Award Notice
Joe Pool Dam Slide Repairs
Department of Defense · Department of the Army
From the noticeINVITATION FOR BID W9126G26BA010 for Joe Pool Dam Slide Repair at Joe Pool Lake, Texas. This announcement is a competitive small business set aside, firm-fixed price, Joe Pool Dam Slide Repair civil works construction services at Joe Pool Lake, Texas. Read more
Closed
This contract has been awarded
Awarded to SES Constructors LLC (TN) for $4.6M on Nov 9, 2026. Award number W9126G27CA001.
Recent Army contract awards: who won →
These similar contracts are still open:
- Upper Mississippi River Restoration (UMRR) Pool 12 Floodplain Forest Stage One (1) - Habitat Rehabilitation and Enhancement Project (HREP)The U.S. Army Corps of Engineers, Rock Island District, issued sources sought notice W912EK27T0002 to find construction businesses that can build the Upper Mississippi River…
Notice details
Notice type, codes, versions and files
- Posted
- Nov 9, 2026
- Notice type
- Award Notice
- Award number
- W9126G27CA001
- Office
- W076 ENDIST FT Worth, Fort Worth, TX
- Product/service code
- Z2PC · Repair or Alteration of Unimproved Real Property (LAND)
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237990)
- Attachments
Full notice text from SAM.gov
AWARD NOTICE: INVITATION FOR BID W9126G26BA010 for Joe Pool Dam Slide Repair at Joe Pool Lake, Texas. This announcement is a competitive small business set aside, firm-fixed price, Joe Pool Dam Slide Repair civil works construction services at Joe Pool Lake, Texas. The North American Industry Classification System code (NAICS) for this procurement is 237990-Other Heavy and Civil Engineering Construction which has a small business size standard of $45 Million. The Product Service Code is Z2PC-Repair or Alteration of Dams. Project Scope: The contractor shall repair four shallow slides (Slides 18, 20, 21, and 28) on the upstream and downstream dam embankment slopes. Work includes the removal of slide debris; excavation of the slide area with bench-cutting into the stable embankment and a keyway into the foundation toe; lime-treatment of excavated soil; placement and compaction of treated soil to restore original design contours; and final surface restoration with riprap on the upstream slope and topsoil with vegetation on the downstream slope.