Solicitation
Low Level Cranes- CSO
Department of Defense · Department of the Army
A newer version of this notice was posted Nov 19, 2026. It moves the due date from Nov 9, 2026 to Nov 30, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Oct 7, 2026. The notice was amended Nov 19, 2026. The due date moved from Nov 9, 2026 to Nov 30, 2026. Check what else changed on SAM.gov. The notice looks incomplete: Estimated value or budget. Check the attachments on SAM.gov.
The Army (Anniston Army Depot in Alabama) wants a company to design, build, deliver, install and test seven new low-level overhead cranes in Building 400, replacing 1954-era cranes that are past their useful life. This is a Phase 1 response to a Commercial Solutions Opening (CSO) Area of Interest, not a standard bid, and the Army says it is not obligated to make an award. Written solutions are due by email on 11/09/2026.
Who can bid
- Selected companies must be registered in SAM.gov From CSO-AoI_LOW LEVEL Cranes_Phase 1 10-7-2026- released.pdf
- Equipment must meet relevant commercial safety, environmental and manufacturing certifications (for example ISO, ANSI, UL, CE) From CSO-AoI_LOW LEVEL Cranes_Phase 1 10-7-2026- released.pdf
- No set-aside is listed for this notice (open to any size of business)
How to submit: Email to both points of contact: Heather P. Robinson (heather.p.robinson.civ@army.mil) and Zena Johnson (zena.s.johnson.civ@army.mil), due 11/09/2026 at 10:00 AM CST (SAM.gov notice: Nov 9, 2026, 10:00 AM CST · 11:00 AM Eastern). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (5)
- Serious: Large, heavy-equipment scope. Design, fabrication, rigging, installation on 1954-era structures, and load testing of seven overhead cranes with about 95 ft bridges takes a manufacturer or a strong crane integrator, which is hard for a small firm to do alone.
- Worth checking: No promise of award. This is a Phase 1 response to a Commercial Solutions Opening, and the Army can change the requirements or never ask for a full proposal, so your response costs are at your own risk. From CSO-AoI_LOW LEVEL Cranes_Phase 1 10-7-2026- released.pdf
- Worth checking: Full submission rules are in a separate CSO posting. The AoI tells readers to review the whole ACC-ANAD CSO posting on SAM.gov for the submission and evaluation process, and that posting was not provided here, so page limits and format are unknown. From CSO-AoI_LOW LEVEL Cranes_Phase 1 10-7-2026- released.pdf
Show all 5Show fewer
- Worth checking: Must verify site conditions yourself. The contractor must check the on-site voltage before ordering parts, and the cranes must fit the existing support structures, so site knowledge matters; the site visit is voluntary but is the only way to see the building before bidding. From CSO-AoI_LOW LEVEL Cranes_Phase 1 10-7-2026- released.pdf
- Minor: Supply chain security is graded. The Army will look at where the equipment and its critical parts are made, which can hurt bidders that rely on imported components.
Read from the notice and 1 attachment. Show which files.
