Combined Synopsis/Solicitation
Carpet Replacement Building 606
Department of Defense · Department of the Air Force
Small business set-aside · JBER, AK
A newer version of this notice was posted Nov 24, 2026. It moves the due date from Nov 25, 2026 to Nov 30, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Nov 19, 2026. The notice was amended Nov 24, 2026. The due date moved from Nov 25, 2026 to Nov 30, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 1 of 5 attachments weren't read (Attachment 4 - Building 606 Overhead Map.pdf). Check the attachments on SAM.gov.
The Air Force's 673 Contracting Squadron (solicitation FA500027Q0003) wants old carpet and cove base removed and new carpet installed in Building 606 at Joint Base Elmendorf-Richardson (JBER), Alaska, about 2,707 square feet over two floors. Only small businesses can bid. The response due date is November 25, 2026, 4:00 PM AKST, and the work must be done within 120 calendar days after award.
Who can bid
- Small business only: this is a total small business set-aside (NAICS 238330, size standard $19,000,000) From RFQ_Carpet_Replacement_Bldg_606_COMBO.pdf
- Active SAM registration to be considered for award From RFQ_Carpet_Replacement_Bldg_606_COMBO.pdf
- Complete a NIST SP 800-171 self-assessment in SPRS (repeated every three years); vendor risk is considered under responsibility From RFQ_Carpet_Replacement_Bldg_606_COMBO.pdf
How to submit: Email to clay.schott@us.af.mil with a copy to evelyn.hebert@us.af.mil (the RFQ says quotes are submitted via SAM.gov to these addresses), due November 25, 2026, 4:00 PM AKST. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (8)
- Serious: Small business set-aside. Only small businesses can send quotes; a business over the $19,000,000 size standard cannot bid. From RFQ_Carpet_Replacement_Bldg_606_COMBO.pdf
- Serious: Response due date November 25, 2026, 4:00 PM AKST; questions due November 23, 2026. The solicitation was posted November 19, 2026, which leaves a few days for the site visit, questions and a quote with a carpet and cove image. From RFQ_Carpet_Replacement_Bldg_606_COMBO.pdf
- Worth checking: Scope mismatch: statement of work also mentions VCT and tile. The notice and pricing schedule describe carpet and cove only, but the statement of work also lists tile removal and vinyl composition tile (VCT) installation; ask the contracting officer what is included. From Attachment 1 - Statement of Work Replace Carpet Building 606.pdf
Show all 8Show fewer
- Worth checking: Escorted access in an occupied building. Work happens while staff are in the building, and facility personnel must escort contractor employees at all times, so scheduling depends on the escorts. From Attachment 1 - Statement of Work Replace Carpet Building 606.pdf
- Worth checking: Liquidated damages for late work. The contractor owes money to the Government if work is not finished within the scheduled performance period (120 calendar days after award); the rate is not given. From Attachment 1 - Statement of Work Replace Carpet Building 606.pdf
- Worth checking: The site visit was Nov 23, 2026. Check the notice and its amendments for whether attendance was required, and whether another visit is offered. From RFQ_Carpet_Replacement_Bldg_606_COMBO.pdf
- Minor: Vendor must field-verify quantities. The Government gives 2,707 square feet (1,230 on floor 1, 1,477 on floor 2), but the contractor is responsible for checking all measurements. From Attachment 1 - Statement of Work Replace Carpet Building 606.pdf
- Minor: Shipping to Alaska must be in the price. Freight to JBER is not paid separately, so it must be built into your quoted price. From Attachment 2 - Pricing Schedule Replace Carpet Building 606.docx
Read from the notice and 4 attachments. 1 of 5 not read. Show which files.
