Award Notice
HACCP EIAMD Site 08
Department of Defense · Department of the Navy
From the notice***UPDATED 09SEP2026 WITH (NOTICE OF AWARD)*** The requirement is to perform HACCP Implementation for EIAMD System Site 8 Construction. The primary objective of this project is to conduct baseline surveys for plants and LFA in specific locations and to conduct subsequent… Read more
Closed
This contract has been awarded
Awarded to Pacific Federal Management Inc (GU) for up to $128K (IDIQ ceiling) on Sep 9, 2026. That's the most the contract can be worth, not what will be paid. Award number N6274222D1812.
Recent Navy contract awards: who won →
These similar contracts are still open:
- Sources Sought Notice: Asbestos and Lead Management ServicesThe National Institutes of Health (NIH) wants small businesses to send a capability statement (a short paper on what your firm can do) for a future contract for asbestos, lead…
- SR-71 Cultural Resource Management Service
- Harris South Project Environmental Impact Statement
- Or-Malheur NWR-Stubble Fire Seeding ProjThe U.S. Fish and Wildlife Service (Interior Department) wants a cultural resource inventory, a survey for archaeological and historic sites, before emergency seeding after the…
- Pine Bluff Arsenal Testing, Lab and Engineering ServicesThe Department of the Army (W6QK ACC-RI) wants quotes under solicitation W519TC27QA031 for environmental testing, lab and engineering services at Pine Bluff Arsenal, Arkansas.
Notice details
Notice type, codes, versions and files
- Posted
- Sep 8, 2026
- Notice type
- Award Notice
- Award number
- N6274222D1812
- Office
- Navfacsyscom Marianas
- Product/service code
- F099 · Natural Resources/Conservation – Other
- Business type
- Consulting & professional services (FedReady's grouping, from NAICS 541620)
- Attachments
Full notice text from SAM.gov
***UPDATED 09SEP2026 WITH (NOTICE OF AWARD)*** The requirement is to perform HACCP Implementation for EIAMD System Site 8 Construction. The primary objective of this project is to conduct baseline surveys for plants and LFA in specific locations and to conduct subsequent follow-on surveys to determine if construction HACCP plans are effective.