Solicitation
Rehab Kiosk Restrooms, NPS-ORCA
Department of the Interior · National Park Service
Small business set-aside · Cave Junction, OR
A newer version of this notice was posted Nov 23, 2026. See the latest version.
AI summary Beta
Summary of the version posted Nov 21, 2026. The notice was amended Nov 23, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 1 of 10 attachments weren't read (B08_Att_05_ORCA_Hazmat_Report_2011_0001.pdf). Check the attachments on SAM.gov.
Only small businesses can bid on RFQ 140PP027Q0018. The National Park Service wants the two historic kiosk restrooms at Oregon Caves National Monument & Preserve, Josephine County, Oregon, gutted and rebuilt with new plumbing, electrical, ADA layouts, PVC wall panels and tile floors. It is a firm-fixed-price (FFP: one set price, whatever the work ends up costing) construction purchase order, to be finished within 90 calendar days of notice to proceed and before cave tours resume in late March 2027.
Who can bid (4)
- Total small business set-aside: only small businesses can bid (NAICS 236220, size standard $45M) From Sol_140PP027Q0018.pdf
- Active SAM.gov registration at the time the quotation is submitted From Sol_140PP027Q0018.pdf
- Oregon Construction Contractors Board license applicable to the work; scored, not required to bid From B08_Att_04_140PP027Q0018_Q-A_0001.pdf
Show all 4Show fewer
- Relevant experience and past performance on similar projects within the last six years From Sol_140PP027Q0018.pdf
How to submit: Email to alanna_gardner@ios.doi.gov (Adobe PDF preferred). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (7)
- Serious: Small businesses only. Quotations from businesses that aren't small under NAICS 236220 won't be considered. From Sol_140PP027Q0018.pdf
- Worth checking: Hard finish before cave tours resume. All work must be done through winter, at a remote site where snow can block the road, so schedule risk falls on you. From Sol_140PP027Q0018_Amd_0002.pdf
- Worth checking: Winter access and no on-site lodging. Snowstorms can delay access, the building has no heat, and there are no overnight accommodations in the park. From B08_Att_06_140PP027Q0018_Q-A_0002.pdf
Show all 7Show fewer
- Worth checking: Payment bond or letter of credit after award. You must post 100 percent payment protection within 10 days of award, so line up a surety or bank first. From Sol_140PP027Q0018.pdf
- Worth checking: Asbestos and lead testing results not in the documents. The 2011 hazmat report found no asbestos in tested materials but has no lead analysis, and new test results were promised in an amendment. From B08_Att_04_140PP027Q0018_Q-A_0001.pdf
- Minor: Residential wage determination. Davis-Bacon wage decision OR20260006 (residential) applies; trades not listed need a conformance request after award. From Sol_140PP027Q0018.pdf
- Minor: No drawings provided. There are no drawings or as-builts, only square footage, so price from the site visit and the Q&A dimensions. From B08_Att_06_140PP027Q0018_Q-A_0002.pdf
Read from the notice and 9 attachments. 1 of 10 not read. Show which files.
- Sol_140PP027Q0018_Amd_0002.pdf (read)
- Sol_140PP027Q0018_Amd_0001.pdf (read)
- Sol_140PP027Q0018.pdf (read)
- B08_Att_06_140PP027Q0018_Q-A_0002.pdf (read)
- B08_Att_03_140PP027Q0018_Site_Visit_Sign-In_Sheet_0001.pdf (read)
- B08_Att_04_140PP027Q0018_Q-A_0001.pdf (read)
- B08_Att_01_140PP027Q0018_Specs.pdf (read)
- B08_Att_02_140PP027Q0018_Wage_Rates.pdf (read)
- B08_Att_03_140PP027Q0018_Tech_Info_Form.docx (read)
- B08_Att_05_ORCA_Hazmat_Report_2011_0001.pdf: not read (it couldn't be opened): open it on SAM.gov
Full summary
What they want
- Demolish both restroom interiors to structural framing, removing tile, drywall, ceilings, insulation, fixtures, piping, wiring and partitions, and haul debris off site
- New plumbing supply and vent systems, sensor-operated ADA toilets, touchless faucets, and two flush toilets per restroom (the urinal is replaced by a toilet)
- New code-compliant wiring in rodent-proof conduit, vandal-resistant LED lighting with occupancy sensors, new wall heaters and two new hand dryers
- Install 884 SF of sanitary PVC wall and ceiling panels
- Repair and waterproof 156 SF of concrete slab (plan on 100 linear feet of crack repair), fix floor drains, and lay 2"x2" porcelain tile with about 90 LF of porcelain cove base
- ADA layouts: one 60 in. x 60 in. accessible stall and one 42 in. x 60 in. stall per restroom, grab bars and accessible sinks
- Seal all openings against rodents with stainless steel mesh, hidden to keep the historic exterior unchanged
- Submittals, a baseline schedule, a site safety plan, daily logs, and as-built drawings at closeout
- Contract type
- Firm-fixed-price commercial construction purchase order, one lump-sum (LS) line item
- Period of performance
- 90 calendar days from notice to proceed, including 10 weather days; Amendment 0002 lists December 14, 2026 to March 14, 2027