- CSO-AoI_LOW LEVEL Cranes_Phase 1 10-7-2026- released.pdf (read)
Full summary
What they want
- Replace seven main low-level cranes in Building 400 with new cranes (furnish, deliver, install)
- Crane sizes: three 20-ton, four 10-ton (two with about 95 ft bridge, two with about 51 ft bridge), each paired with a 5-ton auxiliary hoist
- Six cranes remote-controlled; one 20-ton crane is cab-operated (retrofit an existing cab with new trolley, chair, controls, A/C)
- Design to CMAA Class D heavy service, top-running bridges on the existing support structures, 480 V 3-phase 60 Hz power
- Meet the stated infinitely variable speeds (hoists up to 12 ft/min, aux hoist up to 23 ft/min, trolley up to 80 ft/min, bridge up to 120 ft/min)
- Run no-load and full-load tests on each crane with Army staff present before acceptance
- Train Government staff on operation and basic maintenance
- Minimize disruption to ongoing depot operations during installation
- Contract type
- Commercial Solutions Opening (CSO) Area of Interest, Phase 1 submission; the type of any resulting award is not stated
- Place of performance
- Anniston Army Depot, Building 400, Anniston, AL
- Estimated value
- Not stated
- Contract vehicle
- ACC-ANAD Commercial Solutions Opening W911KF-25-S-C002 (AoI A0018)
- How they'll choose
- Merit-based evaluation of three factors; Factors 1 and 2 are equally important and Factor 3 checks that the price is fair and funds are available
- Offers due
- 11/09/2026 at 10:00 AM CST (SAM.gov notice: Nov 9, 2026, 10:00 AM CST · 11:00 AM Eastern) (from the version posted Oct 7, 2026; amended since)
- How to submit
- Email to both points of contact: Heather P. Robinson (heather.p.robinson.civ@army.mil) and Zena Johnson (zena.s.johnson.civ@army.mil)
What they'll judge offers on
- Factor 1: Technical and Innovative Merit (performance and specifications, compliance with commercial standards, ease of integration, degree of innovation)
- Factor 2: Delivery and Lifecycle Sustainment (delivery and logistics plan, warranty and post-sale support, supply chain security, operator and maintenance training)
- Factor 3: Price and Funds Availability (fair and reasonable price; selection depends on available funds)
What to include when you submit
- Email subject line must state: CSO-AoI A0018 Low Level Cranes
- Questions are due by 11/02/2026 at 10:00 AM CDT, by email to the same two contacts
- Late solutions are not eligible for evaluation
- Voluntary site visit 10/28/2026 at 9:00am; RSVP to the Contract Specialist by 10/21/2026
- Site visit attendees without a badge need a Real ID at the Main Gate; no travel or lodging is paid
Not in the notice text
- Estimated value or budget
- Contract type and period of performance (including installation timeline) for any resulting award
- Page limits, volumes and format for the written solution (the parent CSO posting W911KF-25-S-C002 was not provided)
- Exact bridge and span dimensions (most are shown as approximate)
- Whether a phase 2 proposal or prototype is expected after Phase 1
- Bonding, insurance, and base-access requirements for installers
More to check before you bid
- SAM.gov's text for this notice doesn't describe the work. The work is described in its attachments, listed under Notice details.
Notice details
Notice type, codes, versions and files
- Posted
- Oct 7, 2026
- Notice type
- Solicitation
- Office
- W6QK ACC Anad, Anniston, AL
- Product/service code
- 3950 · Winches, Hoists, Cranes, and Derricks
- Business type
- Manufactured parts & equipment (FedReady's grouping, from NAICS 333923)
- Versions
5 versions have been posted, newest first.
- Nov 19, 2026 · Amendment 0004Due Nov 30, 2026
- Nov 10, 2026 · Amendment 0003Due Nov 30, 2026 (changed)
- Nov 5, 2026 · Amendment 0002Due Nov 16, 2026 (changed)
- Oct 7, 2026 · Amendment 0001 (this version)Due Nov 9, 2026
- Oct 7, 2026 · SolicitationDue Nov 9, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Wolf Creek Powerhouse Bridge Crane RehabilitationThis is a sources sought notice (market research, not a request for offers) from the Army's Nashville engineer district for rehabilitating a 250-ton bridge crane at the Wolf…
- Vandenberg Crane ReplacementOnly small businesses can bid. The Air Force's AFSC office wants a crane replaced at Vandenberg, with the place of performance listed as Lompoc, California.
- Lift BeamThe Department of the Navy (NAVSUP Weapon Systems Support) is asking for quotes on a lift beam under a firm-fixed-price (FFP: one set price, whatever the work ends up costing)…
- Hoist Blocks, Naval Base San DiegoSources sought (a market survey, not a solicitation) from NAVSUP Fleet Logistics Center San Diego, notice N0024427Q0010, to find small businesses that can make and deliver 2 each…
- KBAO Link River Dam Overhead HoistThe Bureau of Reclamation's Klamath Basin Area Office is asking which companies can supply one new 5-ton electric wire rope hoist for Link River Dam in Klamath Falls, Oregon.