Combined Synopsis/Solicitation
End of the World Long Term Stewardship
Department of Agriculture · Forest Service
A newer version of this notice was posted Nov 20, 2026. It moves the due date from Nov 18, 2026 to Dec 11, 2026, which is the date shown on this page. See the latest version.
AI summary Beta
Summary of the version posted Sep 23, 2026. The notice was amended Nov 20, 2026. The due date moved from Nov 18, 2026 to Dec 11, 2026. Check what else changed on SAM.gov. This summary may miss requirements: 12 of 24 attachments weren't read (C04b_1b EOTW G-Z LTIRSC SOI_12363N26R4016.xlsx, C04t_17 EOTW G-Z LTIRSC Lidar Volume Estimates.xlsx and 10 more). Check the attachments on SAM.gov.
The U.S. Forest Service wants one contractor to thin overstocked forest stands and reduce wildfire risk on the End of the World project, near Grangeville, Idaho (Salmon River Ranger District, Nez Perce-Clearwater National Forest). The long-term stewardship contract bundles timber work (layout, cutting, hauling), road work, fuels work, tree planting and thinning, and runs about 10 years (April 2027 to October 2037). The contract is not set aside for small business.
Who can bid (7)
- Open to all responsible sources; not a small business set-aside. NAICS 113310 with a 500 employee size standard.
- Bid guarantee of 20% of the proposed price for the mandatory road reconstruction work, due with the proposal. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
- Alternate payment protections (for example a payment bond or similar security) for construction work over $35,000, due within 10 days of award. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
Show all 7Show fewer
- Workforce certification, including a valid farm labor contractor certificate if the crew will transport, drive or house workers, and a DOL certificate if using H-2B workers. Subcontractors must certify too. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
- Experience and past performance information on recent projects. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
- Active SAM.gov registration with a Unique Entity ID and a taxpayer ID on the certifications. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
- Davis-Bacon wage rates apply to road reconstruction work; a Service Contract Act wage determination is also listed among the solicitation files. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
How to submit: Email to Mark Phillipp (mark.phillipp@usda.gov) and Matt Daigle (matthew.daigle@usda.gov), due 11/18/2026 0800 MT per the solicitation form (SAM.gov lists Nov 18, 2026 09:00 in UTC-8, so confirm the time zone). What to include is under Full summary below. Check the solicitation's instructions on SAM.gov.
Things to watch (12)
- Serious: SAM.gov and the solicitation disagree on the set-aside. SAM.gov lists no set-aside, but the solicitation the AI read says a set-aside for small businesses. Ask the contracting officer which applies before you bid.
- Serious: Very large 10-year bundle of many trades. One contractor must handle logging, hauling, road building, fuels work, planting and thinning for over ten years, which is a lot for most small firms to staff, finance and subcontract. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
- Serious: 20% bid guarantee due with proposal. You must post the guarantee up front, and missing or wrong paperwork can get the proposal rejected. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
Show all 12Show fewer
- Serious: Evaluation criteria and price schedule not available in the text read. The notice points to FAR 52.212-2 for evaluation and to a spreadsheet for line items, so how you will be scored and what you must price could not be confirmed. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
- Serious: No price escalation except fuel. You must price for ten years on current conditions, so cost increases in labor, equipment and materials are your risk. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
- Worth checking: Alternate payment protections required. A payment bond or similar security must be arranged within 10 days of award for the road construction work. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
- Worth checking: Optional work not guaranteed or in a set order. The Government can award optional items in any order, so future work and cash flow are uncertain. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
- Worth checking: Payment partly in stewardship credits. Land management work is paid with stewardship credits as well as appropriated funds, which changes how and when you are paid compared with a normal service contract. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
- Worth checking: Federal wage rules and annual wage updates. Davis-Bacon and Service Contract Act wage determinations apply and will be updated each year, raising labor cost and payroll paperwork. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
- Worth checking: Farm labor and H-2B workforce certifications. You must describe your workforce and show farm labor contractor registration if you transport or house workers, and your subcontractors must sign too. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
- Worth checking: Seasonal and wildlife work limits. Hauling, logging and instream work are limited by season, weekend rules and wildlife windows, which squeezes the working calendar. From C04j_7 Project Design Elements.pdf
- Minor: Date passed (Nov 18, 2026): Conflicting due time. The solicitation form says 8:00 a.m. Mountain while SAM.gov shows 9:00 in a UTC-8 zone (10:00 a.m. Mountain), so submit early and confirm the time. From C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf
Read from the notice and 12 attachments. 12 of 24 not read. Show which files.