- Place of performance
- Oregon Caves National Monument & Preserve, 19000 Caves Highway, Cave Junction, OR 97523 (Josephine County)
- Estimated value
- The Government seeks quotations with a total price less than $90K (not a ceiling or floor)
- How they'll choose
- Best value under simplified procedures: most advantageous to the Government, price and other factors considered; award may go to other than the lowest price
- Offers due
- December 3, 2026, 5:00 PM Pacific (from the version posted Nov 21, 2026; amended since)
- How to submit
- Email to alanna_gardner@ios.doi.gov (Adobe PDF preferred)
- Page limits
- Technical approach narrative: 5 pages, plus spec sheets in an appendix (B08_Att_04 Q&A changed this from 10 pages)
What they'll judge offers on
- Price
- Technical Approach: (a) project sequencing and timeline within 90 days, (b) risk management, (c) equipment spec sheets and ADA feasibility
- Relevant Experience: similar restroom renovations within the last six (6) years
- Past Performance: similar projects within the last six (6) years, from your references and CPARS
- Oregon Contractor State License: a current Oregon Construction Contractors Board license for you and any subcontractors is rated more favorably
What to include when you submit
- Standard Form 1442 (the construction offer form): complete blocks 14 through 20C and sign; put your Unique Entity Identifier (UEI) in block 14
- Acknowledge Amendments 0001 and 0002
- Price the one lump-sum line on the Section III Quote Sheet, in whole dollars
- Fill in the Technical Information Form (Attachment 3): company details, whether you self-perform, and any subcontractors by trade
- Technical approach: work sequencing within 90 days, schedule and price risks with mitigation, manufacturer spec sheets for toilets, partitions and sinks, and a narrative or layout diagram showing ADA compliance
- Relevant experience: comparable projects from the last six (6) years with a short narrative on how each relates to this work
- Past performance references for similar projects from the past six (6) years, using the same projects as relevant experience when possible
- Copy of your current Oregon Construction Contractors Board license, and any subcontractor's
- Have an active SAM.gov registration when you submit; a pending registration doesn't count
- Send questions by email to the contracting officer no later than five (5) calendar days before the response due date
- If you can't invoice through the Invoice Processing Platform (IPP), include a written waiver request
After award, you must have
- Payment bond or irrevocable letter of credit for 100 percent of the contract price, within ten (10) days of award From Sol_140PP027Q0018.pdf:
The submission of the payment protection is required within ten (10) days of contract award.
- Liability insurance of at least $500,000.00 each person, each occurrence and property damage, with a certificate before work starts From Sol_140PP027Q0018.pdf:
The amounts of the insurance shall be not less than as follows:
Not in the notice text
- The 2011 hazardous materials report (B08_Att_05_ORCA_Hazmat_Report_2011_0001.pdf) is attached but not read.
- Results of the new asbestos and lead testing (estimated by November 20, 2026 in the first Q&A) aren't in the amendments read here.
- Whether a performance bond is required isn't clear from the SF 1442 text; check block 12 of the form on SAM.gov.
- The exact question deadline date isn't written out; it's five calendar days before the response due date.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 21, 2026
- Notice type
- Solicitation
- Office
- National Park Service Contracting Activity, Denver, CO
- Product/service code
- Z2QA · Repair or Alteration of Restoration of Real Property (Public or Private)
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
4 versions have been posted, newest first.
- Nov 23, 2026 · Amendment 0003Due Dec 3, 2026
- Nov 21, 2026 · Amendment 0002 (this version)Due Dec 3, 2026 (changed)
- Nov 13, 2026 · Amendment 0001Due Nov 20, 2026 (changed)
- Oct 27, 2026 · SolicitationDue Nov 16, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Modernize 6N Inpatient Restrooms (Swing for 3N)Only certified service-disabled veteran-owned small businesses (SDVOSB) listed in the Small Business Administration (SBA) veteran certification database can bid on solicitation…
- 11842 Perl Renovate 7 Public RestroomsThe National Park Service is asking firms to show interest in renovating seven public restrooms in Buildings A and F at the Pearl Harbor National Memorial visitor center on Oahu.
- Thomas P. Stafford Building (TPS) Restroom Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OKThe Federal Aviation Administration (FAA) is running a market survey (not a request for proposals) for restroom upgrades at the Thomas P. Stafford Building at the Mike Monroney…