USACE Sacramento District DB/DBB Construction – $465M Small Business MATOC
Department of Defense · Department of the Army
AI summaryPresolicitation (a heads-up before the solicitation): only small businesses can bid, and Phase One proposals are tentatively due 30–45 days after the solicitation is issued. The U.S. Army Corps of Engineers Sacramento District plans up to seven multiple-award contracts (a multiple award task order contract, MATOC) for construction work, with $465,000,000 in shared capacity over an 8-year ordering period. No response due date is given yet. More in the summary
Advance notice of a coming solicitation, not a bid yet. If it asks for capability statements, sending one is free and puts you on Department of the Army's list before the solicitation is posted. See the contact
A newer version of this notice was posted Oct 26, 2026. See the latest version.
AI summary Beta
Summary of the version posted Oct 21, 2026. The notice was amended Oct 26, 2026. Check what else changed on SAM.gov.
Presolicitation (a heads-up before the solicitation): only small businesses can bid, and Phase One proposals are tentatively due 30–45 days after the solicitation is issued. The U.S. Army Corps of Engineers Sacramento District plans up to seven multiple-award contracts (a multiple award task order contract, MATOC) for construction work, with $465,000,000 in shared capacity over an 8-year ordering period. No response due date is given yet.
Who can bid (4)
- Small business under the planned total small business set-aside; the size standard for NAICS 236220 is $45,000,000.00 in annual revenue
- Enough bonding to cover the value of all awarded task orders
- Active SAM registration before the solicitation closing date
Show all 4Show fewer
- PIEE registration to submit a proposal
How to submit: Proposals through the Procurement Integrated Enterprise Environment (PIEE, piee.eb.mil) Solicitation Module; no other means is accepted. What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (6)
- Serious: Phase One proposals; later phases not described. The notice names Phase One proposals, tentatively due 30–45 days after the solicitation is issued, but doesn't say what later phases exist or who may take part, so missing Phase One could shut a business out.
- Serious: Bonding required for all task orders. A small business must be able to get bonding (a surety guarantee) large enough for every task order it wins, with orders up to $20,000,000.00.
- Worth checking: No response due date yet. SAM.gov gives no response date, and the Government may change, delay or cancel the project; watch PIEE and SAM.gov for the solicitation.
Show all 6Show fewer
- Worth checking: PIEE registration needed to submit. Proposals are accepted only through PIEE, and registration should be done at least one week before the proposal due date.
- Minor: Changes are not sent to bidders. USACE won't tell you about changes, so you must check PIEE and SAM.gov yourself.
- Minor: E-Verify expected. The future contract is expected to require E-Verify, the federal system that checks employees' work eligibility, and sustainable acquisition rules.
Read from the notice text only.
Full summary
What they want
- Perform construction task orders by design-build (the contractor designs and builds) and design-bid-build (the Government supplies the design)
- Work may include new construction, additions, alterations, renovations, repairs and maintenance of facilities and supporting infrastructure
- Compete for individual task orders, each with its own requirements; the Government estimates their size at $2,500.00 to $20,000,000.00
- Maintain enough bonding to cover the value of all awarded task orders
- Contract type
- Multiple award task order contract (MATOC) under an indefinite delivery indefinite quantity (IDIQ) contract; the planned solicitation would award firm-fixed-price contracts
- Period of performance
- 8-year ordering period: five-year base with one three-year option period
- Place of performance
- Sacramento, CA, USA
- Estimated value
- $465,000,000 total shared capacity; the Government estimates task orders between $2,500.00 and $20,000,000.00
- How to submit
- Proposals through the Procurement Integrated Enterprise Environment (PIEE, piee.eb.mil) Solicitation Module; no other means is accepted
What to include when you submit
- Register in PIEE at least one week before the anticipated proposal due date; registration is not needed to download documents but is needed to submit a proposal
- Register in the System for Award Management (SAM) before the solicitation closing date
- Mark your firm as an interested vendor on SAM.gov, which is the only plan holders and bidders list
- Phase One proposals are tentatively due 30–45 days after the solicitation is issued
Current contractor
No incumbent is named. The Government intends to award up to seven contracts, but may award more or fewer.
Not in the notice text
- The solicitation itself and its attachments are not yet posted; they will be released through PIEE and SAM.gov
- The response due date; only a tentative Phase One range is given
- What phases follow Phase One and who may take part in them
- Whether a pre-proposal conference or site visit will be held; the notice says the solicitation will identify it
- Which wage rule applies (a Davis-Bacon wage determination) and the bonding amounts
- How proposals will be evaluated
Eligibility and how to respond
- Set aside for small businesses: only a business that counts as small under this notice's NAICS code can bid as the prime contractor. More open small business set-asides under NAICS 236220
- How to submit, from the AI summary: Proposals through the Procurement Integrated Enterprise Environment (PIEE, piee.eb.mil) Solicitation Module; no other means is accepted. Check it in the notice before you send anything.
- Construction contracts over $2,000 pay at least the local Davis-Bacon wage rates, from the wage determination in the solicitation. Price your labor from it: How to price a government contract, and how Davis-Bacon differs from the Service Contract Act.
Notice details
- Posted
- Oct 21, 2026
- Notice type
- Presolicitation
- Office
- W075 ENDIST Sacramento, CA
- Product/service code
- Y1JZ · Construction of Miscellaneous Buildings
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 236220)
- Versions
3 versions have been posted, newest first.
- Oct 26, 2026 · Amendment 0002No date on SAM.gov
- Oct 21, 2026 · Amendment 0001 (this version)No date on SAM.gov
- Sep 8, 2026 · PresolicitationNo date on SAM.gov
- Attachments
Past awards and competition
Who has won work like this before, the likely incumbent, and what similar contracts paid, from USAspending.gov.
Before you respond
- How to read a government solicitation
- How to price a government contract
- Set-aside contracts explained
- Limitations on subcontracting
Terms on this notice: Solicitation, Set-aside
Full notice text from SAM.gov
Similar open opportunities
- Small Business D/B Military Construction MATOCPhase II of a two-phase U.S. Army Corps of Engineers (USACE) Louisville District buy, under the Department of the Army, for a target of seven firm-fixed-price multiple-award task…
- Sources Sought Notice - VISN 7 Construction MATOC 36C24726R0026The VA's Network Contracting Office 7 is doing market research (a sources sought notice, not a solicitation) to find Service-Disabled Veteran-Owned Small Businesses for a future…
- Callao, Peru Infrastructure Modernization - U.S. Army Corps of Engineers (USACE) – Latin America and Caribbean District (SAA)The U.S. Army Corps of Engineers (Latin America and Caribbean District) is doing market research for a possible design-build project at the Callao Naval Base in Lima, Peru: seven…