Combined Synopsis/Solicitation
USDA Design/Build Perimeter Security Enhancement Parking Lot 9
Department of Agriculture · USDA, Departmental Administration
AI summary Beta
This summary may miss requirements: 7 of 15 attachments weren't read (Attachment 4 Aerial view of USDA Headquarters.pdf, Attachment 5 Location Map Lot 9.pdf and 5 more). Check the attachments on SAM.gov.
Phase 1 of 2 (solicitation 124PCA27Q0002): the U.S. Department of Agriculture (USDA) wants a design/build contractor (one firm does the design and the construction) to finish the halted Parking Lot 9 perimeter security project at the Jamie L. Whitten Building in Washington, DC. Phase 1 quotes carry no price and are due January 6, 2027, 2:00 PM Eastern; a mandatory site visit is December 2, 2026, and a firm that skips Phase 1 is out. The work covers bollards, resurfacing, sinkhole repair, electrical and landscaping, finished within 11.5 months of Notice to Proceed (NTP).
Who can bid (6)
- Attend the mandatory site visit; firms that do not attend are non-responsive From INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf
- Valid general contractor's license in the District of Columbia From Attachment 1 SOW Lot 9 11.19.2026.pdf
- Active registration in the System for Award Management (SAM.gov) under NAICS 237310 From RFQ 124PCA27Q0002 SF1442.pdf
Show all 6Show fewer
- Design architects and engineers registered in the District of Columbia; final design documents stamped by a professional engineer licensed in DC From Attachment 1 SOW Lot 9 11.19.2026.pdf
- Key personnel (Design Project Manager, Design Discipline Leads, Construction Project Manager, Construction Superintendent, Quality Control Manager) are evaluated in Factor 4 From INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf
- Prior experience and past performance, scored in Factor 3 (how many projects and which count is in the part of the instructions that was not read) From INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf
How to submit: Email to the Contracting Officer, Gerardo F. Rivera, at gerardo.rivera@usda.gov. Electronic quote only; no fax or mail. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (12)
From the version posted Nov 19, 2026.
- Serious: Two phases: only Phase 1 is open now. Phase 1 (no price) is due January 6, 2027; Phase 2 (oral presentation and price) is issued by amendment with no date given yet, and skipping Phase 1 shuts a firm out. From INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf
- Serious: Phase 2 reach: advisory down-select. USDA advises the top firms to go on to Phase 2; firms advised not to proceed have five calendar days to ask to continue, and Phase 2 is still a draft that may change. From INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf
- Serious: Mandatory site visit on December 2, 2026. The visit is at 10:30 AM EST at Parking Lot 9, and all attendees must be emailed to the Contracting Officer by December 1, 2026, 2:00 PM EST. From INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf
Show all 12Show fewer
- Serious: District of Columbia licenses required. The builder needs a valid DC general contractor's license, and the design team must be DC-registered with a DC-licensed professional engineer stamping the final design. From Attachment 1 SOW Lot 9 11.19.2026.pdf
- Serious: Performance and payment bonds at 100%. A bond is a surety guarantee of the job; a small firm needs surety capacity for the full price, and work cannot start until bonds are approved. From INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf
- Worth checking: Incomplete drawings and unknown sinkhole extent. The 2021 drawings are not complete and the full extent of the sinkholes over the Metro tunnels is unknown, yet the job is one fixed price. From INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf
- Worth checking: Liquidated damages of $1,800 per calendar day. Liquidated damages are a daily charge for finishing late; budget the schedule risk in the price. From INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf
- Worth checking: WMATA approvals and costs. WMATA reviews every design package and bills for each meeting and site visit; it may also require a building permit, railroad insurance and a videographer. From Attachment 1 SOW Lot 9 11.19.2026.pdf
- Worth checking: Work start time unclear. The instructions say work starts within 1 calendar day after NTP, which looks like a typing error; ask the Contracting Officer. From INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf
- Minor: Davis-Bacon wage rule applies. Construction wage rate clauses apply, and a wage determination (DC20260002) is attached; price labor at those rates. From Attachment 2 FAR and AGAR Clauses.pdf
- Minor: Long badging time for workers. Worker identification badges, with fingerprinting, can take a couple of months, so apply early. From Attachment 1 SOW Lot 9 11.19.2026.pdf
- Minor: Date passed (Jan 28, 2026): Langan report year differs in the SOW. The scope of work gives the Langan geotechnical report as January 28, 2025 in one place and January 28, 2026 in others; the attached report file is dated 01.28.2026. From Attachment 1 SOW Lot 9 11.19.2026.pdf
Read from the notice and 8 attachments. 7 of 15 not read. Show which files.
- INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf (read)
- RFQ 124PCA27Q0002 SF1442.pdf (read)
- Attachment 1 SOW Lot 9 11.19.2026.pdf (read)
- Attachment 8 SOW Original Lot 9 design reference only 06.20.2022.pdf (read)
- Attachment 2 FAR and AGAR Clauses.pdf (read)
- Attachment 13 USDA Whitten 100pct Spec Submission R2 04.16.2021.pdf (read)
- Attachment 11 Langan Geotechnical Report 01.28.2026.pdf (read)
- Attachment 3 Davis Bacon Wage Determination 11.13.2026.pdf (read)
- Attachment 4 Aerial view of USDA Headquarters.pdf: not summarized: open it on SAM.gov
- Attachment 5 Location Map Lot 9.pdf: not summarized: open it on SAM.gov
- Attachment 6 Below Grade Metro Site Map at Lot 9.pdf: not summarized: open it on SAM.gov
- Attachment 7 Signage and Pavement Marking Plan at Lot 9.pdf: not summarized: open it on SAM.gov
- Attachment 10 Electrical Scope addendum by JPA Inc 10.29.2025.pdf: not summarized: open it on SAM.gov
- Attachment 9 AECOM Drawing CIV 103 SITE AND UTILITY DRAWING.pdf: not summarized: open it on SAM.gov
- Attachment 12 USDA Whitten Lot 9 100pct drawing submission 04.16.2021.pdf: not read (it couldn't be opened): open it on SAM.gov
Full summary
What they want
- Finish Level IV perimeter security at Parking Lot 9: update the incomplete 2021 drawings and specifications, and check the bollards and granite curbs already stored on site
- Find the full extent of the sinkholes and repair them with a plan approved by the Washington Metropolitan Area Transit Authority (WMATA, the Metro operator), following Langan's Option 2
- Fix the north boundary so each bollard top is at least 36 inches above grade, with the maker (Guardiar, or approved equal) certifying an M50/P1 crash rating
- Electrical work per the James Posey Associates scope, traffic control arms, badge readers and moveable bollard controls
- Mill and repave the lot, stripe and sign it, update grading, and do landscaping with an irrigation system
- Build a critical path method (CPM) schedule within 3 weeks of NTP, with weekly updates, plus weekly Microsoft Teams project meetings
- Keep a quality assurance and quality control (QAQC) team and a safety plan, and meet the design submittal, as-built drawing, warranty and O/M manual duties in the scope of work (SOW)
- Two-year warranty and two-year preventive maintenance contract for the moveable (hydraulic) bollards at project completion
- Contract type
- Firm-fixed-price (FFP: one set price, whatever the work ends up costing); one award; Phase 1 non-price quote, price comes in Phase 2
- Period of performance
- Work ready for use not later than 11.5 months after Notice to Proceed (NTP); the SF 1442 continuation sheet shows March 1, 2027 to February 15, 2028
- Place of performance
- 1400 Independence Ave., S.W., Washington, DC 20250: Parking Lot 9 (corner of 12th St. SW and Independence Ave SW)
- Estimated value
- Not stated
- How they'll choose
- Best value tradeoff in two phases. Phase 1 rates Factors 1 to 4 and gives an advisory down-select; Phase 2 adds an oral presentation (Factor 5) and price (Factor 6)
- Offers due
- January 6, 2027, 2:00 PM EST (Phase 1 only)
- How to submit
- Email to the Contracting Officer, Gerardo F. Rivera, at gerardo.rivera@usda.gov. Electronic quote only; no fax or mail
- Page limits
- Factor 1 cover letter: 2 pages maximum. Limits for Factors 2 to 4 are in part of the instructions that was attached but not read
What they'll judge offers on
- Factor 5 (Phase 2): Oral Presentation, Technical Approach, 1 hour, more important than Factor 2
- Factor 2 (Phase 1): Technical Understanding and Capabilities, most important of the Phase 1 factors
- Factor 3 (Phase 1): Prior Experience and Past Performance, less important than Factor 2
- Factor 4 (Phase 1): Management Plan and Key Personnel, less important than Factor 3
- Factor 6 (Phase 2): Price, firm-fixed price in CLIN 0001 with a detailed breakdown; Factors 2, 3, 4 and 5 together outweigh price
- Factor 1 (Phase 1): Transmittal Cover Letter and Required Documents, rated acceptable or not acceptable only