- C04a_1a EOTW G-Z LTIRSC_12363N26R4016.pdf (read)
- C04o_12 FP-24 Specifications.pdf (read)
- C04g_5b FSSS Jungle Bird.pdf (read)
- C04h_6a Jungle Bird Mandatory CAM.pdf (read)
- C04i_6b_EOTW GZ LTIRSC Overview Map.pdf (read)
- C04j_7 Project Design Elements.pdf (read)
- C04k_8 Layout Note Template.pdf (read)
- C04m_10 End of the World Marking Guide.pdf (read)
- C04n_11 Least Cost Road Standards.pdf (read)
- C04q_14 Planting and Reforestation Description of Work.pdf (read)
- C04r_15 PCT Description of Work.pdf (read)
- C04s_16 Jungle Bird Mandatory Timber Cruise.pdf (read)
- C04b_1b EOTW G-Z LTIRSC SOI_12363N26R4016.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- C04t_17 EOTW G-Z LTIRSC Lidar Volume Estimates.xlsx: not read (the AI doesn't read this file type yet): open it on SAM.gov
- C04u_18 EOTW G-Z LTIRSC LiDAR Process.pdf: not summarized: open it on SAM.gov
- C04v_19 EOTW G-Z LTIRSC GIS Data.zip: not read (the AI doesn't read this file type yet): open it on SAM.gov
- C04c_2 EOTW GZ IRSC Appendix A.pdf: not summarized: open it on SAM.gov
- C04d_3 EOTW GZ LTIRSC Appendix B.pdf: not summarized: open it on SAM.gov
- C04e_4 EOTW G-Z LTIRSC Appendix C - Jungle Bird T-Specs.pdf: not summarized: open it on SAM.gov
- C04f_5a_EOTW G-Z LTIRSC Appendix D-Jungle Bird Road Plans.pdf: not summarized: open it on SAM.gov
- C04l_9 Road Survey Description of Work.pdf: not summarized: open it on SAM.gov
- C04p_13 PCT Survey Template.pdf: not summarized: open it on SAM.gov
- C04w_20 SCA WD 1955-0228v68 Dated 08142026.pdf: not summarized: open it on SAM.gov
- C04x_21 DBA WD ID20260080 Mod 1 Dated 05182026.pdf: not summarized: open it on SAM.gov
Full summary
What they want
- Timber sale preparation: lay out harvest units, set cutting specs, GPS units and temporary roads, and make map and volume records for the Forest Service
- Cut, skid, deck, load and haul sawlog and non-sawlog timber (tractor and skyline/tether systems), with no more than two contract areas operating at once
- Survey haul roads and do road maintenance, reconstruction, decommissioning and obliteration
- Fuels work: excavator piling, hand fireline and fuel break, landing cleanup and slash throwback
- Reforestation and erosion control, including hand tree planting
- Precommercial thinning (PCT) surveys and thinning of young stands
- Timber cruise and volume determination in the optional contract areas
- Price every line in the Mandatory Work, Optional Work and Timber Removal price schedules (unit prices prevail)
- Contract type
- Long-term stewardship contract (Integrated Resource Service Contract, IRSC) with mandatory and optional line items; commercial item format under FAR Part 12. Payment is in stewardship credits and appropriated funds.
- Period of performance
- 04/01/2027 to 10/30/2037. The attachments do not spell out a base year and option year structure.
- Place of performance
- Salmon River Ranger District, Nez Perce-Clearwater National Forest, near Grangeville, Idaho
- Estimated value
- Total not stated. Only the mandatory Item 2 road reconstruction work is given a price range of $350,000 to $550,000.
