Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Department of Defense · Department of the Army
This opportunity has closed (responses were due Nov 20, 2026)
Recent Army contract awards: who won →
These similar contracts are still open:
- Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund SiteThe Army Corps of Engineers, Omaha District wants a contractor to dig a bypass tunnel (adit) into the Nelson Tunnel Superfund site near Creede, CO, and install flow-control…
- Lowell Creek Tunnel Repairs, Seward, AlaskaThe Army Corps of Engineers Alaska District wants a contractor to repair worn areas and install new center rails in the Lowell Creek Tunnel, about 2,100 feet long, in Seward,…
- Camp Nelson National Cemetery, KY 833CM3030 – Correct FCA DeficienciesSolicitation 36C78626R0058 is set aside for service-disabled veteran-owned small businesses (SDVOSB): only certified SDVOSBs can bid.
AI summary Beta
Summary of the version posted Oct 16, 2026. The notice was amended Nov 17, 2026. Check what else changed on SAM.gov. Some details are in the notice's attachments, which this summary didn't read. Check the attachments on SAM.gov.
The U.S. Army Corps of Engineers (USACE) Omaha District plans to issue a request for proposals (RFP) in November 2026 for construction of an interim remedial action (a cleanup remedy) at the Nelson Tunnel Superfund Site, one mile north of Creede in Mineral County, Colorado. The work is to drive a new bypass adit (a horizontal mine tunnel) and build bulkheads in an abandoned mine. The RFP will be unrestricted, and the planned proposal due date is January 2027.
Things to watch
- Worth checking: Site visit instructions are in an attachment. The notice says to follow the site visit instructions in the attached document and respond by the date shown; whether the visit is required isn't stated here.
- Worth checking: Not a solicitation yet. Offers sent in response to this notice will not be accepted or evaluated; the RFP is planned for November 2026 with proposals due in January 2027.
- Worth checking: Specialized underground construction. The work is tunnel driving and bulkhead construction in an abandoned hard rock mine at a Superfund site, which calls for mining and remediation experience.
Read from the notice text only.
Full summary
What they want
- Install a new adit south of Nelson Tunnel to bypass the Nelson Tunnel Portal Pool
- Rehabilitate Nelson Tunnel from the bypass adit connection to the planned bulkhead location
- Install a flow control bulkhead in Nelson Tunnel against a sudden uncontrolled release
- Install an accessible bulkhead flow control structure in the Commodore 5 level
- Place of performance
- One mile north of the town of Creede in Mineral County, Colorado
- Estimated value
- Not stated
Not in the notice text
- The site visit instructions and the date to respond are in the attached document, which wasn't read; whether the visit is required isn't stated.
- Which wage rule applies (such as a Davis-Bacon wage determination) is not stated.
- Contract type, period of performance, contract value, bonding and evaluation method are not stated.
- The attachment points to an EPA website for more information.
Notice details
Notice type, codes, versions and files
- Posted
- Nov 17, 2026
- Notice type
- Presolicitation
- Office
- W071 ENDIST Omaha, NE
- Product/service code
- Y1LC · Construction of Tunnels and Subsurface Structures
- Business type
- Construction & renovation (FedReady's grouping, from NAICS 237990)
- Versions
2 versions have been posted, newest first.
- Nov 17, 2026 · Amendment 0001 (this version)Due Nov 20, 2026
- Oct 16, 2026 · PresolicitationDue Nov 20, 2026
- Attachments