What to include when you submit
- Send one single PDF covering Factors 1 to 4; do not include any pricing in it, since price is a Phase 2 item
- Email subject line: RFQ # 124PCA27Q0002, Lot 9 Security Enhancement, Quotation, Vendor Name
- Format: single-spaced, 8.5 by 11 paper, at least 12-point text, 9-point tables, 8-point graphics, numbered pages
- Cover letter: company name and address, point of contact, Unique Entity Identifier (UEI) / SAM number, business size under NAICS 237310, date submitted and quote expiration date
- Quotes must be valid for at least 90 days after the solicitation close date
- Put any exceptions or assumptions to the terms on a separate page within the cover letter
- Send all questions only to the Contracting Officer by email, with subject line: RFQ 124PCA27Q0002, Lot 9 Security Enhancement, Questions, Vendor Name
- Email the Contracting Officer the names of all site visit attendees before the site visit
- Do not contact USDA program staff directly about this requirement
After award, you must have
- Performance and payment bonds, each 100% of the contract price, furnished within 14 calendar days of award; Notice to Proceed follows bond approval From INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf:
Performance and Payment Bonds are required equal to 100% of contract…
- General liability insurance of at least $500,000 per occurrence, plus workers' compensation, employer's liability of at least $100,000 and automobile liability, kept for the life of the order From INSTRUCTIONS TO OFFERORS LOT 9 11.19.2026.pdf:
…coverage written on a comprehensive form of policy of at least $500,000 per occurrence.
Current contractor
No incumbent is named. An earlier construction contractor began work in February 2024; its contract was allowed to expire and no work has been done on site since the summer of 2025. This is a restart of that project.
Not in the notice text
- Part of the Instructions to Offerors was attached but not read (about 17,000 characters in the middle: the rest of Factor 1 and the details, page limits and required content of Factors 2 to 4); check the full file on SAM.gov
- Also attached but only partly read: the Attachment 1 scope of work, the Attachment 11 Langan report, and the Attachment 13 specifications; Attachment 12 (2021 drawings) was too large to read
- Attached but not read (scanned): Attachments 4, 5, 6, 7, 9 and 10, including the electrical scope by JPA Inc dated 10.29.2025 and the Metro site map
- Phase 2 due date, oral presentation date and price instructions are not given; they come by amendment
- The amount of the property damage liability insurance is left as a blank placeholder in the instructions
- The Notice to Proceed date is not given
- The Government's cost estimate is not stated
Notice details
Notice type, codes, versions and files
- Posted
- Nov 19, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- USDA, Ocp-Pod-Acq-MGMT-Branch-FTC, Fort Collins, CO
- Product/service code
- Z2LZ · Repair or Alteration of Parking Facilities
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237310)
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park EnhancementsInvitation for bids (IFB: sealed bids, the lowest bid wins) 69056726B000012: the Federal Highway Administration (FHWA), Western Federal Lands Division, wants trail improvements…
- W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds RenovationThe U.S. Army Corps of Engineers (Rock Island District, Detroit Project Office) plans to buy a renovation of roads, parking and grounds at a site in Wayne County, Detroit,…
- Administrative Parking Lot RepairsThe U.S. Forest Service (Department of Agriculture) wants three administrative parking lots in Colorado repaired and resurfaced: crack sealing, pavement patching, seal coating…
- Sepa Parking Lot Repaving and RepairsThe Department of Energy's Southeastern Power Administration (SEPA) wants a contractor to repave and repair the parking lot at its office in Elberton, Georgia.