Solicitation
Subnet BAA
Department of Defense · Defense Logistics Agency
AI summary Beta
The Defense Logistics Agency (DLA), through its Philadelphia contracting office, has posted an open Broad Agency Announcement (BAA, a standing call for research ideas) called SUBNET to improve the military food (subsistence) supply chain, especially in contested environments. Companies first send a short white paper; DLA may then ask for a full proposal, and work runs in two stages (a feasibility study of up to 12 months, then possibly prototype or concept work of up to 24 months). Up to $35 million is planned in total across all projects for Fiscal Years 2026 - 2030, subject to funds, and the BAA stays open five years.
Who can bid (8)
- Open to all responsible sources; the BAA is unrestricted and no part is set aside, though small and socioeconomic businesses are encouraged to submit From SUBNET BAA 2026_Version8_2026 clean - Copy.pdf
- Other than small businesses must submit a small business subcontracting plan above a dollar threshold; small businesses are exempt. The size standard used is 1000 employees (NAICS 541715) From SUBNET BAA 2026_Version8_2026 clean - Copy.pdf
- Cost-reimbursement pricing requires a description of your accounting system and a copy of DCAA (or HHS) approval of it, plus a statement of any negotiated rates From SUBNET BAA 2026_Version8_2026 clean - Copy.pdf
Show all 8Show fewer
- Certified cost or pricing data may be requested for cost proposals of $2,000,000 or more; below that, data other than certified cost or pricing data is required
- All submissions (white papers and proposals) must carry Source Selection Information and CUI markings From SUBNET BAA 2026_Version8_2026 clean - Copy.pdf
- Cybersecurity: the shipment condition monitoring topic may involve CMMC Level 1; the attached clause list also includes DFARS 252.204-7012, 252.204-7019/7020 and 252.204-7021 (CMMC). The specific level required is not stated
- A CAGE code is requested on the cost proposal cover sheet From SUBNET BAA 2026_Version8_2026 clean - Copy.pdf
- The attached clause list includes representations about covered telecommunications equipment (FAR 52.204-24 and 52.204-26) and prohibitions on certain foreign-made unmanned aircraft and similar security exclusions
How to submit: Email. White papers go to Andrea.Nicolucci@dla.mil, Lauren.Runowski@dla.mil and RandD.DCSO@dla.mil. If a full proposal is requested, send it as a PDF by email to the contracting point of contact with a copy to the DCSO R&D mailbox; if files are too large for email, use the Solicitation Module on PIEE (https://piee.eb.mil) after contacting the primary point of contact., due SAM.gov response deadline: Jul 13, 2031, 11:59 PM EDT. The BAA text says it stays open for five years from the 07/14/2026 posting date and gives no separate white paper due date.. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (9)
From the version posted Jul 14, 2026.
- Serious: Multi-step process; Stage II is invitation only. This notice is the first step: a white paper that is not evaluated, then a proposal only if DLA asks, then Stage I (feasibility study) and Stage II (prototype or concept) only by invitation after Stage I; no step has its own due date, and only offerors with a documented history of successful SUBNET performance may skip Stage I. From SUBNET BAA 2026_Version8_2026 clean - Copy.pdf
- Serious: Cost-reimbursement pricing with accounting system approval. The cost proposal assumes a cost-reimbursement contract, a DCAA or HHS accounting system approval, indirect rate details, a cost realism review and a proposal adequacy checklist, which many small businesses without government cost accounting cannot meet. From SUBNET BAA 2026_Version8_2026 clean - Copy.pdf
- Worth checking: White papers may go nowhere. A white paper is not evaluated and DLA can decline to ask for a proposal, so the time spent preparing it may not lead to an award. From SUBNET BAA 2026_Version8_2026 clean - Copy.pdf
Show all 9Show fewer
- Worth checking: Only innovative work is wanted. Ordinary supply or small improvements to existing items will be turned away, so this is not a normal product or service contract. From SUBNET BAA 2026_Version8_2026 clean - Copy.pdf
- Worth checking: Strict format and page limits. Templates are mandatory, every page needs source selection and CUI markings, and proposals that miss the format rules or run past 20 pages can be excluded. From SUBNET BAA 2026_Version8_2026 clean - Copy.pdf
- Worth checking: Short deadline for the cost proposal. After DLA asks for a proposal, the detailed cost volume is due within 30 calendar days, which is tight if you need subcontractor cost proposals and rate documentation. From SUBNET BAA 2026_Version8_2026 clean - Copy.pdf
- Worth checking: Funding is a shared ceiling, not a guarantee. Up to $35 million over five years is planned for all projects combined, subject to funds, so individual awards may be small or may not happen. From SUBNET BAA 2026_Version8_2026 clean - Copy.pdf
- Minor: Government lab collaboration for new food products. New food products or technologies must be worked with the Army Combat Feeding Directorate as directed by the SUBNET Program Manager, which can add steps and delay.