- Offers due
- 11/18/2026 0800 MT per the solicitation form (SAM.gov lists Nov 18, 2026 09:00 in UTC-8, so confirm the time zone) (from the version posted Sep 23, 2026; amended since)
- How to submit
- Email to Mark Phillipp (mark.phillipp@usda.gov) and Matt Daigle (matthew.daigle@usda.gov)
What to include when you submit
- Price proposals must cover every item in the Mandatory Work, Optional Work and Timber or other products Removal price schedules, using the fillable Schedule of Items spreadsheet
- Include the 20% bid guarantee for the mandatory road reconstruction work with the proposal
- Complete the offeror blocks of the SF 1449 solicitation form
- Return Exhibit 1 certifications: workforce (MSPA, farm labor contractor registration, H-2B), government employee status, taxpayer ID and SAM UEI
- Return the Exhibit 2 experience questionnaire (projects in last three years) and have past performance references fill out the past performance questionnaire
- Business proposal requirements are in FAR 52.212-1, which was not read (it may be an attached file the AI skipped; check SAM.gov) in the readable text
Not in the notice text
- How the award is decided and the evaluation factors (FAR 52.212-2 was not in the readable text)
- The full list of mandatory and optional line items and quantities (the Schedule of Items spreadsheet was not read)
- Total contract value and the price magnitude of everything other than mandatory road reconstruction
- Base period versus option structure within the April 2027 to October 2037 period
- Proposal format, page limits and other business proposal requirements in FAR 52.212-1
- Contents of Appendices A through D, the T-specs, road plans, road survey work statement and wage determinations, which were not read
- Exact bid guarantee form accepted and the type of alternate payment protection allowed
- Whether any past performance minimum or other experience threshold applies
More to check before you bid
- The notice names requirements:
- The notice text says this is set aside for small businesses, but SAM.gov lists no set-aside. Ask the contracting officer which one applies before you bid.
Notice details
Notice type, codes, versions and files
- Posted
- Sep 23, 2026
- Notice type
- Combined Synopsis/Solicitation
- Office
- USDA-FS, Stewardship Contracting Branch, Washington, DC
- Product/service code
- F099 · Natural Resources/Conservation – Other
- Business type
- Environmental & natural resources (FedReady's grouping, from NAICS 113310)
- Versions
3 versions have been posted, newest first.
- Nov 20, 2026 · Amendment 0002Due Dec 11, 2026
- Nov 9, 2026 · Amendment 0001Due Dec 11, 2026 (changed)
- Sep 23, 2026 · Combined Synopsis/Solicitation (this version)Due Nov 18, 2026
- Attachments
Before you respond
- How to respond to a solicitation (8 steps)
- How to read a government solicitation
- How to price a government contract
Terms on this notice: Solicitation
Full notice text from SAM.gov
Similar open opportunities
- Invitation for Bids, Camp Navajo, Arizona, Salvage ContractThis is a sealed-bid salvage timber sale, invitation for bids DACA63-9-26-0522, from the Department of the Army (Fort Worth District, U.S. Army Corps of Engineers), for Camp…
- Invitation for Bids, Camp Navajo, Arizona, Lump Sum ContractThis is a sealed-bid timber sale (Invitation for Bids DACA63-9-27-0509): the Army Corps of Engineers Fort Worth District is selling ponderosa pine on about 980 acres at Camp…
- C-53 Bravo Timber Sale - Eglin AFB, FLEglin Air Force Base, Florida (Air Force, FA2823 AFTC PZIO) is selling pine timber, and the winning bidder pays the Government.
- Raystown Lake "Timberdoodle" Timber SaleThe U.S. Army Corps of Engineers is selling timber (not buying a service) at the Timberdoodle Timber Sale on Raystown Lake in Huntingdon County, Pennsylvania.
- Leverich Helio Stewardship IRSCThe Forest Service is doing market research (a sources sought, or request for information) for the Leverich Helio Stewardship IRSC (solicitation 12363N26Q4248): an Integrated…