- RFQ_Carpet_Replacement_Bldg_606_COMBO.pdf (read)
- Attachment 1 - Statement of Work Replace Carpet Building 606.pdf (read)
- Attachment 2 - Pricing Schedule Replace Carpet Building 606.docx (read)
- Attachment 3 - Additional Provisions and Clauses Replace Carpet Building 606.pdf (read)
- Attachment 4 - Building 606 Overhead Map.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Remove and dispose of existing carpet and cove base on floors 1 and 2 of Building 606
- Prep the floors for new finishes
- Install new commercial grade carpet (olive drab green, nylon, plush, 60 oz, heavy traffic) and new cove base
- Work while the building is occupied, with facility staff escorting contractor employees at all times
- Field-verify all measurements and haul debris off base to an approved disposal facility
- Pass on the manufacturer's commercial warranties for the product
- Contract type
- Request for quotation (RFQ) for a commercial product; one pricing line, QTY 1 Job
- Period of performance
- Delivery no later than 120 calendar days after date of award
- Place of performance
- A Street, Bldg 606, Fort Richardson, AK 99505, 1st and 2nd floor, Joint Base Elmendorf-Richardson, AK
- Estimated value
- Not stated
- How they'll choose
- Lowest price technically acceptable: the lowest-priced quote that is rated Acceptable wins, from a responsible vendor
- Offers due
- November 25, 2026, 4:00 PM AKST (from the version posted Nov 19, 2026; amended since)
- How to submit
- Email to clay.schott@us.af.mil with a copy to evelyn.hebert@us.af.mil (the RFQ says quotes are submitted via SAM.gov to these addresses)
What they'll judge offers on
- Technical Acceptability: rated Acceptable or Unacceptable on whether the quoted supply can meet the statement of work, including an image of the selected carpet and cove
- Price: lowest price among technically acceptable quotes
- Responsibility: vendor risk is considered, including a National Institute of Standards and Technology (NIST) SP 800-171 self-assessment in the Supplier Performance Risk System (SPRS)
What to include when you submit
- Part 1, Technical Acceptability: show clear evidence you can meet every requirement of the statement of work, including an image of the selected carpet and cove.
- Part 2, Price: use Attachment 2, the pricing schedule, which asks for company name, unit price, total price, quote expiration date, business size, delivery date, net terms, UEI/CAGE, and a signature by an official of the company.
- Include shipping costs to JBER, Alaska in the unit prices.
- Quotes must be good for sixty (60) days.
- Do not send .zip files; use .pdf, .docx or .xlsx.
- Clearly identify any exception to the solicitation terms and give the reason.
- Be registered in the System for Award Management (SAM) to be considered for award.
Not in the notice text
- Which rooms are excluded from new flooring is listed on a floor plan; Attachment 4 (Building 606 Overhead Map) is attached but not read because it is a scanned PDF with no text, so check it on SAM.gov.
- Whether a Davis-Bacon wage determination applies is not stated in the documents (this is construction work, NAICS 238330).
- The amount of liquidated damages is not given.
- The statement of work mentions tile and VCT but gives no quantity for them; the layout lists only carpet.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- FA5000 673 CONS PKB, JBER, AK
- Product/service code
- 7220 · Floor Coverings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 238330)
- Versions
3 versions have been posted, newest first.
- Nov 24, 2026 · Amendment 0002Due Nov 30, 2026 (changed)
- Nov 20, 2026 · Amendment 0001Due Nov 25, 2026
- Nov 19, 2026 · Combined Synopsis/Solicitation (this version)Due Nov 25, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- USCG Station Cortez Carpet Removal and Luxury Vinyl Plank (LVP) Flooring InstallationThe U.S. Coast Guard (Base Miami Beach) wants a small business to remove carpet and install luxury vinyl plank (LVP) flooring and vinyl base on the 2nd deck of the Multipurpose…
- Carpet Replacement at USCG Air Station ClearwaterOnly small businesses can bid. The Coast Guard (Base Miami Beach) wants old carpet and cove base replaced in offices at Air Station Clearwater, Florida, about 2,820 SF of carpet…
- JAX and TBW WFO CARPET REPLACEMENT
- Flooring Requirement Contract SolicitationSolicitation FA465927Q0001: the Air Force's 319th Contracting Squadron seeks one small business for a firm-fixed-price (FFP) flooring contract at Grand Forks AFB, ND, with a…
- Grout Maintenance for the Puget Sound VAThe Department of Veterans Affairs (VA), Network Contracting Office 20, wants quarterly grout and tile floor maintenance, sealing and restoration for about 40,000 square feet of…