- Minor: Inconsistent details inside the BAA. The subcontracting plan threshold is $900,000 in Section 6 but $750,000 in Attachment B, the proposal email subject is given as 'BAA 0005-26' rather than the solicitation number, and the Section 7 reference to the cost checklist as Attachment C does not match its Attachment D label; ask the contracting office which applies. From SUBNET BAA 2026_Version8_2026 clean - Copy.pdf
Read from the notice and 1 attachment. Show which files.
- SUBNET BAA 2026_Version8_2026 clean - Copy.pdf (read)
Full summary
What they want
- Agile and predictive acquisition: new ways to buy innovative commercial rations (vacuum-sealed, freeze-dried, UHT) with shelf life over 5-7 years, and a pre-qualified vendor base
- Smart packaging and pre-positioning: durable packaging with embedded tracking, temperature/humidity/shock sensors and chemical indicators of food safety and quality
- Autonomous last-mile distribution: unmanned ground vehicles or cargo drones moving food from caches to dispersed units
- Other areas of interest: combat rations, food equipment and field feeding, food safety, nutrition, water security, garrison feeding, storage and packaging, surge support
- Technology topics: shipment condition monitoring, robotics and automation for ration assembly, 3D food printing, AI supply chain optimization, sustainable food production, circular economy
- Stage I deliverable: a feasibility study report (capability gaps, requirements, concept of operations, functional and system requirements, metrics, estimated technology readiness level)
- Stage II deliverable (invitation only): either an analytical study or conceptual solution, or a physical prototype at technology readiness level 7 or higher with testing
- Additional topics: other innovative research that fits SUBNET objectives, with a clear statement of the proposed area
- Contract type
- Cost-reimbursement contracts (the cost proposal must pick a cost-reimbursement type; fixed fee under cost-plus-fixed-fee may not exceed 10% of estimated cost)
- Period of performance
- BAA open for five years from posting; individual awards typically six to 36 months. Stage I (feasibility study) not to exceed 12 months; Stage II (prototype or concept) not to exceed 24 months
- Place of performance
- Philadelphia, PA, USA (as listed in the SAM.gov fields); the BAA text does not give a separate place of performance
- Estimated value
- Total Government investment up to a $35 million ceiling for 5 years (Fiscal Years 2026 - 2030), shared across all SUBNET contracts and projects, subject to availability of funds. No per-award value is stated
- Contract vehicle
- Broad Agency Announcement (BAA) under FAR Part 35; unrestricted, no set-aside
- How they'll choose
- Peer or scientific review of technical proposals using adjectival ratings (Highly Acceptable, Acceptable, Not Acceptable). Proposals are not compared with each other, and the Government may make awards to all, some or none. White papers are not evaluated; they are only reviewed to decide whether to request a proposal. Stage I study results are rated against Stage I objectives (for example Acceptable or Unacceptable). Cost is not normally the controlling factor, but cost realism is analyzed.
