwest 7, Albuquerque, NM
- Product/service code
- F011 · Natural Resources/Conservation – Surface Mining Reclamation (Non-Construction)
- Business type
- Environmental & natural resources (FedReady's grouping, from product/service code F011)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- 2027 RFO Comanche Oxbow Trail Material
- CD | 884 | Black Hills | Sources Sought Aggregates SupplySources sought notice 36C78627Q0038 from the VA National Cemetery Administration.
- Devens MA- Devens RFTA- Graded Road Base/ Screened Loam/ Trap Stone- SupplyThis is a sources sought notice (a request for information, not a request for quotes) from Army Contracting Command - Rock Island, solicitation number ACC-RI-DIX-11102026.
- Road Salt