- Offers due
- SAM.gov response deadline: Jul 13, 2031, 11:59 PM EDT. The BAA text says it stays open for five years from the 07/14/2026 posting date and gives no separate white paper due date.
- How to submit
- Email. White papers go to Andrea.Nicolucci@dla.mil, Lauren.Runowski@dla.mil and RandD.DCSO@dla.mil. If a full proposal is requested, send it as a PDF by email to the contracting point of contact with a copy to the DCSO R&D mailbox; if files are too large for email, use the Solicitation Module on PIEE (https://piee.eb.mil) after contacting the primary point of contact.
- Page limits
- White paper: 6 pages (1-page cover sheet + 1-page executive summary + 4-page Project Summary). Technical proposal (Volume I): 20 single-sided pages including cover page, executive summary and appendices (resumes and certifications of key personnel not counted). Cost proposal (Volume II): no page limit.
What they'll judge offers on
- Factor 1, Feasibility (Overall Scientific and Technical Merit): innovative, feasible, comprehensive approach, expertise of the team, complete task descriptions and deliverables, technical risks and mitigation
- Factor 2, Viability: likelihood of transitioning to an operational capability, understanding of working with DLA and DoW, cybersecurity awareness (for example FedRAMP for IT)
- Factor 3, Desirability: clear benefits to DLA and likelihood of adoption (low barriers to transition, simplicity, ease of use)
- Factor 4, Past Performance, Capabilities and Recent, Related Experience: relevant work within the last three years, technical papers and research; offerors with no relevant record are rated neutral
- Factor 5, Cost Realism: whether estimated costs are realistic and consistent with the technical proposal
What to include when you submit
- Step 1: submit a white paper using the mandatory Attachment A template (PDF, doc or docx; English; 8-1/2 x 11 paper, 1-inch margins, 12-point font; 8 or 10-point allowed in figures, tables and charts)
- Only if the Contracting Officer requests it: submit a full proposal in two separate volumes, Volume I Technical and Volume II Cost/Price, with no pricing in the technical volume
- Technical volume parts: cover sheet, one-page executive summary, feasibility/viability/desirability, and past performance (no more than five contracts within the last three years, points of contact, teaming experience, bibliography)
- Cost proposal due within 30 calendar days of the Contracting Officer's request; include cover sheet with CAGE code, accounting system description and DCAA or HHS approval, approved rates, audit or forward pricing agreement, work breakdown structure, and the completed Proposal Adequacy Checklist
- Mark every page 'Source Selection Information - See FAR 2.101 and 3.104' and with CUI markings; mark proprietary data and include the required restriction legends or a statement that there are no proprietary claims
- Email subject for full proposals is given as 'BAA 0005-26'; proposal prices and terms must stay valid 180 days
- Questions go to the contracting points of contact (email preferred)
Not in the notice text
- No white paper due date is stated other than the SAM.gov response deadline and the five-year open period
- Relative importance or weights of the evaluation factors are not stated
- Dollar value of individual awards is not stated, only the overall $35 million ceiling
- Which CMMC level, if any, applies to a given project is not stated
- Timing of the Contracting Officer's response to a white paper, and of Stage II invitations, is not stated
- Place of performance is listed only in the SAM.gov field (Philadelphia, PA); where work and testing would actually happen is not stated
- Whether the Government Stage II testing sites are in particular locations is not stated
More to check before you bid
- The notice names requirements:
- The notice mentions an approved or qualified source list. Only listed sources may be eligible, so check that your company or product is on it.
- The notice mentions CMMC, the Defense Department's cybersecurity certification. Check the level it asks for.
Notice details
Notice type, codes, versions and files
- Posted
- Jul 14, 2026
- Notice type
- Solicitation
- Office
- Dcso Philadelphia, PA
- Product/service code
- AC33 · National Defense R&D Services; Defense-Related Activities; Experimental Development
- Business type
- Engineering, architecture & research (FedReady's grouping, from NAICS 541715)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation